FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

PC To GT Program Load Shachar Rosenberg Alex Normatov Technion - Digital Lab.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Status of the PCI Test Stand Hardware status: Three known working PTS’s: 2 at FNAL, 1 at UIUC. Korean group working on one, LBL has one running yet? Adapter.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
3rd April 2001A.Polini and C.Youngman1 GTT status Items reviewed: –Results of GTT tests with 3 MVD-ADC crates. Aims Hardware and software setup used Credit.
Muon commissioning status and plans G.P. C. De Plano.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Development of UW Pixel DAQ System Final Report : Winter 2015 Jimin Kim University of Washington Department of Mathematics/Physics March 20 th 2015.
Status of NA62 straw electronics Webs Covers Services Readout.
NA62 straw tracker readout status Georgios Konstantinou
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
SRB data transmission Vito Palladino CERN 2 June 2014.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
3 Sep 2009SLM1 of 12 SLM performance and limitations based on HW tests.
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
SL-PGA firmware overview M. Sozzi Pisa - January 30/31, 2014.
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
TLU plans 21/03/20161 D. Esperante, Velo upgrade meeting.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
zeroes-errors-game-not-starting-crashes.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
Straw readout status Run 2016 Cover FW SRB FW.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
ATLAS Pre-Production ROD Status SCT Version
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Vito Palladino Straw Working Group 23/3/2015
Commissioning the SIS3316 Digitizer
COVER Full production should arrive today
HCAL DAQ (hardware) Debugging Status
Run experience Cover FW SRB FW DAQ and monitoring
Status of GbE Peripheral Crate Controller
Presentation transcript:

FW and HW Status TDAQ WG 10/6/2015

Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber 4 close to RICH  We have seen more problems on this chamber (no systematic studies has been performed)  Possible extra noise?  Cover links  Could influence stability  Famous glitches (1 or 2 per day)? 2

Hardware SRB: ◦ All SRBs has been patched in order to be able to use the NIM in/out features (April) ◦ SRBs tested in 154 (May):  Specific test bench has been installed, 16 covers and MPOD (mini) ◦ Boards re-installed and cabled in ECN3 3

Firmware (Cover) Version 15 ◦ Used during the Pilot Run Version 16 (new) ◦ Improve link usage  Remove 1 clock cycle gap between data ◦ Improve data multiplexing  Use round-robin instead of circular full scan ◦ “password on everything” not done  Link problem probably due to MPOD HV not floating  Wait for tests ◦ Not yet compiled ◦ Supposed to start the test last week (illness) 4

Firmware (SRB) Work was not only the trigger matching. The FW is now more stable: fixing bugs and weak points consolidation were part of the “restyling”. Common to all FPGAs: ◦ 2.5Gb/s links:  ALTERA IP core bug in internal parameter settings causing link instability  We have seen links failing in 2014 run  Error in startup conditions causing bytes swapping during configuration  One of the most frequent problems 5

Firmware (SRB) Fe_intf version 7 : ◦ Only common problem above Trig_mgr version 4 : ◦ Fixed wrong clock for TTCrx interface configuration  Could be the source of T0 delay problem, need to test ◦ Added L0ID and trigger_type generation  Fast link is used to transfer to event_mgr and vme_bm Event_mgr version 3 : ◦ Fix data writing from fe_intf - only when links are aligned  Could have caused data corruption at the start of the burst ◦ Added L0ID and trigger_type reception ◦ Time-reordering and trigger-matching  Interface to Ethernet missing  Buffer selection missing Supposed to start the test last week (illness) 6

Firmware Ethernet interface Event Storage Event Event Storage Event Event Storage Event Event Storage Event ETH 0 ETH 1 TRG_fifo DATA_fifo CNT_fifo TRIGGER MATCHING Max 16 events per packet 7

Firmware (Ethernet Interface) Event Storage Event Event Storage Event Event Storage Event Event Storage Event ETH 0 ETH 1 TRG_fifo DATA_fifo CNT_fifo TRIGGER MATCHING 8

Current Limitations 1 packet per PC Max 16 events per packet 1 Ethernet port supported NO fragmentation NO tuning of trigger time window offset 9

Conclusions and Plans Hardware: ◦ Ready for the upcoming RUN ◦ MPOD trip problem is not yet understood (1 or 2 trips per day is still acceptable?) Firmware: ◦ SRB is almost ready to be tested (needs finalization) ◦ COVER version 16 should be tested this week Next step(s): ◦ Test in the lab to assure that the firmware is behaving as expected ◦ Move to ECN3 in order to take part to the NA62 DAQ and RUN control ◦ Debugging (of course…) ◦ 0 biassed VME data transmission 10