Environmental Screening A Requirement for All CIDA Financed Projects.

Slides:



Advertisements
Similar presentations
FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE, MINING AND COMMODITIES TRANSPORT TECHNOLOGY AND INNOVATION PHARMACEUTICALS AND LIFE SCIENCES Coal Seam Gas.
Advertisements

1 Module 1: Building a Legal Foundation for Good Water Governance.
FUTURE OF PARKING IN VENICE BEACH Venice Neighborhood Council Meeting January 22, 2013.
香港民航處 Civil Aviation Department Hong Kong 1 ICAO Recommended Security Control Guidelines for Screening Liquids, Gels & Aerosols (LAGs) HK CAD 10 July 2007.
1 A&BS in Relation to Marine Genetic Resources Prof. Dr. Alexander Proelß hydrothermal systems.
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
U RBAN PGRADING Characteristics of Stressed Communities Lack of basic services Insecure or unclear tenure of land Low household incomes Dependence upon.
EOH 3101 PRINCIPLES OF ENVIRONMENTAL HEALTH LAWS AND RULES REGARDING POLLUTION AND HEALTH.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
ENVIRONMENTAL ASSESSMENT OF CANADIAN MINING PROJECTS ABROAD CML 1105I MARCH 12, 2013.
FIDIC Conference, Beijing Sustainable Quality Consulting Services Robert Robertson ADB Director Consulting Services 7 September 2005.
Safe Working Practices - Contents
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Scenario 3.  Water use  Energy supply (including hydropower development)  Security implications.
NRCS Watershed Rehabilitation
What is Commercial Recreation & Tourism?
OECD Global Forum on Sustainable Development 2-3 December, 2004, Paris Optimizing Compliance Monitoring and Enforcement: Japanese Experience in Water Pollution.
OH NO! WHAT DO WE DO NOW. WHAT DO YOU DO WHEN YOU DISCOVER THAT YOU’VE NOT BEEN DOING SOMETHING THAT YOU ARE REQUIRED TO DO? THE STORY OF RCW WATER.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND INKOMATI WMA.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
Introduction to the Obligations of the Party to the Biosafety Clearing-House Manoranjan Hota.
Conclusions from Sessions 4.2.2, and Michael Rouse Past President International Water Association (IWA) World Water Forum, Istanbul 19 May.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Legal aspects - Overview Ad hoc Working Group on the Durban Platform (ADP) New agreement: - form - substance Design features & legal techniques.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
ENVIRONMENTAL ASSESSMENT AND ABORIGINAL LANDS AND PEOPLES NOVEMBER 5, 2012.
OLDMAN DAM: ENVIRONMENTAL ASSESSMENT AND THE CONSTITUTION FEBRUARY 13, 2012.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Proposed Rule for Preventive Controls for Animal Food.
Proposed Rule: 21 CFR 507 Proposed Rule for Preventive Controls for Animal Food 1.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Environmental Impact Assessment in the Slovak republic.
Establishment of Sustainable Financing Mechanism 11 th Session of the Intergovernmental Meeting Jan 20-21, Dhaka Male’ Declaration Male’ Declaration.
Environmental Assessment Act – Overview Environmental Media Group.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Introduction to the Biosafety Clearing-House. footer What is the role of the BCH? Under Art 20, the CPB established the BCH. The Protocol sets out two.
Biosafety Clearing House Training Workshop date place.
Building Capacity on Protected Areas Law & Governance Module 7 International Law and Protected Areas Exercise 2 Domestic Compliance with International.
FINAL REPORT ON RISK ASSESSMENT AND MONITORING FOR ENVIRONMENTAL CHEMICALS PREPARED BY : TRAN THI THU DUNG, HYDROMETEOROLOGICAL COLLEGE – MINISTRY OF NATURAL.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Reform of Planning and Building Law in Estonia Sandra Mikli
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
The relationship between WTO law and foreign direct investment Paul Kruger
OLDMAN DAM: ENVIRONMENTAL ASSESSMENT AND THE CONSTITUTION SEPTEMBER 17, 2012.
CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
FDA Preventive Control Regulation Ernest Julian, Ph.D., Chief Office of Food Protection RI Department of Health AFDO 2014.
UNCCD reporting and review United Nations Convention to Combat Desertification Joint Task Force on Environmental Indicators Third session July 2011,
National workshop Pilot testing of Guidelines for updating of national implementation plans to address the new persistent organic pollutants in Abuja,
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
C H A P T E R 25 Local Government and Finance By: Mr. Thomas Parsons.
Bulk Water Supply Contracts
DETAILS OF PROJECT INTERGRATED AIRPORT CITY DEVELOPMENT CONCEPT AND MASTER PLAN 4 Star Hotel with 150 rooms and 5000 seater Conference facility Budget.
District Disaster Risk Reduction Managment Plan
Presented at the AFN National Housing and Infrastructure Forum
Nick Bonvoisin Secretary to the Convention on the
PEOPLE’s COMMITTEE OF HO CHI MINH CITY
Environmental Assessment and Licensing (EAL) in Manitoba
The Memorandum of Understanding (MOU)
Regulating Arctic Shipping Unilateral, Regional and Global Approaches
LA06 Assessment of Impacts and Adaptation Measures for the Water Resources Sector Due to Extreme Events Under Climate Change Conditions. REGIONAL PROJECT.
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
Ratification of the UNECE Protocol on Pollutant Release
Board of County Commissioners
Introduction to the Obligations of the Party to the Biosafety Clearing-House Manoranjan Hota.
Presentation transcript:

