Status of the SPL cryo-module development (report from WG3) V.Parma, CERN, TE-MSC.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS cavities interfaces
V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Rossana Bonomi ESS Cryomodule Status Meeting, 9/1/2013.
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Status of the SPL cryo-module development (report from WG3) V.Parma, TE-MSC (with contributions from WG3 members)
The SPL Short Cryo-module: Requirements V.Parma, CERN, TE-MSC Conceptual Design Review of the SPL Short Cryomodule CERN, 4 th November 2011.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
SLHC WG3 (Cryomodule) summary & plan with recommendation to the CB V.Parma, CERN TE-MSC P. DUTHIL, IN2P3-CNRS 3rd SPL collaboration meeting, CERN
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Rossana Bonomi R. Bonomi TE-MSC-CMI SPL Seminar 2012.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Status of the SPL cryo-module design V.Parma, CERN, TE-MSC On behalf of the SPL cryomodule development team (CERN, CEA-Saclay, CNRS-IPNO Orsay, ESS)
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
R. Bonomi - SLHiPP2, Catania 3-4/5/20121 SPL Thermal Studies R. Bonomi Superconducting linacs for high power proton beams - Catania, 2012.
Cavity Supporting Scheme Paulo Azevedo, CERN – TE/MSC SPL Conceptual Review, 04/11/2010.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Plans for CERN SPL Test Cryomodule W. Weingarten on behalf of V. Parma, CERN.
SPL RF coupler: integration aspects
TDR guideline discussion on Cavity Integration
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
WP5 Elliptical cavities
Roadmap for triplet cryostats
Ti/SS transitions A.Basti INFN-PISA*
T5.2: Harmonization - Material and Component Reference
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
CERN Cryomodule Requirements for Crab Cavities
Superconducting RF Crab Cavities
Design of a SHORT Cryomodule for the Superconducting Proton Linac of CERN IPNOrsay – CNRS Sébastien ROUSSELOT Patxi DUTHIL Patricia DUCHESNE Philippe DAMBRE.
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
Magnetic shielding and thermal shielding
Presentation transcript:

Status of the SPL cryo-module development (report from WG3) V.Parma, CERN, TE-MSC

Outline Reminder of the frame of WG3 Cryomodule Specification meeting (19 th September last) Recent advances: Summary and outlook

Short cryo-module: Goal & Motivation Goal: Design and construct a ½-lenght cryo-module for 4 β =1 cavities Motivation: Test-bench for RF testing on a multi-cavity assembly driven by a single or multiple RF source(s) Enable RF testing of cavities in horizontal position, housed in their helium tanks, tuned, and powered by machine-type RF couplers Validate by testing critical components like RF couplers, tuners, HOM couplers in their real operating environment Cryo-module-related goals: Validation of design – Innovative supporting of cavities via the RF couplers Learning of the critical assembly phases: – handling of long string of cavities with complete RF coupler – alignment/assembly in the cryostat Validation through operational experience: – Cool-down/warm-up transients and thermal mechanics – Gas-cooled RF coupler double-wall tube – Alignment/position stability of cavities – Cryogenic operation (He filling, level control, etc.)

Working group (WG3) System/ActivityResponsible/memberLab Machine architectureF.GerigkCERN WG3 coordinationV.ParmaCERN Cryo-module conceptual designV.Parma. Team: N.Bourcey, P.Coelho, O.Capatina, D.Caparros, Th.Renaglia, A.Vande Craen CERN Cryo-module detailed design & Integration CNRS P.Duthil (P.Duchesne) + CNRS Team CNRS/IN2P3-Orsay Cryostat assembly toolingP.Duthil (P.Duchesne)CNRS/IN2P3-Orsay WG 2 activity (RF cavities/He vessel/tuner, RF coupler) W.Weingarten/S.Chel/O.Capatina/ E.Montesinos CERN, CEA-Saclay Vacuum systemsS.CalatroniCERN CryogenicsU.WagnerCERN Survey and alignmentD.MissiaenCERN

Main contributions for short cryo-module InstituteSupply CEA – Saclay (F)1.Design of β=1 cavities (EuCARD task ) 2.Design & construction of 4 helium vessels for β=1 cavities (French in-kind contribution) 3.Supply of 4 (+4) tuners (French in-kind contribution) 4. Testing of RF couplers CNRS - IPN – Orsay (F)1.Design and construction of prototype cryomodule cryostat (French in-kind contribution) 2.Design & construction of cryostat assembly tools (French in- kind contribution) Stony Brook/BNL/AES team (Under DOE grant) 1.Designing, building and testing of 1 β=1 SPL cavity. CERN1.4 (+4) β=1 cavities CERN1.4 (+5) RF couplers

Goal of the cryomodule spec meeting (CERN 19th September 2010) Identify and address still outstanding cryo-module design specification issues Address the specific requirements related to the test program of the short cryomodule at CERN (for ex. : windows for in- situ intervention, need for diagnostics instrumentation, etc.). Converge towards a technical specification to allow the continuation of the engineering of the short cryo-module, or identify road-maps to settle outstanding issues. Engineering Specification in preparation at CERN (end 2010) 20 participants from: CEA-Saclay, CNRS-IPN, JLAB, SNS, FNAL, ESSS and CERN

