1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
PPAP Requirements Training
First Article Inspection Report
HACCP Manager Software™
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
Overview Lesson 10,11 - Software Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Quality Assurance/Quality Control Policy
ISO 9000 Certification ISO 9001 and ISO
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
First Article Inspection
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Introduction to Software Quality Assurance (SQA)
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
Dan Conlon Auditor Workshop “Output Matters” 14 July 2008.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
University of California - Berkeley
First Article Inspection
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
First Article Inspection
HART Technologies Process Overview
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
{ TCS QMS Document Pyramid Tier 0 – Why Tier 1 - What
Presentation transcript:

1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and Mission Assurance Jorg Fischer, PFP SMA Manager

2 MAVEN Documentation Training. Date September 12, 2011 Mission Assurance Problems / Situations / Issues

3 MAVEN Documentation Training. Date September 12, 2011 Mission Assurance Problems

4 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Check and update documentation continuously.

5 MAVEN Documentation Training. Date September 12, 2011 Data Recording Write Clear Procedures – Think and Plan ahead -Nice flow, from beginning to next assembly -Talk to operators and QA. Keep Traveler Book(s) updated and tidy. 1. Working with the procedure - Verify - Drawing/proc revision, sign-off, completeness, ref (PFR, ECN, etc), values 2. Working with the procedure - Record - Operator Name, Initial - Date, time humidity, temp All tools and materials used -PMI or asset number, cal due of all tools used -Oven ID, temp in, out, Solder Pot ID, cal due, Solder & Flux used Lot#. -Mix record numbers, attach mix record to document -Materials used, e.g., solder, tape, cable ties -All Items (parts & materials) removed or installed -EEE part number, Mfg, Lot/date code -Notify QA for inspection or data review, if appropriate -Take a picture of finished product, if possible UPDATE THE BOM, if rework or TBD items were installed 3. Working with the procedure – Notify QA -Notify QA for inspection or data review 4. Follow-Up – Keep your documents Books updated - Going back in time, CSI work is time consuming

6 MAVEN Documentation Training. Date September 12, 2011 Mission Assurance This Week: UARS is falling to the Earth

7 MAVEN Documentation Training. Date September 12, 2011 Mission Assurance UARS is falling to Earth – Documentation check

8 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Clarify each change “Was” (Ini & date) vs. “Is now.”

9 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Clarify each change “Was” (InI & date) vs. “Is now.” Example: Removed C11, CDR32BX103BKUS, MFG:KEM, DC0951, Installed CDR32BP101BFUS, MFG:KEM, DC0842.

10 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Clarify each change “N/A” (InI & date) & Comment.

11 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Clarify add-ins and changes

12 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Clarify especially, if the procedure is vague.

13 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Fill in all data

14 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Initial and date Any Changes

15 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Unperformed tests or changed values = show stopper

16 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Changed Values = Show Stopper If operator changes procedure, CogE signature is necessary (QA signature might be required). Examples are -Time in oven change, – why is it OK? -Oven temperature change, – why is it OK? -Test value vs recorded value – why is it OK? -Different part or material used – why is it OK? -> Use assembly report form or write what happened with approval into notes/comments section at the end of the procedure. Note 1. Step 24 in the proc called for a 48hr temperature 60C, CogE approved 24hr 80C, per mfg data sheet. (CogE ini &date). Remember: If this data is not on MFG data sheet QA approval is necessary.

17 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Changed Parts = Show Stopper Could this happen on your Project? “QA gave me the wrong parts - and I installed them!” Remember to inspect all parts BEFORE installation (ACI) If the operator needs to change parts or material, CogE approval AND QA approval are necessary. -Different part or material used – why is it OK? -> Again, use assembly report form or write what happened with approval into notes/comments section at the end of the procedure. Note 1. Wire specified in proc is not in stock. Notified CogE and QA. QA approved use of different wire (see attached , date. (CogE ini &date, QA ini,stamp &date)

18 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Initial Tests or write procedure differently

19 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Quick – What is Wrong with this picture?

