PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # 09.371.162 DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Capital Improvements Management Services Department
FY 2012 SIG 1003G LEAD PARTNER REQUEST FOR SEALED PROPOSAL (RFSP) BIDDERS’ CONFERENCE February 7, 2011.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
CSN Project # RFQ 180 and RFQ 181 Fire Station/College Instructional Center Scope of Work 14,000 SF structure on West Charleston Campus to house.
CSN Project # EHSB Addition - Scope of Work 10,000 SF addition to K Building on West Charleston Campus to house the Cardiorespiratory Program.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Jeff Nelson Chief A/E Contracting Section 1 August 2013 A/E Contracting, Albuquerque.
Human Resource The Recruitment Agency. ABOUT US HRRA (Human Resource Recruitment Agency) is an independent company specializing in staff recruitment since.
Doing Business with the Pennsylvania State System of Higher Education (PASSHE) Supplier Overview.
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
ASHRAE Certification Programs  Created to fill an identified industry need through market research  Based on best practices  Developed by ASHRAE-identified.
PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING September 2 nd, 2015.
PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # CONSTRUCTION MANAGER AT RISK (CMAR) SELECTION PRE-SUBMITTAL MEETING September.
Leadership Certificate Program Fall 2009 Center for Leadership & Involvement.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
RFP Oligonucleotides Pre-Submittal Conference 1 October 13, 2015.
2016 DOE EPSCoR State Implementation Grants Program January 7, 2016 Contact : Richard Cristina.
2016 Technical Assistance Funding Workshop 1/14/16.
Office of the Vice Chancellor for Student Affairs (OVCSA) Barbara Henley, Ph.D. Vice Chancellor.
RFP Population Health Management System (PHMS) Enhancements Pre-Submittal Conference Purchasing.
Business and Finance Strategic Planning Agenda Introduction Overview: B&F Strategic Plan Discussion: B&F as one B&F Values with Behaviors.
Construction Management At Risk Process
1 EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse Public Outreach Framework Jolene Walsh Senior Director, Public and Governmental.
Higher Learning Commission (HLC) Re-affirmation of accreditation in
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
GOVERNOR’S OFFICE OF CRIME CONTROL & PREVENTION REQUEST FOR PROPOSALS (RFP) SOLICITATION NO. DEXR Maryland – Statewide Victims Services Needs Assessment.
The University of Texas Medical Branch Business Operations and Facilities Consulting ServicesPre-Proposal Meeting Terrie Beasley, CTP UTMB Health, Purchasing.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
Presented by: Wendy Landwehr Alison Bergmann Maureen Masiulis
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Procurement & Strategic Sourcing
Planning, design & construction RECITAL HALL Project #
Planning, design & construction TINSLEY HALL RENOVATION Project # 09
Procurement & Strategic Sourcing Charter Bus Transportation Services
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Procurement & Strategic Sourcing
American Institute of Constructors
Consultant Selection Training
Request for Proposal and Specifications for
Request for Proposal and Specifications for
Drainage Improvements at VW Yard (RFQ-101)
UNC Charlotte INTERCOLLEGIATE SWIM TEAM PROJECT
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
PROJECT DELIVERY METHODS
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
Procurement & Strategic Sourcing Scott Hall Vivarium Updates 2019
OCPS CCNA SELECTION COMMITTEE TRAINING
MCCONNELL SIDEWALK & MULTIMODAL IMPROVEMENTS
Multi-discipline academic research science technology engineering & math (stem) building project phase 1 NAU Project No RFQ for Construction.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Pre-Submittal Meeting As Needed Environmental Services RFQ
Procurement & Strategic Sourcing
DESIGN Professionals forum
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016

AGENDA 2 NAU Mission & Goals: 2016 and beyond… Recital Hall: Project’s Mission & Goals Site Map Pre-Construction Phase Construction Phase Schedule Qualification submittal format Questions??

