ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Gain stability and the LYSO beam radiation monitor measurements
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
LED notched fibre distributing system Calibration system for SiPM
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
CALICE meeting 2007 – Prague
Testbeam Timing Issues.
LED notched fibre system at AHCAL Calibration system for SiPM
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group 1.QMB1 specifications 2.Test with HBU2 3.Analysis of light fibre distribution 4.Notched fibre, semiautomatic machine 5.Conclusions

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague2 QMB1 Quasi resonant Main Board –Modular system, 1 LED per board –Operation mode: DAQ + CANbus control stand-alone mode –LVDS Trigger distribution system –Variable amplitude, zero to maximum (~1Amp) smooth –Pulse width fixed to ~ 3.5ns (UV or blue LED) –Voltages and temperature monitoring –Size of PCB: width 30mm, depth 140mm More info of QMB can be found at previous presentations: Polak_I.CALICE_Heidelberg.pdf Single power 15V 65mA

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague3 Frame with 5 QMB1 boards (and 1 spare)

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague4 DESY test setup in February 2012 HBU2 DIF, PWR, CAL QMB1 T-calib from DAQ- DIF CANbus SPIROC2 PWR 15V combiner Notched fibres Single layer frame

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague5 Setup with HBU2 HBU2 (two SPIRoc2b ASICs) equipped with 3 rows of scintillators with SiPMs (delivered in Nov2011) 3 active QMB1s 3mm UV LED (395nm) 3x QMB1 Bad channels SiPM bias has not been set individually

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague6 detail of routed fibres We used TESA highly adhesive pads (for installation of banner to the wall) It is more stable than other temporary technique. We are developing stable fixing system. Fixing fibres to the right position is like Match of Ferda the ant with Bag the beetle…

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague7 Test at DESY HBU2 (two SPIRoc2b ASICs) equipped with 3 rows of scintillators & SiPMs (delivered in Nov2011) At DESY 2012 FEB Low Gain High Gain Linearity & Amplitude scan Single photon electron spectra Analysis mainly done by Jiří Kvasnička Fast Fourier Transform of p.e. spectra to get the peak distance Thanks to Mathias Reinecke with effort to set up HBU2

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague8 Amplitude scan LG 2 nd row (notched fibre) 12 channels Recalculated from SPIROC ADC bins to SiPM pixels and LED linearity measurement (see next slide)

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague9 QMB1 linearity, amplitude scan Standard LED pulses 3ns, PWR measured by optical power meter ThorLabs PM100D Differential Nonlinearity

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague10 HG - SPeS 3 rows of notched fibres squares indicates bad channels (SiPM, sci, or SpiRoc2b channel) 10 bad (unusable) channels of 36 ( = 28%) Nov2011 SiPM tiles are different to 2010 tiles, seems to get worse spectra HBU2 QMB1s Two best p.e. spectra of 2011SiPM batch

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague11 Reminder: nice spectra 2010 Spread of SiPM gain is about factor 3, it corresponds to data from ITEP. Single p.e. spectra QMB6 to SPIROC1 & SPIROC0 different SiPMs in the 2010 and 2011 batches

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague12 Result of FFT on best 2011 SiPM p.e. spectra FFT can see deep in Signal to Noise ratio Best spectra of 2011 SiPM

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague13 Result of FFT on bad 2011 SiPM p.e. spectra

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague14 Conclusions QMB1 is in full operational stage –It is working, no major troubles occurred –First 6 boards (version 1) we have in hand –fw is finished, QMB1 communicate via CANbus with PC –LabView exe file can control the board November2011 batch of SiPM has worse parameters in p.e.spectra over older batch Upgrade of QMB1(v2.0) is foreseen in mid of 2012 FFT is successfully applied on p.e. spectra to extract SiPM gain Notched fibre semiautomatic machine is hw ready, its sw is under development, in April new set of fibres to test at DESY

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague15 Back-up slides

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague16 2 nd row Correction to fibre data (Smolda)

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague17 HG - SPeS 3 rows of notched fibres ellipsoids indicates bad channels (SiPM, sci, or SpiRoc2b channel) 10 bad (unusable) channels of 36 ( = 28%) Nov2011 SiPM tiles are different to 2010 tiles, seems to get worse spectra HBU2 QMB1s We see decrease of response! Partially due to wrong orientation of fibre

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague18 Quick Friday’s QMB1 test with HBU2 Some config troubles occurred Generally, system is working easily, run in stand-alone mode Pulse position at different LEDs can be easy tuned within 1ns Near future plans (tomorrow) –Hold scan –Better notched fibre to install –Single p.e. peak spectra Next year plan (February) –More channels equipped with scintillators –Xtalk and light spread study System is working!, but Big spread due to combination of factors: Bad fibre, hold scan did not matched 2011 Distribution will be better, do not worry!

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague19 Principal schema Larger inductor than the older QMB6

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague20 PIN-PD response to QMB1 flash PIN-PD only, no preamp 5ns/div Upper: PIN-PD w preamp 10ns/div Lower: PIN-PD w preamp 50ns/div Maximal LED amplitude, LED airgap to PIN-PD

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague21 Mechanical layout of QMB1 Outer line: 30 (29) x 140 mm^2 4 mounting holes for M2.5 screw LED

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague22 Notched fibres external company Safibra preparing the setup (semiautomat) to produce precise notches in the fibres We assume to have fibres made by new technology in 1.Q 2012, we assume less spread of the light at taps (<15% ). prototype fibres showed some systematic error (decay) in distribution of light, two test methodes  two results: flat and with decay. Under investigation now. illuminated by Green laser 24 notches

ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague23 Notched fibres Semi-automatic tool Frame with x-y stepper motors Drill machine used as milling cutter to groove the notch Alu/PCB Template with moving scint tile PCB with 3mm holes Scintilator tile w SiPM Now in operational debugging & sw development stage