Cavity alignment requirements BUDGET OF TOLERANCE StepSub-stepTolerances (3σ)Total envelopes Cryo-module assembly Cavity and He vessel assembly± 0.1 mm Positioning of the cavity w.r.t. external referential ± 0.5 mm Supporting system assembly± 0.2 mm Vacuum vessel construction± 0.2 mm Transport and handling (± 0.5 g any direction) N.A.± 0.1 mm Reproducibility/Stability of the cavity position w.r.t. external referential ± 0.3 mm Testing/operation Vacuum pumping ± 0.2 mm Cool-down RF tests Warm-up Thermal cycles Construction precision Long-term stability Transversal position specification

Cryogenic Scheme E E’ C C2 XB X Y C3 C1 L

Pipe sizes and T, p operating conditions...a few figures still to be settled

Short cryomodule: layout sketch Connection to cryo distribution line CW transition RF coupler, bottom left side Cavity additional support 1.7% Slope (adjustable 0-2%) Cryo fill line (Y), top left Technical Service Module End Module Phase sep.

Cavity Supporting System BUDGET OF TOLERANCE StepSub-stepTolerances (3σ)Total envelopes Cryo-module assembly Cavity and He vessel assembly± 0.1 mm Positioning of the cavity w.r.t. beam axis ± 0.5 mm Supporting system assembly± 0.2 mm Vacuum vessel construction± 0.2 mm Transport and handling (± 0.5 g any direction) N.A.± 0.1 mm Stability of the cavity w.r.t. beam axis ± 0.3 mm Testing/operation Vacuum pumping ± 0.2 mm Cool-down RF tests Warm-up Thermal cycles Construction precision Long-term stability Transversal position specification

2 K Heat Loads (per β =1 cavity) Operating conditionValue Beam current/pulse lenght40 mA/0.4 ms beam pulse20 mA/0.8 ms beam pulse cryo duty cycle4.11%8.22% quality factor10 x x 10 9 accelerating field25 MV/m Source of Heat LoadHeat 2K Beam current/pulse lenght40 mA/0.4 ms beam pulse20 mA/0.8 ms beam pulse dynamic heat load per cavity5.1 W20.4 W static losses<1 W (tbc) power coupler loss at 2 K<0.2 W HOM loss in cavity at 2 K<1<3 W HOM coupler loss at 2 K (per coupl.) <0.2 W beam loss1 W 2 K8.5 W25.8 W

SPL cryomodule specification meeting, CERN 19th October 2010 Issues identified and work in progress Functional/Design requirements: Magnetic shielding: 2 level of shielding proposed – 1st cryo T. cryo-perm or other (A4K?). Active cooling? (No, answer today). Interesting solution of Spiral 2 cryo-module (A4K, active cooling) – 2nd RT: remagnetisation of low carbon steel?; mu-metal shield? “fast” cool-down (Q desease mitigation): 100 K/h as a goal (though not a specif requirement yet; vertical tests will tell) inter-cavity bellows: no active cooling, but T measurement for monitoring

SPL cryomodule specification meeting, CERN 19th October 2010 Issues identified and work in progress Interfaces/operational functionalities: Cryostat windows requested for in-situ maintenance (for prototype only)  will need large windows! – access to tuners (motors, piezos) – access to HOM ports (there are 2) Connection to cryo distribution line. Confirmed: – Welded solution for connection to the cryo distribution line – Flexibility on connection to allow tilt change (0-2%) Cryo distribution line in SM18. Supply of 50K helium for thermal shield. Outstanding: – This needs an additional distribution line in SM18 or heating of existing supply line. – T, p, and He flow rates requiremnts in work Clarify warm-up transients and means (heater boil-off of helium, insulation vac.degradation?) Cryogenics with and without slope (ESSS specific) – Adjustable slope foreseen (0-2%) – Redundant cryogenic equipment  simple to complex control possible – He liquid connection between cavities (hydrostatic head link) could be added if retained necessary

SPL cryomodule specification meeting, CERN 19th October 2010 Issues identified and work in progress Instrumentation requested for cavity testing: He pressure gauge lHe level sensors (redundancy) temperature-sensors at strategic points (bellows, magnetic shield, HOM couplers, power coupler 8 HOM couplers with (broadband) feedthrus and RF cables to room temperature loads (rated 100 W) sufficiently thermally anchored pressure gauges for cavity vacuum (outside cryostat) and insulation vacuum 4 heaters inside He tank (among others used for measurement of Q-value)

