1 What I’ve been doing for many of the days you haven’t seen me here Bill Ashmanskas Nov 25, 2003.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
AP2 line BPM system Bill Ashmanskas, Sten Hansen, Terry Kiper, Dave Peterson,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
“AC” Dispersion Measurement David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
GBT Interface Card for a Linux Computer Carson Teale 1.
Feedback for CESR TA Michael Billing May 17, 2007.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Debuncher “phase jump” project Decouple Debuncher RF frequency from MI 120 GeV frequency – MHz could move by ~1-2 kHz –Can center beam in Debuncher.
Proposal for Low frequency damping system in Tevatron Why do we need it? Maybe not? Can our current correctors handle the job? How should the system look?
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
F Fermilab July 6, 2005Recycler Damper Stability1 Recycler Damper High Frequency Stability Jim Crisp
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
12-June-03Concept for Booster LLRF - G. W. Foster A Concept for Using the Digital Damper Board to Upgrade the Booster LLRF Bill Foster June 12, 2003.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
17-Mar-03MI/RR Dampers - G. W. Foster Longitudinal Dampers for Main Injector Bill Foster, Dennis Nicklaus, Warren Schappert, Dave Wildman Mar ‘03.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
14-Oct-02MI/RR Dampers - G. W. Foster Beam Dampers for Main Injector and Recycler Bill Ashmanskas, Bill Foster, Dave Wildman Warren Schappert, Jim Crisp,
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Beam-beam effect with an external noise in LHC
AFE II Status First board under test!!.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LLRF Controls Outline Requirements External Interfaces Schedule Design
Accelerator Physics Technical System Group Review
M. Mehler1), H. Klingbeil1), B. Zipfel2)
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Limits on damping times
Tracker Software Status
CesrTA Experimental Schedule and Priorities
ICFA Mini-Workshop, IHEP, 2017
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

1 What I’ve been doing for many of the days you haven’t seen me here Bill Ashmanskas Nov 25, 2003

2 First things first … a shameless plug PR D physics/ But since August, when this stuff was finished, I’ve joined Bill Foster’s ongoing damper board effort for Run II

3 Bill Foster’s damper board team includes Bill Foster Dave Wildman Dennis Nicklaus Alexei Seminov Warren Shappert Sten Hansen Terry Kiper Bill Ashmanskas Eric James FNAL/BD PPD engineering ANL/CDF FNAL/CDF

4 Outline What is a “damper” anyway? What does this damper look like? How have I been able to help out so far?

5 What does a damper do?  Detect coherent bunch oscillation w.r.t. stable orbit and apply a kick to correct it  Correct for injection errors (x,x’,y,y’, ,E) before beam filaments (emittance growth)  Counteract instabilities before they grow out of control  Do this for horizontal, vertical, and longitudinal coordinates

6 Transverse motion w.r.t. stable orbit (cartoon)

7 Many particles, with their own small excursions

8 Steering error  bunch centroid oscillates

9 If coherent motion isn’t corrected, nonlinearities cause beam to decohere, fill larger phase space

10 Transverse damper at work (GWF, Lehman review)

11 Transverse damper at work (GWF, Lehman review)

12 Transverse damper at work (GWF, Lehman review)

13 Transverse damper at work (GWF, Lehman review)

14 Transverse damper at work (GWF, Lehman review)

15  You can see that damper project has merit  The longitudinal damping is now under test, and should yield results that are more impressive  Results I showed are from before I joined (except that I helped with the late-2002 prototyping)  Key point: This is work to which CDF electronics types can readily contribute (familiar hardware)  I’ve been helping Bill F to commission the second-generation damper boards, which arrived in July 2003

16 Bill Foster’s damper concept (or VME, VXI, PCI, etc.)

17 What the FPGA computes

18 Relevance of CDF experience: this isn’t so scary... once you’re used to working with this

19 Prototype damper (kludged commercial board)

20 New board being commissioned

21 In-house damper board, by A. Seminov  One Altera Stratix 1S30 (vs 5 separate older Altera chips on commercial board)   much more straightforward to program  212 MHz ADCs (vs interleaved 106 MHz pairs)  424 MHz DACs (vs 212 MHz on daughter card)  On-board CPU+ethernet for configuration and ACNET interface (vs VME + JTAG cable)

22 So far, I’ve been mainly working on the configuration & readout path for the new board (because Alexei is stuck in Russia!). Good progress: e.g. can configure stand-alone board via TCP/IP, have established communication with Dennis Nicklaus’s ACNET interface. Meanwhile, Eric (the other CDF guy) and Warren are showing that this board could work for Tevatron BPM readout.

23 Same board can do BPM readout!

24 Summary  Once I got my CDF papers out, I decided that the most useful thing I could do was to try to help Bill F with his damper board  People with HEP trigger/DAQ experience should not have much trouble finding a way to contribute  The same programmable-chip technology that has had a big impact on the CDF trigger can be readily applied to all sorts of beam measurement/feedback/control