ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
ERCOT Under Frequency Load Shed Testing
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
NERC LTRA Update / CDR Capacity Counting Issues
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
Frequency Control Turbine Governor Droop NERC Requirement
Houston Area Dynamic Reactive Project March 11,
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
April 23 rd OWG UFLS Survey & Power Factor Review.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
ERCOT Generation Adequacy Study TAC Meeting February 7, 2002.
Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512)
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Generation Adequacy Task Force Update to WMS November 18, 2009.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
Standards Review Subcommittee Update August 17, 2010.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Operations Report Kent Saathoff System Operations ERCOT.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Responsive Reserve Service Deliverability Review September 15,
Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.
1 TAC Report to the ERCOT Board November 14, 2006.
Synchronous Inertial Response
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Jan 22, TAC Report to the ERCOT Board January 22, 2003.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Reactive Power Task Force
Project WECC-0100 Update Load Modeling Task Force
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power

DWG – Report to ROS The flat start with wind models continues, using PSS/e Rev This should be completed by the end of August. The DWG discussed the Annual Dynamics Data Recorders determination. DWG recommends making no changes to the dynamics monitoring device (DDR) recommendations, which haven’t changed since March 2005.

DWG – Report to ROS The DWG reviewed the Oncor 600 MVAr Parkdale Dynamic Reactive project, and found that it is based on sound engineering and is worthy of ERCOT’s support. We continue to discuss Voltage Recovery Criteria, in order to reach a resolution. New criteria were proposed using the concept of reactive margin testing. Members will investigate the impact on their systems.

DWG – Report to ROS The DWG discussed implementing the new Combined Cycle Models that have just been developed. The consultant converted the data for all of the combined cycle models in the ERCOT data, but there are opportunities to use the new models with the gas turbine units, in order to represent their frequency dependent behavior. Members will investigate this, and share issues they encounter in their own systems. We also discussed the use of the GGOV1 model, and other governor modeling issues.

DWG – Report to ROS The Procedure Manual will be updated. Members volunteered to take the manual by sections, and suggest revisions. John Schmall will be making a presentation to a NERC Standards Drafting Team on the Underfrequency Loadshed studies and reports that DWG performed in 2001 and The next DWG meeting has been tentatively set for September 26 & 27.

DWG Tasks TaskStatus Flat start 2007 caseComplete Flat start 2010 caseComplete Flat start 2007 case with wind models. Working Publish 2006 flat start book. Complete Publish 2007 flat start book. Working Make annual determination of the number and location of dynamic monitoring devices. Complete

DWG Tasks Dynamic Voltage Recovery criteria Working Review recently approved NERC Standards with respect to ERCOT Op Guides and Protocols Working Participate in ROS Ad Hoc Task Force regarding Power System Stabilizers Working Annual Procedural Manual review/update Working Begin 2008 flat start activities Fall Activity

Review of Responsive Reserve Study “Utilizing High-set Load Shedding Schemes To Provide Responsive Reserve Services” DWG Report - November 2002

Responsive Reserve - Study Results Limit of interruptible load that can be used to replace Responsive Reserve Results based on Sensitivity studies – Spring Off-Peak case: Case % 575 MW High-set Case 2 -50% 1150MW High-set Case 3 -75% 1725 MW High-set Case % 2300 MW High-set Level a: 59.7 Hz Any <= 60 % (1380 MW) N/A Level b: 59.8 Hz Any <= 40 % (920 MW) N/A Level c: 59.9 Hz Any <= 55 % (1265 MW) N/A

Responsive Reserve - Conclusions Can increase Interruptible to 1150 MW (50%) Can increase to 1725 MW with limits on the amount of load in each of the frequency blocks UFLS Stage 59.3 Hz will trip for 2500 MW generation loss Frequency overshoot can be avoided by limiting the amount of load in each of the frequency blocks

Responsive Reserve - Recommendations Increase present rule to allow 1150 MW (50%) to be met by interruptible load tripped at 59.9 Hz, 59.8 Hz, and 59.7 Hz. Consider eventual increase to 1725 MW (75%) if no problems are noted with experience at 50% Monitor the responsive load in real time. Establish criteria for performance of generating units providing responsive reserve service.

Issues for DWG Comment What studies need to be completed before changes to RRS are considered? What reliability concerns are raised by increasing LaaRs based upon 50% of a proposed new responsive reserve requirement of 2500 MW, or 2700 MW?

Issues for DWG Comment How much higher LaaR maximum limit would be possible if frequency tiered deployment were considered? What has changed in key criteria/assumptions used in 2002 DWG study and do such changes indicate a need for an update of this study?

Issues for DWG Comment What would be involved in the way of a Responsive Reserve / LaaRs engineering study, and how long before any results would be known?

DWG Comments Frequency overshoot is the issue, when all load trips at a single frequency If all load trips at one frequency, then 1150 MW is the limit. If load shed is tiered, then 1725 MW is the limit for LaaRs.

Changes in Key Assumptions DWG 2002 study did not consider the amount or behavior of wind generation Accuracy of relays is an issue System inertia is less for off-peak and minimum conditions More is known about the behavior and effective droop of generators

Changes in Key Assumptions New models are available for combined-cycle units, and the frequency-dependency of gas turbines can now be modeled Load shedding frequency tier proposals may have changed (EILS)

A new Responsive Reserve /LaaRs Study Basic methodology from previous study can be used Need to calibrate data to match governor response Collect and review information concerning historical LaaR performance

A new Responsive Reserve /LaaRs Study If ROS provides guidance about the amount of RRS to use, it will simplify the studies, and reduce the complexity More RRS values, potential LaaR values, more frequency tiers will take additional time and resources

A new Responsive Reserve /LaaRs Study Key DWG members are involved with other projects Significant ERCOT staff time and computer resources will be required ROS will need to make a request to ERCOT management to allocate the needed resources

A new Responsive Reserve /LaaRs Study A study scope will need to be prepared for ROS approval It would be helpful if ROS would designate a representative to help narrow down the expectations and clearly define the scope for the study