Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.

Slides:



Advertisements
Similar presentations
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
Advertisements

Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Welcome to CERN Accelerating Science and Innovation 2 nd March 2015 – Bidders Conference – DO-29161/EN.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
UTC’s Central Energy Plant Humid air Out with heat Central Energy
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Applying Preventative Maintenance Practices
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Advantages of Heat Pumps Jacob Chandler. Why are they better than normal systems? Energy Efficient Environmentally Friendly Physical / Ascetics Economics.
INTRODUCTION. Function of Chillers Remove Cool Control Support.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Associated detection/extinction systems D. Swoboda.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
André Augustinus 9 October 2006 Interlocks update.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
Energy Cost Budget Highlights Jason Glazer, PE GARD Analytics Arlington Heights, Illinois Energy Cost.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
ABOVE GUIDELINE RENT INCREASE [AGI] What You Should Know.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Water as coolant Cooling system of a car engine
1 CERN IT Department CH-1211 Genève 23 Switzerland t Risk of network incident during the last LHC run CERN, 10 January 2013
New Rules on Legionella Prevention N. Bangert TS Workshop 2005, Archamps.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Control Systems: Circuitry Electricity for Refrigeration, Heating and Air Conditioning 7th Edition Chapter 16 Control Systems: Circuitry and Troubleshooting.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
EN-CV activities for LHC during LS2
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
CV maintenance works during YETS
Mauro Morandin & Antoine Daël
Module 3 Domestic Heating/MMA Welding
Section 1.0 — Fundamentals and General
Business opportunities related to CERN electrical network
ARIEL Phase I Operations
MAX IV Beamlines Maintenance
Experimental Areas – LS2 planning
Heating, Ventilation and Air Conditioning HVAC
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006

Complex PS Equipment Status in 2005 Status before the start Ventilation, air conditioning and heating system All running Normal Water cooling station Only 3 / 32 stations stopped 2 stations already started or tested Compressed air Never stopped Normal

SPS Equipment Status in 2005 Status before the start Ventilation, air conditioning, and heating system RunningNormal Water cooling station All of the stations stopped To be detailed Compressed air Never stopped Normal

Status for the SPS water cooling station. Maintenance have been done Maintenance have been done Tests should be carried out ASAP in order to find eventual problems Tests should be carried out ASAP in order to find eventual problems LEAKS are the main risks LEAKS are the main risks

Changes ? No big renovation have been carried out except : No big renovation have been carried out except : – variator on the Lear demineralized water pump – chilled water supply for the North area, running since one year Safety rules on the cooling tower and water treatment has become very strict. Safety rules on the cooling tower and water treatment has become very strict.  There is a new French legislation !!!  There will be a new IS !!!