NAU MISSION & GOALS: 2016 AND BEYOND… 3 Mission: To provide an outstanding undergraduate residential education strengthened by research, graduate and professional programs, and sophisticated methods of distance delivery. Values: Excellence in Education: Offer a rigorous, high-quality education to all students. Student Success: Place learner needs at the center of our academic and service planning, policies, and programs. Educational Access: Provide all qualified students with access to higher education. Diversity: Achieve multicultural understanding as a priority of educational and civic life. Integrity: Operate with fairness, honesty, and the highest ethical standards to sustain a community of trust. Civility: Support a civil, engaging, and respectful campus climate.

NAU MISSION & GOALS: 2016 AND BEYOND… 4 Strategic Goals: Student success Nationally recognized research excellence Global engagement Diversity, civic engagement, and community building Commitment to Native Americans Sustainability and effectiveness Design a sustainable and effective building that will streamline kitchen and food service efficiency to the benefit of the students and dining staff.

RECITAL HALL PROJECT’S MISSION & GOALS 5 Recital Hall Mission: The Mission will be developed with the successful Design Team, NAU stakeholders, and NAU PDC Rep’. The focus of this project from Day 1 will be “Teamwork”.

RECITAL HALL MISSION & GOALS 6 Recital Hall Goals: Conduct a programming effort to determine size and finalize scope, Develop a strong conceptual design to solicit fundraisers, Student focus

SITE MAP 7

8

9

FLOOR PLANS 10

FLOOR PLANS 11

FLOOR PLANS 12

SITE MAP 13 Site considerations: Addition to existing buildings – 37 & 37A Consideration for occupied buildings

PRE-CONSTRUCTION PHASE 14 Review the current DP NAU contract prior to submittal as terms & conditions of the contract won’t be negotiable. Review Pre-construction and Construction requirements in the RFQ and in DP/CMAR contracts. Acknowledgement of Design Guidelines & NAU Technical Standards (signature page to be turned in). Programming and conceptual design for fundraising effort This project may end after conceptual design if fundraising is not obtained.

CONSTRUCTION PHASE 15 Construction is tentative for this project. In anticipation of project moving to construction phase: Review Pre-construction and Construction requirements in the RFQ and in DP/CMAR contracts. Events will be happening in Ardrey during construction period – schedule TBD. Construction phasing options. Students traffic around the project. Safety. Working hours.

SCHEDULE & CONSTRUCTION COSTS 16 SCHEDULE: Hold for DP interviews – 2/12/2016 DP selected by 2/13/2016 Programming/Conceptual Design by 6/1/2016 CONSTRUCTION COSTS: Construction Cost:$7,000,000 to $14,000,000 depending on # of Practice rooms and # of seats

SUSTAINABILITY & TOTAL COST OF OWNERSHIP 17 This facility is expected to be LEED Gold Certified. DP Team (including proposed Sub-Consultants such as MEP Engineers) shall have strong knowledge and experience with sustainability initiatives relative to this type of building and with renovation and construction. Pre-construction team must have a strong understanding/experience with energy-efficient HVAC systems. Total Cost of Ownership shall be calculated to demonstrate that building materials and building systems will be selected based on most sustainable criteria.

OTHER CONSULTANTS UNDER OWNER 18 Geo-Tech investigation: as needed Survey: as needed 3 rd party Estimating Firm: to provide independent estimating and validation of DP’s and CMAR’s estimates at Schematic and GMP phases. Commissioning: Commissioning Agent will be hired by NAU once further design is engaged.

QUALIFICATION SUBMITTAL FORMAT 19 Proposal due date: January 25, 2016 by 2:00 pm 1 Original and 7 Copies + 1 Electronic Version Page Count (Page 12 of RFQ): o Items A – G cannot exceed 25 pages o The introduction is included in this page count. o Tabs do not count as pages unless there is content on them o Resumes cannot exceed 2 pages each o Submittal Certification is 1 page – you must fill out any exceptions to the contract on this page.

DISQUALIFICATION ITEMS 20 Refer to RFQ for specifics o Turning in submittal late – if mailing, be mindful of slow delivery times – Beware of inclement weather…it is due in January o Contacting any NAU employee regarding this project other than as outlined in the RFQ (Stephanie Bauer) o Not providing the correct number of submittals or exceeding the page limit o Submitting in the wrong location o Company profiles in Resumes. Resumes should be about the individual, not the firm and are intended to aid the selection committee with info regarding the firm.

21 QUESTIONS?