LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

F. BORGNOLUTTI Oct. 16 th 2012 Winding Test plan for the MQXF Cable.
HQ & LHQ End Parts Miao Yu Fermilab 08/27/12. HQ parts All the spacers are arriving within a week. 2.
Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.
Susana Izquierdo Bermudez, on behalf of the winding team
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Fred Nobrega October 3,  Cable is mechanically unstable, 40 x 0.7 mm dia. strand, mm wide.  PC01 had >5 popped strands on each layer, roped.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
SQXF Practice Winding 1 L2 winding Miao Yu 01/23/2014.
LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
Comments from reviewers and updated plans G. Ambrosio and P. Ferracin October,
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
Superconducting Magnet Group Future of HQ coils S. Caspi 8/25/2011.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
BATTERY BOOSTING A battery may go ‘DEAD’ from many different causes. A ‘BOOST’ may be used to start a vehicle with a dead battery. Proper equipment and.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Possible QXF v2 Fabrics E.F. Holik, Steve Krave, Miao Yu, Lucas Zimmerman QXF coil WG meeting 8/19/2015.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MANUFACTURING OF MAGNETS FOR SST-1 TOKAMAK
After Replacement MS 2406 with new motor
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
HQ Mirror Assembly R. Bossert
HQ Coil 19 Test Impregnation
Mechanical stability and QXF coil winding
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
Electrical Quality Control (QC): coil to coil parts
INNOVATIVE TECHNIQUES AND MATERIALS FOR PREVENTING CONCRETE SHRINKAGE CRACKING - Cleary, Lomboy, and Zhu Concrete shrinks due to reduction and movement.
Electrical integrity of magnets and coils
Coil Fabrication Status
Presentation transcript:

LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014

Difference between HQ and LHQ Plasma coating Winding with binder Saddle replace after curing Winding tension Popped Strands HQ coil 15 No 20 or 25 lbs? HQ 03 coils YesNo 20 lbs first turn, and then 30 lbs Occasional LHQ coil 02 YesNoYes20 lbs first two turns, and then 30 lbs 12 cases LHQ coil 03 Yes 20 lbs first two turns, and then 30 lbs 0 2

Plasma Coating 3 HQ Coil 15 HQ 3 Coils and LHQ Coil 03

LHQ Coil 03 Paint Binder and Cure the End 4

LHQ Coil 03 Saddle Replace after Curing 5

LHQ Coil 03 Electrical Measurement No short to ground/coil parts found 6 LHQ Coil 02LHQ Coil 03 Coil V V 20 Hz (mH) Hz kHz (mH) kHz Hz (mH) Hz

LHQ Coil 03 after Curing 7

Shipping to BNL 8

Summary LHQ Coil 03 was wind and cured successfully No popped strand After curing, no short between coil to ground or coil to parts. No turn to turn short Three discrepancy reports, however no damage to the cable. 1.Plasma coating cracks on one end part 2.Black mark on L1 cable (mid-plane turn) 3.Ramp turn insulation damage and repair 9

Plasma Coating Crack 10 On IL LE spacer 2

Marks on L1 cable insulation 11

L1 after curing 12 Only the insulation was damaged Replaced by wrapping 3 mil E-glass tape 48% overlap