Open house 2013 slides T. Brown. 1.6-m FNSF Super-X Divertor Configuration.

Slides:



Advertisements
Similar presentations
Device Parameters of Heliotron J Coil System L=1/M=4 helical coil 0.96MAT Toroidal coil A0.6MAT Toroidal coil B 0.218MAT Main vertical coil 0.84MAT Inner.
Advertisements

PPPL ST-FNSF Engineering Design Details Tom Brown TOFE Conference November 10, 2014.
Studies of ST-FNSF mission and performance dependence on device size J. Menard 1, T. Brown 1, J. Canik 2, L. El Guebaly 3, S. Gerhardt 1, S. Kaye 1, M.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
AT Pilot Plant EM and Structural Studies P. Titus.
P ROGRESS ON THE O VERALL P OWER C ORE C ONFIGURATION OF THE ARIES-ACT X.R. Wang 1, M. S. Tillack 1, S. Malang 2 1 University of California, San Diego,
Progress on the Configuration Design of the Fusion Power Core for the ACT (Draft) X.R. Wang M.S. Tillack S. Malang Sept. 29, 2011.
29 July Lane Carlson, Charles Kessel Mark Tillack, Farrokh Najmabadi ARIES-Pathways Project Meeting Washington, D.C. June 29-30, 2010 Exploring the.
Optimization of Spherical Torus as Power Plants -- The ARIES-ST Study Farrokh Najmabadi and the ARIES Team University of California, San Diego ISFNT-5.
Physics of fusion power
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Development of the New ARIES Tokamak Systems Code Zoran Dragojlovic, Rene Raffray, Farrokh Najmabadi, Charles Kessel, Lester Waganer US-Japan Workshop.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
Progress on Engineering and Costing Algorithms for ARIES Systems Code Zoran Dragojlovic, Rene Raffray, Chuck Kessel and Leslie Bromberg ARIES Project Meeting.
Overview of the ARIES-ST Study Farrokh Najmabadi University of California, San Diego Japan/US Workshop on Fusion Power Plants & Related Technologies with.
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
Magnetic Fusion Power Plants Farrokh Najmabadi MFE-IFE Workshop Sept 14-16, 1998 Princeton Plasma Physics Laboratory.
Highlights of ARIES-AT Study Farrokh Najmabadi For the ARIES Team VLT Conference call July 12, 2000 ARIES Web Site:
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
ARIES Systems Studies: ARIES-I and ARIES-AT type operating points C. Kessel Princeton Plasma Physics Laboratory ARIES Project Meeting, San Diego, December.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
Y. ASAOKA, R. HIWATARI and K
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
FNSF Maintenance and Research Strategy Siegfried Malang and Mohamed Abdou FNST Meeting held at UCLA, August 3, 2010.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
Configuration Studies for an ST-Based Fusion Nuclear Science Facility (FNSF) Dr. Jonathan Menard on behalf of: M. Boyer 1, T. Brown 1, J. Canik 2, B. Covele.
3D Finite Element Analysis for Ribbed Structure Vacuum Vessel By: Hamed Hosseini Advisor: Prof. Farrokh Najmabadi.
NSTX_U Design Point Study Active H2O Cooling Pulse Length 60 sec C Neumeyer 5/19/6.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
Systems Code – Hardwired Numbers for Review C. Kessel, PPPL ARIES Project Meeting, July 29-30, 2010.
Physics of fusion power Lecture 9 : The tokamak continued.
EAST Data processing of divertor probes on EAST Jun Wang, Jiafeng Chang, Guosheng Xu, Wei Zhang, Tingfeng Ming, Siye Ding Institute of Plasma Physics,
Vacuum Vessel Recent Progress. Horizontal or Vertical Rib? Over-Stressed Spots We get over-stressed spots on the horizontal ribs (Very high stress spots)
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
ST-FNSF Mission and Performance Dependence on Device Size J. Menard 1 T. Brown 1, J. Canik 2, L. El-Guebaly 3, S. Gerhardt 1, A. Jaber 3, S. Kaye 1, E.
Design Point Studies for next step device National High-heat-flux Advanced Torus Experiment NHTX C Neumeyer 6/8/6.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
Wind Turbine Power Plant. Sources ●
Load Transformers These are electromagnetic devices which can ‘step up’ or ‘step down’ ac voltages. A 240 volt supply can be converted to (for example)
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
Status of Upgrading Project of Tokamak T-15 E. Azizov 1), P. Khvostenko 1), I. Anashkin 1), V. Belyakov 2), E. Bondarchuk 2), O. Filatov 2), V. Krylov.
Configuration Studies for an ST-Based Fusion Nuclear Science Facility (FNSF) Presented by Dr. Laila El-Guebaly on behalf of: J. Menard 1, M. Boyer 1, T.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
Comments on ARIES-ACT 1/2011 Strawman L. El-Guebaly Fusion Technology Institute University of Wisconsin-Madison
Updates of the ARIES-CS Power Core Configuration and Maintenance
Instrumentation for status monitoring of SST-1 superconducting magnets
Fiber optic sensors integration in magnets and in test facilities
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Design Concept of K-DEMO for Near-Term Implementation
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Isometric Drawing.
University of California in San Diego
Comments on ARIES-ACT 10/20/2010 Pre-Strawman
Reactor Building Concept Assessment
Elements of the TF coils that I visited:
What I have learned from EAST experiments 胡友俊
The DTT project – Il progetto DTT
University of California, San Diego
Presentation transcript:

Open house 2013 slides T. Brown

1.6-m FNSF Super-X Divertor Configuration

ST-FNS facility layout

Pilot plant Advanced Tokamak (AT) design Double-null divertor Coolant supply from below Vertical maintenance access S/C TF and PF coils Expanded VV space Machine support at the base Horizontal ports for Aux equipment and RM assistance

AT Pilot plant device core / facility integration

Republic of Korea K-DEMO Isometric View

Local rib structure Inboard leg winding detail Outboard leg winding detail TF shown with quarter section cut Low field winding High field winding Low field winding K-DEMO two coil winding toroidal field coil