Environmental Screening A Requirement for All CIDA Financed Projects

EA Principles at CIDA  Projects outside Canada financially supported by the government of Canada are subject to the CEAA.  Environmental assessment should start as early as possible in the decision- making process.  CIDA exercises flexibility in assessing projects in foreign jurisdictions and in varying circumstances.

EA Principles at CIDA (cont.)  Assessments outside Canada are conducted with respect for foreign sovereignty, international law, and international agreements and arrangements to which Canada is party.  If the environmental procedures of foreign states and international or multilateral institutions meet the requirement of CIDA, they can be used instead of CEAA guidelines, only if they meet the basic goals and objectives of the CEAA.

EA Principles at CIDA (cont.)  CIDA encourages other countries to develop, improve, and implement their domestic capacity for environmental assessment. Procedures for public participation respect foreign sovereignty and local conditions.  Records of environmental assessments for CIDA-supported projects in countries outside of Canada are made available to the public.

CIDA environmental Forms CIDA E, CEAA Applicability form: to determine if an EA is required; CIDA E, CEAA Applicability form: to determine if an EA is required; CIDA E, Environmental Assessment and Screening Report: A template for preparing the screening report; and CIDA E, Environmental Assessment and Screening Report: A template for preparing the screening report; and CIDA E, Matrix of Environmental Issues: To assist in rating possible environmental impacts CIDA E, Matrix of Environmental Issues: To assist in rating possible environmental impacts

Construction of HHWHS The proposed construction, installation, operation, expansion, modification or decommissioning of a domestic or farm water supply system or dugout on agricultural land if the project (a) is not to be carried out, except in respect of an intake pipe, within 30 m of a water body; and (b) does not involve the likely release of a polluting substance into a water body.

Construction of HHWHS (cont.) The proposed construction, installation, operation, or expansion of a domestic or farm irrigation system on agricultural land if the project (a) is not to be carried out, except in respect of an intake pipe, within 30 m of a water body; and (b) does not involve the likely release of a polluting substance into a water body

HHWHS (cont.) The proposed construction, operation, modification, or expansion of a drainage structure on agricultural land, other than a structure that drains into a water body, if the project (a) is not to be carried out within 30 m of a water body; and (b) does not involve the likely release of a polluting substance into a water body.

FTCs/ Farm buildings 6 (1) The proposed construction, installation, operation, expansion or modification of a building that is only to be used in one or more of the ways set out in subsection (2) if the project has a footprint of less than: (a) in the case of construction or installation, 500 m2, and (b) is not to be carried out within 30 m of a water body; and (c) does not involve the likely release of a polluting substance into a water body.

FTCs/ Farm buildings (cont.) 6 (2) The following uses are set out for the purpose of subsection 6 (1): (a) providing educational or informational facilities and services; (b) providing offices, meeting rooms and related facilities; (c) providing facilities and services to passengers of common carriers; (d) providing retail sales facilities; (e) providing medical facilities and services;

FTCs/ Farm buildings (cont.) (f) providing residential, hotel, institutional or other accommodations; (g) providing recreational facilities and services; (h) providing restaurant and food take-out services; (i) providing parking facilities; (j) presenting artistic, cultural, sporting and other community-related events; and (k) storing any article or substance that is not hazardous to human beings or the environment.

FTCs/ Farm buildings (cont.) The proposed construction, installation, operation or modification of a building, other than a building to be used exclusively for one or more of the purposes set out in subsection 6(2), if (a) the construction or installation does not result in a building with a footprint greater than 100 m 2 or a height greater than 5 m; (b) the project is not to be carried out within 30 m of a water body; and (c) the project does not involve the likely release of a polluting substance into a water body.

FTCs/ Farm buildings (cont.) The proposed expansion of a building, other than a building to be used exclusively for one or more of the purposes set out in subsection 6(2), if the project (a) results in a building with a footprint no more than the greater of 100 m 2 ; (b) results in a building with a height no more than the greater of 5 m; (c) is not to be carried out within 30 m of a water body; and (d) does not involve the likely release of a polluting substance into a water body.

CIDA E, CEAA Applicability

Environmental Assessment & Screening Report E

Matrix of Environmental Issues E