20 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Do not fail “Pass /Fail” = Show Stopper

21 MAVEN Documentation Training. Date September 12, 2011 Data Responsibilities Tabs not Post-it notes for dividers – data covered in scan

22 MAVEN Documentation Training. Date September 12, 2011 Responsibilities Documentation Manage your documentation before this happens

23 MAVEN Documentation Training. Date September 12, 2011 Manage Your Documentation Traveler Cover: Q-005-FORM Assembly Traveler Cover Form

24 MAVEN Documentation Training. Date September 12, 2011 Manage Your Documentation Traveler RQMNTS:Q-003-SPEC Flight Travel Books Requirements SPEC

25 MAVEN Documentation Training. Date September 12, 2011 Responsibilities Manage your documentation Manage your parts and materials Manage your environment

26 MAVEN Documentation Training. Date September 12, 2011 Mission Assurance Implementation Plans  Mission Assurance Implementation Plans (MAIP) SSL, LASP, CESR have submitted a MAIP indicating how SSL will implement the MAVEN Mission Assurance Requirements –SSL: MAVEN_PF_QA_002 –LASP/LPW: MAVEN-RSS-PLAN-0038 –CESR/SWEA: SWEA-PL CESR-001-GEN –GSFC/MAG: MAVEN_PF_QA_002 –Result of many iterations between Project SMA & PFP –Includes a compliance verification matrix, deliverables list

27 MAVEN Documentation Training. Date September 12, 2011 SMA Requirements and Documentation 1.GENERAL 1.1.Basis and Scope of the Plan CESR 1.2.General Requirements 1.3.Use of Previously Designed, Fabricated, or Flown Hardware 1.4.Flow-Down of MA Requirements 1.5.Surveillance 1.6.SR&QA Verification 1.7.Status Reporting 1.8.Applicable Documents (Appendix A) 2.ASSURANCE REVIEW REQUIREMENTS 2.1.General Requirements 2.2.GSFC Flight Assurance Review Requirements 2.3.Flight Assurance Review Program 3.PERFORMANCE VERIFICATION REQUIREMENTS 3.1.General Requirements 3.2.Documentation Requirements Verification Matrix Verification Test Plan Verification Test Procedures Verification Test Report 3.3.Demonstration of Failure-Free Operation 3.4.Comprehensive Performance Test 4.SAFETY 4.1.General 4.2.System Description and Safety Assessment Report Preliminary Safety Assessment 4.3.Procedure Approval 4.4.Safety Noncompliance Requests 4.5.Safety Working Group Meetings 4.6.Safety Data Package, Launch Site Safety Plan, and Orbital Debris Assessment 4.7.Mishaps 4.8.Assessments 5.1.PARTS SELECTION EEE Parts Identification List 5.2.Other Parts Magnetic Devices Plastic Encapsulated Microcircuits (PEMs) Units and Subassemblies Field Programmable Devices PIND Testing Destructive Physical Analyses (DPA) 5.3.Ceramic Capacitors 5.4.Derating 5.5.Radiation Tolerance 5.6.Alerts 5.7.Parts Age Control 5.8.Parts Control Board 6.MATERIALS AND PROCESSES CONTROL REQUIREMENTS 6.1.Selection Requirements Compliant Materials Noncompliant Materials Conventional Applications Nonconventional Applications Inorganic and Metallic Materials Non-metallic Materials Fasteners Lubricants Consideration in Process Selection Shelf Life Controlled Items Magnetics Compatibility 6.2.Documentation 6.3.GIDEP Alerts 6.4.Materials and Process Control Board 7.DESIGN ASSURANCE AND RELIABILITY 7.1.Requirements 7.2.Implementation 7.3.Failure Modes and Effects Analysis 7.4.Limited Life Items 7.5.Trending 7.6.Parts Stress Analysis 7.7.Worst Case Analyses 8.QUALITY ASSURANCE REQUIREMENTS 8.1.Support of Design Reviews 8.2.Configuration Management 8.3.Identification and Traceability 8.4.Procurement Controls Purchased Raw Materials Age Control and Limited-Life Products Inspection and Test Records Purchase Order Review Re-submission of Non-conforming Materials 8.5.Receiving Inspection 8.6.Fabrication Control Manufacturing Certification Log Workmanship Process Control Reuse of Parts and Materials Retention of Test Samples and Removed Parts 8.7.ESD Control 8.8.Non-conformance Control Discrepancies Failures Alert Information 8.9.Inspections and Tests Inspection and Test Records Printed Wiring Boards Inspections and Tests 8.10.Metrology 8.11.Handling, Storage, Marking, Shipping Handling Shipping 8.12.Government Property Control 8.13.End Item Acceptance 8.14.Ground Support Equipment 9.CONTAMINATION CONTROL 9.1.Project Requirements 9.2.PFP Concerns 9.3.Control Plan 9.4.PFP Requirements on S/C I&T and Ops 10.SOFTWARE ASSURANCE General, Software Development, Documentation, Software Design Reviews, Configuration Management

