A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Electrical Tests of HTS Twisted-pair Cables With Helium Gas Cooling Task 5. High Tc superconducting link Partners CERN R&D of HTS twisted pair cables Bruker.
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
A. Ballarino, 21/11/2014 Wrap up from WP6 A. Ballarino for the WP6 CERN, Geneva KEK, 21 st November th Hi-Lumi LHC Extended Steering Committee.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Optimisation of Roebel cable for HTS accelerator magnets
Superconductivity Practical Days at CERN
NED and post-NED WUT involvement NED S.C. meeting Maciej Chorowski.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Superconducting Links for accelerator technology A.Ballarino CERN, TE-MSC-SCD Eucard’13, CERN With contributions from the SCD SL Team (B.Bordini, S.Giannelli),
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
EuCARD2 Magnet Status and action plan
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
Superconductivity Practical Days at CERN
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Superconducting Fault Current Limiters
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
Heat management issues A perspective view centered on the design of superconducting devices Opinions of L. Bottura At the mWorkshop on Thermal Modeling.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
19./20. September 2007 Current leads for FAIR Cryogenic Expert Meeting 19./20. September 2007 Birgit Weckenmann.
HFM-WP7 Status, FK & GdR, April WP7 HFM Status F. Kircher (CEA Saclay) and Gijs de Rijk (CERN) EuCARD Annual meeting RAL, April 2010.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
In-Field Resistance of REBCO Electrical Joints at 4.2 K
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC High Field Magnet program and HE-LHC Luca Bottura & Gijs de Rijk CERN 1.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 Cold Powering New Baseline A.Ballarino 27/10/2015.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10- Future Magnets.
Prospects for the use of HTS in high field magnets for future accelerator facilities A. Ballarino CERN, Geneva, Switzerland.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
High Temperature Superconducting (HTS) Cable Project
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Superconducting Links R2E and Avalilability Workshop
Task 5: High-Tc superconducting link Summary of work-package
EuCARD2 WP10.2 main results and open issues
The R&D programme on High Field Magnets (HFM)
UK-HL-LHC WP4 Cold Powering
HO Corrector Magnets: decapole test and future plans
To be presented at Nb3Al R&D Review,
Cable and Strand test facility
EuCARD2 WP 10.2 HTS Conductor
Superconducting Links and Cold Powering components for HL-LHC
Jeremy Weiss & Danko van der Laan Chul Kim & Sastry Pamidi
Optical fiber based sensors for low temperature and superconductors
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino, B. Bordini, J. Fleiter, A. Gharib, G. Hurte (CERN) V. Cubeda, G. Grasso, M. Tropeano (Columbus) C. Beduz, Y. Yang (University of Southampton) A. Aubele, A. Hallbauer (Bruker HTS) CERN,

A. BallarinoEucard MeetingCERN,20/03/2013 Disclaimer: The presentation strictly follows instructions received from WP leader  Aim of the Task  Main achievements  Status of deliverables  Post-Eucard era Outline

A. BallarinoEucard MeetingCERN,20/03/2013 Aim of the Task and Deliverable Objective: demonstrate possibility of providing remote powering of LHC magnets fed from LHC P7 using HTS SC-links. Initial concern: potential higher heat load on existing Nb-Ti SC-links. Present concern: need to remove power converters from the tunnel radiation environment. Configuration of SC-Link at LHC P7 could be applied also at LHC P3 Deliverable: Design and assembly of a superconducting link, 20 m long, containing 24 pairs of 600 A HTS cables. The test of the link is not included in the Task

A. BallarinoEucard MeetingCERN,20/03/2013 HTS Link for the LHC Machine – P7 Current Leads and Power Converters ~ 250 m P3 would require the same type of link 48 cables rated at 600 A per link Two links each about 500 m long

A. BallarinoEucard MeetingCERN,20/03/2013 Layout of the link in the LHC tunnel Preliminary integration studies, Y. Muttoni

A. BallarinoEucard MeetingCERN,20/03/2013 Main achievements 1.Development of a novel type of cable (twisted-pair cable) made from tape conductor and optimized for DC electrical transmission. Iop  1 kA Conductors: MgB 2, YBCO and BSCCO Cable geometry and cabling process accommodate for the different mechanical properties of the three conductors 2Validation of 2 m long cables at 4.2 K (Fresca). Iop up 2  K and in self-field 3Preparation of short (up-to 5m) multi-cable assembly (2  24 cables) as required for integration in the SC-Link for LHC P7

A. BallarinoEucard MeetingCERN,20/03/ A A  5.6 mm  = 40 Twisted-pair cable (Iop  1000 A)

A. BallarinoEucard MeetingCERN,20/03/2013 Main achievements 4.Construction at Southampton University of a test station enabling the operation of 5 m SC-link and of the associated current lead cryostat. Coolant:He gas at variable temperatures. Design and assembly at CERN of 5 m long complete (2  24 MgB 2 cables) SC link (48 cables in Nexans semi-flexible cryostat) integrated in the test station in Southampton and successfully tested in nominal operating conditions 5.Design and assembly at CERN of a test station enabling the measurement of 20 m long cables and SC-links in a variable temperature range (5 K-70 K, I up to 20 kA). Commissioning of the test station in Dec Successful test of 20 m long twisted-pair YBCO cable pair assembly 6.Design and construction at CERN of two cabling machines enabling the controlled assembly of the twisted-pair cables: stacking + electrical insulation, twisting + electrical insulation

A. BallarinoEucard MeetingCERN,20/03/2013 CERN SC-Link Test Station

A. BallarinoEucard MeetingCERN,20/03/2013 Main achievements 7.Quench tests performed on a full-scale 5 m long SC-Link at Southampton University. Verification of radial heat transfer – quench of one cable should not provoke a resistive transition in the other cables contained in the same SC-Link cryostat (different electrical circuits). Test confirming “sufficient” thermal insulation. Analysis and modelling on- going 8.Cabling of 100 m of stacked, insulated and twisted conductor being launched at CERN – using the newly developed cabling machines 8.Agreed deliverable – 20 m long superconducting link assembly – planned to be available by end of April 2013 – MgB 2 tape conductor provided by Columbus in the framework of the Eucard collaboration

A. BallarinoEucard MeetingCERN,20/03/2013  Test at CERN of the Eucard deliverable (20 m long link)  Parallel development in collaboration with Columbus Superconductors of MgB 2 round wires for application to high-current cables (up to 20 kA)  Design assembly and test of 60 m a long SC-link system as required for integration in the LHC machine at Point 7  Development and test of high-current cables, multi-cable assemblies (Itot > 150 kA) and SC-links for application at LHC P1 and P5 (vertical transfer along  80 m)  SC-Links transferring the current from the surface to the LHC tunnel for the LHC Hi-Luminosity upgrade Post Eucard-era

A. BallarinoEucard MeetingCERN,20/03/2013 Thanks for your attention !