M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.

Slides:



Advertisements
Similar presentations
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Advertisements

The Caserones Project October 2014 Mr. Héctor Sepúlveda O.
The Cryopit Fraser Duncan Cryopit Workshop 16 August 2011.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Skyscraper Construction
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Joy Mist Drilling System Presented By: Dave Paich Joy Mining Machinery
Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.
The ice machines are available at various capacities and can be placed where needed in the site. Capacities range from 3 to 70 tons per day. The ice is.
Henderson Mine Site. Henderson Mine Central Campus Shaft Collar Elev 10,400 ft Shaft Bottom Elev 7,500 ft LA Ramp Primary Access Ramp 3600 ft Central.
Standardized Curriculum WAP Training Plans and Resources.
12 th U.S. & North America Ventilation Symposium June 2008 Ventilation On Demand (VOD) Auxiliary Fan Project Auxiliary Fan Project D. O’Connor, Sr. Ventilation.
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Week 10. DIAMOND Adjust Your Underground Drawing As Needed Carefully work out your drilling, blasting and mucking cycle – Presumably you will blast at.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
University of Saskatchewan Geological Engineering GEOE Introduction to Mineral Engineering.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Cementation Shotcrete Accident May 23 rd Accident overview Accident Timeline Accident Causation Recommendations Safety Measures Cementation Shotcrete.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Homestake Massive Detector & Long Range Neutrino Oscillation Program 1) Introduction – Ken Lande 2) Long Base Line Neutrino Oscillations – Milind Diwan.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
DESIGN AND CONSTRUCTION OF A MODULAR MASSIVE DETECTOR AT THE HOMESTAKE LAB Modular Mass – 100 Kilotons Modular Shape –Cylinder –50m dia x 50m high Depth.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Deep Underground Large Water Cerenkov Detectors Two types have been proposed. 1) Horizontal cylinders ~60 m diameter by 180 m long – UNO & HyperKamiokande.
BGV 05-may-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : test & installation plans  point 8  LHC tunnel.
To reduce negative environmental impacts. To move towards more natural habitats. To reduce operating costs. To enhance building marketability. To improve.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
No. 6 Winze Water Level 7100 Level - Existing Waste Pass Winze Bottom Water below 7400 L.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Amanda D. Kimball Brennan Johnson Andrew Bennett Timothy Hardy Engineering Science Research Building.
Deep Underground Large Water Cerenkov Detectors Two types have been proposed. 1) Horizontal cylinders ~60 m diameter by 180 m long – UNO & HyperKamiokande.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
The Energy Policy and associated ECM Low Cost Project Energy Conservation at UNC.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
AAC Monthly Report RA-UG Mine September 2016
$150K Chicago/ANL seed funding for Braidwood site investigation
Heating, Ventilating, and Air Conditioning
Grunenwald Science and Technology Building
Detector hall in mountain regions
CEDAR Detector Ventilation System Review
Bidder’s conference – 21st May 2013
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Heating, Ventilating, and Air-Conditioning
Detector hall in mountain regions
TRENTON Casing Filler Presentation
Projected Development
Energy Efficiency for the Machine (the Gigafactory) that Makes the Machine March 9, 2018.
Polarized 3He target installation
Presentation transcript:

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Modular Configuration Mark A. LaurentiMarch Level

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Mark A. LaurentiMarch 2002 Modular Configuration 7100 Level

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR March 2002Mark A. Laurenti Modular Configuration

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Mark A. LaurentiMarch 2002 Ventilation  Total airflow for the top sill development is planned at 200,000 cfm.  The air would flow into the top access drift, down the chamber ramps and boreholes, and out of the bottom access drift on the 7100 and back to 31 Exhaust.

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Cooling Mark A. LaurentiMarch 2002  The 350-ton Dunham-Bush chiller will be used to cool development of the tops of the chambers via chilled water coils.  It is currently planned to keep the ultra-pure detector water at 50°F. Two or three 575-ton machines in the 6950 Vent Plant could supply chilled water for this task. Insulated 12“ supply and return chilled water lines will be installed across the 6950 level to the detector area  Three chambers can be excavated at the same time.

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Construction Methodology Estimated Timeline Estimated Costs Mark A. LaurentiMarch 2002 Assumptions

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Construction Methodology March 2002Mark A. Laurenti

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Mark A. LaurentiMarch 2002 General Parameters Used for Schedule & Cost 3 Shifts / Day x 5 Day / Week  Work Schedule 24 Hourly Employees For One Chamber  Manpower -3 Supervisors  Equipment For Construction Of 1 or 3 Simultaneous Chambers 4 LHD’s 2 Bolters 2 Face Jumbos 1 Long Hole Drills 2 Bench Drills 2 Lift Trucks 2 Support Vehicles 41 Hourly Employees For Three Simultaneous Chambers

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Timeline Mark A. LaurentiMarch Year One Diamond Drill Development Sill Cut Shrink Cut 80 ft Cable Bolts Shotcrete 1ft Borehole

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Timeline Year Two Mark A. Laurenti March 2002 Development 60 ft Cable Bolts Borehole 4 Bottom Cuts Decking Precast Liners

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Timeline Year Three Mark A. Laurenti March 2002 Development 60 ft Cable Bolts 6 Bottom Cuts Precast Liners

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Timeline Year Four Mark A. Laurenti March ft Cable Bolts 4 Bottom Cuts Precast Liners Shotcrete 1ft Waterproof Liner

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Timeline Mark A. LaurentiMarch 2002 Total time for excavation and construction 208 Weeks or 4 Years

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Costs For 1 Chamber ($MM) Mark A. LaurentiMarch 2002  Labor & Benefits$ 5.51  Other (Outside Contractor)$ 0.12  15% Contingency$ 2.20 TOTAL$  Mining & Construction  Equipment Operation$ 1.30  Precast Concrete Liner$ 3.25 Subtotal$ 9.06  Supplies$ 4.51

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Estimated Costs Mark A. LaurentiMarch 2002  Operating Costs Not Included In Estimate  Equipment Purchase or Lease  Cost of Waste Handling  General Operation of the Mine  Engineering, Geology  Power and water Consumption

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Mark A. LaurentiMarch 2002 Assumptions  A waste handling system is in place and capable of handling up to 540 tons per shift ( 8,000 tons / week) before the excavation work is started on the chamber.  Ventilation is sufficient enough to do more than one activity at a time in the chamber.  Labor is multi-tasked in order to operate and construct all aspects of the chamber.  After construction, shops areas and other miscellaneous excavations will be used for permanently installed equipment such as that needed for cooling, electronics, etc.

M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Mark A. LaurentiMarch 2002 Summary  Estimated construction time for one chamber is four years  Estimated cost for one chamber is $17.0MM  This is a snapshot of the planning done to date. Any future changes can only improve the design and reduce the cost and time.