28 MAVEN Documentation Training. Date September 12, 2011 Mission Assurance  Start on your documentation early Document the EM now Document the FM If not sure ask QA to clarify and help The Mission Assurance Team is here to support you for MAVEN PFP

29 MAVEN Documentation Training. Date September 12, 2011 Documentation Backup Slides Documentation training Backup Slides - MAVEN PFP

30 MAVEN Documentation Training. Date September 12, 2011 Non-conformance Control  Non-conformance Reporting Methods -Non-Conformance – Problem Failure Report (PFR, SCR) -Dispositions include: scrap, rework, return to supplier, refer to MRB - Processing of Repair or Rework -Material Review Board (MRB) -PFP MRB -Customer participation and approval required -Dispositions include scrap, rework, return to supplier, repair by standard or non-standard procedures, use-as-is, request for waiver

31 MAVEN Documentation Training. Date September 12, 2011 EEE parts and Materials Parts selection, de-rating, screening, and qualification test criteria are defined EEE Parts per GSFC-311-INST-002 add1, Level 2 –Parts derating, Parts age control, Parts control board –Radiation tolerance per MAIP section 5.5 –Alerts –Tests, Test Data & EIDP –Photos Materials and Processes Controls –Hazardous materials requirements –Vacuum outgassing requirements –Approved Materials & Processes lists –Limited Life items List –Alerts, Shelf Life Controls –Material Certs

32 MAVEN Documentation Training. Date September 12, 2011 Workmanship  Manufacturing, Assembly, and Quality Control of Electronic System will be in compliance to the most recent version of the following technical standards: NASA-STD Workmanship Standards for Staking and Conformal Coating of Printed Wiring Boards and Electronic Assemblies NASA-STD Workmanship Standard for Surface Mount Technology NASA-STD Soldered Electrical Connections NASA-STD Crimping, Interconnecting Cables, Harness, and Wiring ANSI/ESD Electrostatic Discharge Control

33 MAVEN Documentation Training. Date September 12, 2011 PFP Quality Organization Quality Assurance Build Configuration Verification Build Configuration Verification ESD Control PFP MAM Manager PFP MAM Manager Safety Configuration Management Configuration Management Documentation and Records Documentation and Records PMPCB, FRB, MRB Training and Certification Training and Certification Personnel Safety Personnel Safety Flight Hardware Safety Flight Hardware Safety Lab Inspections Contamination Control Contamination Control Support Flight H/W & S/W QA Testing Support Flight H/W & S/W QA Testing Quality Assurance Engineer Team Quality Assurance Engineer Team PFP Project Manager LASP SMA Manager CESR/IRAP SMA Manager CESR/IRAP SMA Manager GSFC SMA Manager GSFC SMA Manager Inspections, Audits Support lessons Learned SSL Safety & Quality Group Manager SSL Quality Committee