IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
IBL Loading Activity Overview Franck, Maarten, Coralie, Didier Loading tool workshop University of Geneva, Aug 31 st 2011.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Type 0 flex assembly to the stave 2011/06/08 François-Xavier NUIRY CERN PH/DT/PO 1.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Prototype sector Ian Wilmut Dec What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
From Research Prototype to Production
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Y. Ikegami, T. Kohriki, S. Terada Y. Unno (KEK), K. Hara (Univ. of Tsukuba) G. Barbier, F. Cadoux, A. Clark, D. Ferrere, S. Gonzalez-Sevilla, D. La Marra,
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
July 17, 2013 CERN T. Flick University of Wuppertal.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Dec
Readout of Temperature Monitor with SEABAS ’11 10/12 Y. Takubo (KEK) 1.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Loading and QA activities Introduction, Workflow, Tooling, Tasks UniBe – UniGe regular IBL-Upgrade meeting D. Ferrère Aug, 11 th 2011.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
DBM DAQ Status Ales IBL DAQ Workshop Held previous week and first part of this week
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
IBBelle: Status & Plans
IBL project for DT Science-Techno Tea
What is Stave Carrier Frame Required to Do?
Cryomodule test stand at ESS site
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
DAQ for ATLAS SCT macro-assembly
Mechanics: (Tim).
Update on ATLAS insertable B-layer
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo Currently opened LD position: research engineer to work on IBL QA and commissioning Participation to IBL MB: F. Cadoux (WG3 – Integration-Installation), S. Débieux (WG4 – Off-detector) Work involvement in: - Integration, beam pipe installation, IST - Stave to beam pipe integration - Loading and QA - Commissioning UniBE – UniGe IBL-Upgrade kickoff meeting

Near Future Events IBL general meeting 8-10 June 2011 at CERN Involvements: -WG2: Stave – O. Rohne, E. Vigeolas UniGe: Talk about loading activity -WG3: Integration & Installation - R. Vuillermet, F. Cadoux UniGe: Talks about integration, IST, … - WG4: Off-detector - T. Flick, S. Débieux UniBe: Talk about RX plugin LHCC Upgrade Session 14 June Talk proposed by G. Darbo to D. Ferrère about IBL Technical Progresse s Vertex June 2011 Austria Talk from F. Cadoux about “Novel material for tracker experiments” Others?

Module assembly site(s)Stave & flex circuit assembly site(s) QA done Stave loading site Reception tests Visual inspection, electrical testsVisual inspection, leak tests, metrology of references Loading Metrology Wire bonding Electrical tests - cold Thermal cycling Electrical tests - cold Rework? Storage Rework?    Wing gluing Rework?  QA done Electrical test? Pull test? Shipment Transport What type? Connectivity tests at PP0? Is it required? Loading Activity – Flow Diagram (Not frozen yet) High chance to be at UniGe USBPix Seabas DAQ system Mitutoyo  Trained personal Need a new climate chamber

Loading Activity and QA before Integration Questions today to IBL community: -What DAQ shall we use for Stave Electrical Characterization? Adaptation of USBPIX, a DAQ close to ROD-BOC, or another readout system?  None identified so far working on this and USBPIX experts are improving the software/firmware DAQ for individual FE module readout.  Y. Takubo is a DAQ firmware and software expert with Seabas FPGA board (KEK) - Is it enough to do electrical tests and QA by warm cooling with water and later test at CERN SR1 with CO2 plant before integration to beam pipe? What to do for us: Work preparation for possible loading at UniGe: - Loading tools to be qualified. Done on short staves but work is progressing toward full length - CFRP handling jigs (1 per stave) to be designed and fabricated and will follow the life of the stave from loading to the integration - Tools for wire bonding and pull test in addition to the qualification work - Metrology tools and program to be made under the Mitutoyo dual probe (touch/vision) - Test system to be setup with temporary PPs attached to PP0  a lot of work is expected there but depends of the DAQ choice

Loading Activity – 3D Models Loading activity currently under investigation: - Short stave prototypes - Done - Full length stave – under progress Need to investigate: -Handling frame - Loading and wing attachment jigs - Bonding jigs - Wire pull test jigs - Metrology jigs and program - Test box and PPs for the electrical QA

From Integration to Commissioning Tests 1.Clean the cooling pipe by doing a liquid/gaz flow 2.Make a stave reception test with CO2 cooling with DAQ system in SR1 3.Remove the temporary PP for each of the staves at the 2 ends 4.Extend the cooling pipe by Brazing technique (baseline) 5.Mount every stave on the beam pipe with proper integration tools (also done by UniGe) 6.Make the electrical connection to type 1 services at PP0 7.Move the all IBL into a cold test box 8.Make the electrical connection at PP1 with temporary PP 9.Connect all the cooling fittings and check for leaks 10.Power and monitor the temperature, supply and current on the modules 11.Run the final DAQ system by doing basic calibration tests 12.If time allows it make a physics run with cosmic rays NB: DCS and DAQ systems should be the final version to be used for ATLAS operation All of this is a lot of work in various field to commission the all IBL and therefore would require a non negligible work anticipation for this