Navy progress in EO Tactical Decision Aid technology LCDR Keith Everett OIC FWC STK Det Fallon.

Slides:



Advertisements
Similar presentations
CoABS Grid Military Users Group (GMUG) for the SWMU Tom Martin November 13, 2001 for LCDR Dylan Schmorrow CoABS Program Manager
Advertisements

Policy Research and Innovation Research and Innovation EUROSTARS JOINT PROGRAMME Research and Development programme undertaken by several Member States.
Student Success Task Force. 1.Increase college and career readiness 2.Strengthen support for entering students 3.Incentivize successful student behaviors.
Jim White, PMW 240T September 2012
Pseudolite Network for Space Users A GPS Augmentation Study for NASA Headquarters Code M-3 Thomas R. Bartholomew Kevin L. Brown Al Gifford.
Next-Generation Navy Electro-Optical Tactical Decision Aids Dr. Anthony Bucholtz Naval Research Laboratory Monterey, CA.
Marine Transportation System Common Assessment & Reporting Tool (CART) Mr. Thomas Kalisz, USCG “The nation needs a coordinated, integrated approach to.
COMNAVMETOCCOM Brief to the CEISC CDR Dave Pashkevich CNMOC N51/N52 (228) Jul 04.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Fall COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Weather Agency Standardizing U.S. Federal Weather XML/Web Services Mr. Michael Howland.
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Welcome MACOORA Annual Meeting October 22-23, 2008 Fall River, Massachusetts Carolyn Thoroughgood.
UNCLASS DoD Public Key Infrastructure LCDR Tom Winnenberg DISA API1 Chief Engineer 25 April 2002.
Distance Learning: Linking Community College Engineering Students with Engineering Schools (A Proposal) Jack Baskin School of Engineering University of.
Employee Self Assessment Tips for writing employee accomplishments Presented by Diana Attia June 16, 2005.
XML Registry and Repository for the Education Community Holly Hyland, Federal Student Aid.
Shared Processing Program Operations Working Group (SPOWG) November 29, 2001 Mac McCreary.
Marketing Research  Def. - Formal communication link with the environment to provide accurate and useful information for better decision making.  Systematic.
Evaluation Process. Why an Evaluation plan now at the beginning of our project? Now that you have been successful it allows you to re-confirm the objectives.
Downloaded from Accelerate scaling up of TB/HIV activities in Tanzania Dr. N.G.SIMKOKO WHO/NTLP - Tanzania.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Mobile Decision Support System: Design and Implementation Wojtek Michalowski School of Management.
SIMCorBSIMCorB 1 Outreach Projects n SIMCorB Web site (8.3.1) n Strategic partnerships with other organizations (8.3.2) n Promote awareness of scientific.
The Global Fund- structure, function and evolution February 18, 2008.
The Potentials and Limitations of Coastal Web Atlases Valerie Cummins, Director Coastal Zone ‘07, Oregon.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Bridging the Military Transfer Gap MACRAO 2013 Transfer Summer Summit Sarah Mellon University of Michigan-Flint.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Jim Vermeulen 28 May 2008.
Headquarters U. S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e © 2008 The MITRE Corporation. All rights reserved From Throw Away.
Intelligent Large Scale Sensing Systems (ILS 3 ) initiative Initiative Status and Activities Kevin M. McNeill, PhD Research Assoc. Professor Director,
Communication 2 Report Writing.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
HUD’s Homeless Assistance Ann Marie Oliva. Overview of Presentation Update on Status of Regulations Achieving the Goals of Opening Doors FY 2012 and FY.
Version, Date, POC Name 1 Purpose: Concisely state the scientific objective of the proposed basic research proposal. Product/Results: Identify the research.
USCG SPECTRUM MANAGEMENT DOD SPECTRUM WORKSHOP DOD SPECTRUM WORKSHOP
Protecting Data Rights Under DoD Contracts October 14, 2009 NCMA Workshop Cape Canaveral Chapter Keith R. Szeliga Sheppard Mullin Richter & Hampton.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Implementing Local Action Strategies and the Puerto Rico Resolution Proposal to the U.S. Coral Reef Task Force October 3, 2003 Saipan, CNMI.
Naval Oceanographic Office Homeland Security CAPT Pete Furze Nov 01 Homeland Security CAPT Pete Furze Nov 01 Committee for Operational Processing.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
U.S. Coast Guard Intelligence & Criminal Investigations
Professional Recruit Tracking System (PRTS) Purpose – Why Are We Here? –Background – Where Have We Been? –System Status – Where Are We? –Future Directions.
Proposal to Consider Transfer of Projects [IEEE Mentor Presentation Template (Rev. 0)] Document Number: IEEE Gcon Date.
DoD’s Target Control System “Developing a Corporate Strategy” Dennis Mischel Target Management Initiative Program Manager Director, Operational Test &
 Introduction to the AFFH Rule 2   Provide for better fair housing planning and address issues raised with the Analysis of Impediments process  To.
Service Oriented Approach JAFE: a Joint architecture federation environment Howard cohen (Booz Allen Hamilton) Matthew Sutton (Booz.
FY 2010 Coordinated Family and Community Engagement Grant Application.
RMISRMIS Department of the Navy Risk Management Information System Kurt Garbow Director, Aviation and Operational Safety Office of the Deputy Asst Secretary.
State and Community Collaborations: An Approach to Restricting Youth Access Steve McElravy, M.S.W.Alejandro Arias, Ed.D. U.S. DEPARTMENT OF HEALTH AND.
NTIA Briefing EL-CID, FSMS & OSM-DD
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
UNCLASSIFIED Project Stepstone Dave Pierce9 December 2009 Deputy Director Army Spectrum Management Office HQDA CIO/G6.
 Introduction to the AFFH Rule 2   Provide for better fair housing planning  Promote better understanding by program participants of AFFH  Address.
Association of Enterprise Architects International Committee on Enterprise Architecture Standards Jan 23, Collaborative Expedition Workshop #57aeajournal.org.
Coordination, Data Management, and Enhancement of the International Arctic Buoy Programme (IABP) PIs: Ignatius Rigor (PSC), Pablo Clemente-Colon & LTJG.
DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 08 October SR case number #11-S-0041 applies. 13 th Annual NDIA SE Conf Oct 2010.
UNCLASSIFIED 1 United States Joint Forces Command Joint Warfighting Center United States Joint Forces Command Joint Warfighting Center LTC John Janiszewski.
QIBA DCE-MRI Analysis Algorithm Validation Specification and Testing Daniel Barboriak M.D. Duke University Medical Center
1 December 12, 2002 Systems Sustainment Management John Baranowski Defense Acquisition University Program Director, Sustainment.
May 12, 2006 District Engineer Presentation1 Signing Performance Measures Report 2005 Data.
CHAPTER 5 NAVY RESEARCH AND DEVELOPMENT CHAPTER 5 NAVY RESEARCH AND DEVELOPMENT MODULE: NAVAL KNOWLEDGE UNIT 2: NAVAL OPERATIONS AND SUPPORT FUNCTIONS.
REGIONAL RESPONSE TEAM NOVEMBER 5, Executive Order: Improving Chemical Facility Safety & Security.
Advances and Issues WIDA 2012 Dr Andreas Goroch LCDR Keith Everett.
UNCLASSIFIED DHS Advanced Personal Protection System (APPS) for Law Enforcement.
Royal Canadian Navy Nuclear Vessel Visit Safety Program
U.S. Coast Guard Cyber Education & Training
Nada Al Dosary Edited By: Maysoon AlDuwais
NSRP Workforce Development Panel – Navy Program Manager Thoughts
Measuring Child and Family Outcomes Conference August 2008
Presentation transcript:

Navy progress in EO Tactical Decision Aid technology LCDR Keith Everett OIC FWC STK Det Fallon

2 Navy progress Outline Navy Support of TAWS Complete Illumination Server Coordinate with joint Coast Guard/NATO field study activities Next-Generation Navy EOTDA

3 Navy Support of TAWS TAWS Development

4 Navy Support of TAWS FY11 –Coordinated with USAF and USA on support and development of TAWS Made recommendation on releasability of TAWS TAWS implemented TAWS currently in development FY12 –No Navy funding for TAWS –NRL proposal submitted to PMW-120 for continued support/development of TAWS

5 Complete Illumination Server TAWS Development

6 Purpose Provide rapid accurate ephemeris data for sun, moon, illumination Maintain –Best algorithms –Best empiricism for stochastic effects Conform to best practices Approach Service Oriented architecture Joint collaboration of USNO, PMW-120, NAVO, NRL General applicability DoD Illumination Server Status DoD Illumination Server tested and accepted by CNMOC

7 Coordinate with Coast Guard field study activities TAWS Development

8 USCG Field Study SMARTEX (Small Maritime Target Experiment) –Coordinated with USCG, TNO, and UKMO in the initial planning for an IR/radar field study Mobile, AL Summer 2012 –Lack of funding prevented participation in FY12

9 Next-Generation Navy EOTDA TAWS Development

10 Next-Generation Navy EOTDA Challenge To support and develop Navy EOTDA capability in light of reduced funding for TAWS Approach Submitted NRL proposal to PMW-120 –To reinstate Navy support of TAWS –Solicit user feedback/requirements on EOTDA –Develop Next-Generation Navy EOTDA

Questions?