Date and page number - 1 Safety Management at the NNSA Service Center (Albuquerque) Dennis Curtis Complex Support Department Occupational Safety and Health.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Ways to Improve the Hazard Management Process
Elements of an Effective Safety and Health Program
Emergency Action Plans
Arc Flash: Electrical Safety in the Workplace CCIA Safety Committee SAFETY ROUNDTABLE April 10, 2012 sm 1.
U.S. Department of Veterans Affairs Veterans Health Administration Supportive Services for Veteran Families (SSVF) Program SSVF Grantee Uniform Monitoring.
FACILITY SAFETY: Creating a Safe and Secure Environment in the Community Health Center Presented by Steve Wilder, BA, CHSP, STS Sorensen, Wilder & Associates.
ACA Directorate of Contracting, Fort Bragg RECAP OF COR FUNDAMENTALS BY ADMINISTRATION DIVISION 15 February 2007.
21st Annual Joint Safety and Occupational Health Professional Development Conference (PDC) - Contractor Oversight - Outside & Inside VPP March 8, 2013.
Contractor Safety Management
Construction Training
Safety and Health Programs
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Fire and Explosion Deaths in Construction Michael McCann, PhD, CIH Director of Safety Research Tel: /
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Safety and Health Programs
Stennis Space Center March 2013 Amy Rice. The Food.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Safety W. R. Casey NSLS-II ESH Manager CFAC 5/8/08.
Contractor Safety Programs Ron Scholtz- REA, CHMM April 8, 2008.
Incident Safety Officer. Introduction Purpose: This class was developed not to “recreate the wheel,” but to focus on the issues concerning incident scene.
BUILD WITH US. ™ Contractors
Evolution Industries Jan A Lockout/Tagout (LOTO) program ensures that energized equipment or machines are not started or used while they are being.
Elements of Process Safety Management
1 April 11, VOSHA AND YOUR SCHOOL AN OVERVIEW OF YOUR REGULATORY OBLIGATIONS.
Process Safety Management
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
FY Budget Presentation to Board of Finance March 17, 2014 Building Department Robert DeMarco, Chief Building Official.
VPPPA Mentoring Program. The VPPPA Mentoring Program is a formal process to assist companies and facilities interested in participating in the Voluntary.
Ert 312 LECTURE 4 OSHA & DOSH.
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
DOE FIRE SAFETY WORKSHOP Argonne National Laboratory April 16-19, 2007.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
Model Contract Implementation at Sandia National Laboratories Risk Based Oversight Dan Pellegrino Sandia Site Office November, 2007.
OSHA – What to Expect When You’re Inspected (Following Federal Guidelines)
Jim Smith CONFINED SPACE Understanding the Space Park Requirements.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
OSHA Safety and Health Program Management Guidelines
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Oregon OSHA Grant # NFPA 70E - How to Comply with OSHA’s Electrical Standards NECA-IBEW Electrical Training Center’s Free Online Course This.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Mine Safety and Health Administration South Central District Elwood M. Burriss Staff Assistant South Central District Dallas, Texas
City Services Auditor Charter Appendix F Discussion
Workshop Topics and Deliverables
Planning for Succession
NNSA Project Reviews NNSA Office of Project Analysis, Oversight, and Review (NA-APM-1.1) June 7, 2017 Dwight Henderson, Director
Managing Safe Work Permits
Worker Safety and Health Enforcement Program Update
Health and safety organization on construction site
Global Connections Day Building Safety Service Provider
Pavan Baichoo, LABADMIN/OSH
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Contractor Assurance Systems (CAS) Summit August 23, 2016
Developing a Comprehensive Electrical Program
OPERATIONS SAFETY Donna Johnson, CSE,TSSP-RAIL/BUS
Vendor Management The Safety Qualification Package and You!
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
Presentation transcript:

Date and page number - 1 Safety Management at the NNSA Service Center (Albuquerque) Dennis Curtis Complex Support Department Occupational Safety and Health Manager Small Maintenance Support Contractor and subcontractors. Prime contractors for construction, administrative support and IT. Background

Date and page number - 2 NNSA SC Complex Electrical Safety SME assessed contractor and SC Electrical Safety Programs and processes (LOTO, Energized Work Permit, Electrical Work Planning) in light of NFPA 70E (Jul 05). –Found real deficiencies, developed CAP and used NFPA 70E’s structure and specifics for recommendations to update programs. Two completely separate electrical incidents in one day (Jan 06). –One incident by a prime NNSA contractor. –Other involved two subcontractors. –Assigned by SC Director to perform a Type B “like” investigation.

Date and page number - 3 Type B “Like” Investigation Major Finds

Date and page number - 4 Type B “Like” Investigation Major Finds Contracting Officers, Contract Specialists and CORs require training on importance and specifics of ES&H requirements and use of ES&H SMEs. –Develop interim ES&H training. –Develop formal annual local training by SMEs –Update CO, COR appointment letters to emphasis ES&H requirements. –*Working to get this concept in DOE wide contracting training.

Date and page number - 5 Type B “Like” Investigation Major Finds Ensure adequate oversight. –Developed Work Authorization Program/Permit (includes security reviews and on the Intranet). –Funded fulltime contractor safety person. –Weekly formal ES&H inspections by Feds. –Required PHA for site maintenance contractor Davis Bacon projects.

Date and page number - 6 Type B “Like” Investigation Major Finds Strengthen configuration management to insure drawings (data) are available prior to construction and upon completion. –Updated project processes to provide contractors with current drawings. –Updated project processes to require as-built drawings. Other Initiatives Created Energized Work Permit, Contracted Arc Flash Analysis Set up interim NFPA 70E training for electricians, HVAC mechanics and alarm mechanics. Working on NFPA 70E certification training. Created a path for Fed and Contractor injury reporting.

Date and page number - 7

Date and page number - 8 Safety Basics and 10 CFR 851 Assuring Contractor Oversight of Subcontractors as part of 10 CFR 851 implementation and an effective Contractor Assurance System (CAS) –Assurance of Training and Qualification of Subcontractors –Assurance of Subcontractor Work Planning, Site Hazards Analyses (PHA). ID and Controls Flow down and implementation of landlord safe work procedures –Clarity of Contracting safety terms for Multi-employer Relationships (NFPA 70E)

Date and page number - 9