SPL cryomodule specification meeting, CERN 19th October 2010 Issues identified and work in progress Instrumentation for cryogenics/cryo-module purpose: Alignment Monitoring System: choice pending – On-line monitoring movements and vibrations of the Cold Mass (CM) during cool down and steady state operation – Requires referentials on helium vessel Measurements of HL 2K – Pressure gauge measurement in 2K circuit  leak-tight feed-thru – He flow-meter would be useful – T gauge in He bath (not strictly necessay) but would be useful Cryogenic operation instrumentation: – 25 W electrical heaters in helium bath: 1 per cavity, 1 in Phase Separator – He level gauge: 1 per cavity, 1 in Phase Separator  needs to be in He bath so needs leak-tight feedthru – T gauge: 1per cavity (could be outside He vessel) Temperature mapping of cryostat cold components: T gauges (in insulation vacuum) – RF coupler double-walled tube (several locations) – Tuner mechanical parts (normally badly thermalised, slow transients) – Thermal shielding temperature mapping – …I estimate about T gauges!  wires/routing/feed-through flanges We cannot avoid 2K bath instrumenation (P and level gauges)  leak-tight feedthrough needed

Lines X (st.steel) and Y (Ti): transitions DN 100 (for m=14g/s  v<2m/s, preserves He stratification, i.e. efficient counter-current flow ) titanium/st.steel transition DN 80 Y X

Brazed and bi-metallic samples Brazing samples, (S.Mathot, EN/MME) Tube samples from explosion bonding (PMI, Minsk/Bielorussia) Qualification tests: - Mechanical properties (tensile, shear) - Leak LN2 T: passed - Leak superfluid: Today’s breaking news from the Cryolab: 2 samples tested: mbar/l/s Helicoflex solution remains a proven back-up solution

Supporting system Mechanical/leak test mock-up in preparation at CERN to confirm “2-in-1” concept

Size of stiffeners increased for better results: 5th SPL Collaboration Meeting, 26/11/ Inter-cavity sliding support 20 / 36 Inter cavity support’s stiffness: 2 x E= 193 Gpa ν = 0.31 Frictionless: Sliding and rotation about longitudinal axis allowed Φ Fixed: no sliding, no rotation P.Coelho, CERN

Cavities inter-connections Cryostat – Cavity Support system  Based on : Coupler bi-tube supporting November 26 th th SPL meeting 21 P.Duthil, CNRS-IPN

 Preliminary concept 2 Assumptions : Tubes (  ext = 40mm) et supports en inox Plots sur enceinte He en titane 2 cavités  = 1 fixed at the bottom of their couplers Mass of the tuner is taken into account Assumptions : Stainless steel tubes (  ext = 40mm ; e=3mm) and support Titanium He tank Sliding without friction - No gap Cryostat – Cavity Support system – Cavities inter-connection Possibility of adding 2 chocks for the y and z alignment procedure November 26 th th SPL meeting 22 P.Duthil, CNRS-IPN

Inter-cavity support Concept needs to evolve to an engineering solution: – Thermal transients, differential thermal contractions – Sliding solutions: Engineering (sliding, rolling, hinged...) Materials Surface treatments cryo T under vacuum )

ESS cryomodule requirements Welcome to ESS in WG3 Too early to see specific requirements Input expected for the SPL Short Cryomodule Engineering Specification

Master Schedule Preliminary Design Review Detailed Design Review Start of assembly at CERN

Summary and outlook Most of cryo-module requirements are now settled Test-specific requirements (windows, instrumentation) well advanced Conceptual choices made (cavity supporting, cryogenic scheme,…) Still needing conceptual design work: magnetic shielding, thermal shield 2 Vacuum vessel concepts compared: – Tube-type, large diameter (radial space constraint from cavity/tuner)  preferred solution – U type ESSS, construction complexity (=cost) Assembly tooling concepts in progress (depend on vacuum vessel type) Supporting system (inter-cavity support): detailed design starts now by CNRS Mock-up for testing supporting solution in preparation at CERN Ti-st.steel transitions: options under study Engineering Specification of the Short Cryo-module in preparation (end 2010) Preliminary design review will take place in February/March 2011 Detailed design review September 2011 Procurement of cryostat components in 3 rd QTR 2011 Schedule very tight!

Thank you for your attention!

Spare slides

Actively cooled RF coupler tube Vacuum vessel Heater Helium gas cooling the double wall 4.5 K 300 K No cooling T profile  21W to 2K Cooling (42 mg/sec) T profile  0.1 W to 2K SPL coupler double walled tube, active cooling to limit static heat loads Connected at one end to cavity at 2K, other end at RT (vessel) Requires elec. Heater to keep T > dew point (when RF power off) (O.Capatina, Th.Renaglia) Massflow mgram/sec PowerONOFFONOFFONOFFONOFFONOFF Temp. gas out 286 K277 K283 K273 K271 K242 K255 K205 K232 K180 K Q thermal load to 2K 2.4 W0.1 W1.7 W0.1 W0.4 W0.1 W Q heater19 W32 W21 W34 W29 W38 W39 W41 W46 W44 W LL 0.1 mm ( )mm 0.05 mm ( ) ~ 0 mm ( )  Yields a certain degree of position uncertainty (<0.1 mm?)

Cavity/He vessel/tuner Includes specific features for cryo-module integration (inter-cavity supports, cryogenic feeds, magnetic shielding …) Cavity (Nb) He vessel (Ti) Tuner RF coupler port Magnetic shielding (cryoperm™) HOM port Pumping port Cool-down line port Not latest design!

Coupler position: top or bottom...?