Moller Polarimeter Upgrading for PREx in 1)Mollar Analysis & Upgrading Works during/after 2009 PVDIS 2)Flash ADC based DAQ dead-time measurement.

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Robert Michaels HAMC Hall A Analysis Workshop 09 C HAMC = Hall A Monte Carlo ROOT / C++ Design Somewhat like SAMC & genercone For HRS only. Uses LeRose.
Elastic Electron Scattering off He and He (E04-018) Elena Khrosinkova Kent State University Hall A Collaboration Meeting Jefferson Lab, June
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
Updates on Using CAEN 1495 as MLU in Trigger Compton DAQ Performance at 440 kHz HV Status R. Michaels, Nov 19, 2013 p. 1 / 5.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Run 8 Polarization measurements from STAR BBC Andrew Gordon September 12, 2008.
1 X. Zheng, talk at PAVI11, Rome, Italy PVDIS at JLab 6 GeV Xiaochao Zheng (Univ. of Virginia) September 7, 2011 Electroweak Standard Model and PVDIS Physics.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
LIGO-G Z April 2006 APS meeting Igor Yakushin (LLO, Caltech) Search for Gravitational Wave Bursts in LIGO’s S5 run Igor Yakushin (LLO, Caltech)
PVDIS at JLab 6 GeV Robert Michaels Jefferson Lab On Behalf of the HAPPEX Collaboration Acknowledgement: Talk prepared by Kai Pan (MIT graduate student)
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
5 MeV Mott Polarimeter Progress Riad Suleiman April 10, 2012.
May 17, 2006Sebastian Baunack, PAVI06 The Parity Violation A4 Experiment at forward and backward angles Strange Form Factors The Mainz A4 Experiment Result.
PREX Mtg, July 2008R. Michaels, JLab Hall A Monte Carlo -- HAMC Similar to A. Deur’s ``Single Arm Monte Carlo’’ “Fast” Monte Carlo -- not Geant ROOT /
Jin Huang M.I.T. For Transversity Analysis Meeting Jun 18, JLab.
Azriel Goldschmidt AMANDA/IceCube Collaboration Meeting Laguna Beach, CA March 2003 String-18 Progress and Plans.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Accessing PBeast and monitoring the L1 trigger Emily Thompson.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Diana Parno – 18 April 2009 Compton Photon Detector Upgrade Diana Parno 18 April 2009 HAPPEX Collaboration Meeting.
SoLID review DAQ recommendations Alexandre Camsonne.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
Ba A B B1 FADC B2 SD_FP FLEX_I/O ROC VME64x A: [ HELICITY, HELICITY_FLIP ] (NIM or ECL) Port 1 Port 2 a: [ HELICITY, HELICITY_FLIP ] (LVDS) B: [ HELICITY_TRIGGER,
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
Mott Electron Polarization Results Riad Suleiman July 10, 2013.
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
 13 Readout Electronics A First Look 28-Jan-2004.
Hall A Moller Polarimeter DAQ Upgrade B. Sawatzky CNU 12 GeV Trigger Workshop July 8, 2010.
Chen-Ning Yang Tsung-Dao Lee Chien-Shiung Wu In 1972, PVDIS result from SLAC E122 was consistent with sin 2 q W =1/4, confirmed the Standard Model prediction;
"North American" Electronics
Counting Mode DAQ for Compton
Data Acquisition (DAQ) Status
A First Look J. Pilcher 12-Mar-2004
Online DAQ Code Tutorial
Mott DAQ Speed February 16, 2015.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
QWeak Collaboration Meeting
CLAS12 Timing Calibration
FFT analysis Goal : Energy calibration ( systematic error estimation)
Calorimeter calibrations with Flight Software.
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
BCM test in low current for g2p
Current status Minjung Kim
MDM October 2004 D MDM General Martin Kotulla, University Basel.
+/- Numbers Year 2-3 – Addition and subtraction of two-digit numbers
Presentation transcript:

Moller Polarimeter Upgrading for PREx in 1)Mollar Analysis & Upgrading Works during/after 2009 PVDIS 2)Flash ADC based DAQ dead-time measurement 3)Future Plan Moller Polarimeter Project in the Hall-A Collaboration Brad Sawatzky (now in Hall-C), Zafar Ahmed, Alexandr (Sasha) Glamazdin, Pomatsalyuk Roman, Robert Michaels, Eugene Chudakov (now in Hall-D)

PAW (Fortran)  ROOT (C++) Refer to Sasha & Brad’s talk given on Feb  Moller Target upgrading  Moller Super-Conducting Magnet upgrading  DAQ upgrading (Flash ADC based DAQ) 'DATA' Trigger 'HELICITY' Trigger

MPS Scaler of Helicity Trigger Types: MPS Scaler of Helicity Trigger Types: single L/R rate, BCM, 100 kHz clock H+H-

MPS Scaler of Helicity Trigger Types: MPS Scaler of Helicity Trigger Types: Moller Target Ladder Position Info.

Data Trigger Types: Data Trigger Types: Digitized Waveforms  Energy Deposited no pedestal subtraction

Data Trigger Types: Data Trigger Types: Energy Deposited coincidence Moller signal events

Cut Issue: Trigger Type rate/cycle rate/sec Raw Asymmetry Corrected Asymmetry Polarization Left arm / / / / Right arm / / / / Coincidence / / / / BCM / / / / Timer / / / /

Cut Issue: Trigger Type rate/cycle rate/sec Raw Asymmetry Corrected Asymmetry Polarization Left arm / / / / Right arm / / / / Coincidence / / / / BCM / / / / Timer / / / / / / / / Moller measurements: rates/sec and asymmetries run Left Right Coinc. Accid. BCM Clock Raw Asymmetry Polarization L-Asymmetry R-Asymmetry BCM

Cut Issue: Trigger Type rate/cycle rate/sec Raw Asymmetry Corrected Asymmetry Polarization Left arm / / / / Right arm / / / / Coincidence / / / / BCM / / / / Timer / / / / Moller measurements: rates/sec and asymmetries run Left Right Coinc. Accid. BCM Clock Raw Asymmetry Polarization L-Asymmetry R-Asymmetry BCM / / / /

Analysis Result Comparison no cut but BCM > 50  Zafar’s result  Run 321 (14048) /?kHz  Run 322 (14049) /109.5kHz  Run 323 (14050) /59.55kHz  Run 324 (14052) /218.9kHz  Run 325 (14052) /274.67kHz  My result  Run 321 (14048) /185.56kHz  Run 322 (14049) /109.65kHz  Run 323 (14050) /58.33kHz  Run 324 (14051) /218.88kHz  Run 325 (14052) /275.19kHz

Coincidence Counting Rate Flash ADC based DAQ v.s. old DAQ

Dead-Time Measurement

Asymmetry Measurement

Future Plan:  After adding scintillators, the code should be changed.  Next week, work with Sasha, Roman, and Ahmed to complete the on-line panguin Moller analyzer.