Emergency Calling System Status Report #7 Group #9 Cem Sahin Jassim Alemadi Eloy Esquivel Vikas Tailor Objective To build an automated emergency call system.

Slides:



Advertisements
Similar presentations
OfficeTrack Fleet Management Solution. OfficeTrack OfficeTrack Fleet Management Solution allows business and companies to view the location of their fleet.
Advertisements

TEAM #1 RYAN AGUDELO WILLIAM DAVIS DAVID KENNICK Microcontrolled Multi-Video Gaming Console Status Report #7 March 23, 2011 Objective: To create a gaming.
Drunk Dial Brent Foster Steven Hollar James Pendleton Anish Verma Chris Wagner.
Status Report #4 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
Critical Design Review VST Vigilant Sensing Technologies Joel Keesecker, Mark Kien, Pat Hauser.
LUMEN ALARM & LIGHTING SYSTEM Artem Aginskiy, Grayson Carr, Yinuo James Chen, Andrew McDowell.
Proposals for homologation of AECD and Installation in vehicle DRAFT status
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
Get the most out of SKYPE 1.Sign in 2.Pick up your webcam 3.Try Skype activities 4.Eat Trainers are around should you need help – or Skype us Jimskeane.
Status Report #3 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/6/2012 Design of an electronic system to track.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
STATUS REPORT # 3 RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #3 February 6 th, 2012 Objective: To create an automated.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Status Report #07 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Mohammad Saadeh Class: ET 493 – 01 Class Professor: Dr. Cris Koutsougeras.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
Conversion Presentation. Overview T. Rowe Price Conversion Team Flowserve Team Flowserve Participant May 2010 June 2010July 2010August 2010September 2010October.
{ Lost Object Locator Status Report #1, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
{ Lost Object Locator Status Report #2, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
Status Report #7 Wireless GPS-Navigated Autonomous Vehicle April 9th, 2007 Purpose: To implement a fastest route algorithm in a GPS enabled vehicle. Prepared.
April 14, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #8 Hector Silva Gustavo Diaz Ernest Tolliver Matt Ford.
Status Report #08 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
Personal Fall Detection Device Jonathan Annua, Mason Edwards, Matthew Jue, Terry Sharp, Joshua Whittle Georgia Institute of Technology School of Electrical.
{ Lost Object Locator Status Report #6, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application. Team.
Darren Jordan Adam Huck Daniel Ortiz September 22 nd, 2010 Our design is to install an automated fire suppression system in a vehicle and in the act of.
Status Report #4 Academic Presentation Timer Danny Cardenas Ignacio Carranza Edward Minter Joshua Roos February 18, 2008 Timing for public speaking excellence.
THE AUTO-REMIND USB FLASH DRIVE April 7, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #7 Hector Silva Gustavo.
 Sends and receives radio signals › Making a call: Your voice is transmitted into a radio wave, sent out through your antenna and sent to a base antenna.
Status Report # 3 Commhut – Home Security Wire Protection System Team 7 Ronald, Orlando, Robert, Jaime An interfacing module to communicate with previously.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
Mid-Semester Presentation Senior Design I February 24, 2011.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #4 February 13 th, 2012 Objective: To create an automated.
2N Net Audio system.
Emergency Calling System Status Report Group #9 Cem Sahin Jassim Alemadi Eloy Esquivel Vikas Tailor Presented to: August Allo Feb 5,2007.
LBS Division INDOOR POSITIONING SYSTEM Indoors Independent infrastructure that communicates via wireless connection standards: RFID Technology: Continuous.
 OVERALL NEED: To protect the communication lines of home security systems by detecting intrusion.  DESIGN MILESTONES: ◦ Develop Detailed Schematics.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #5 March 3, 2010.
GraphicMail Marketing Web Software Small Guide 1.
Status Report #2 Walking Charger By: Carlos Benitez, Meryem Fennich, Srinath Kota, Jacksario Rosario September 15 st 2010 Description: Battery charger.
Emergency Response System for Android Phones By: Sudhanshu Mishra.
GPS & GSM BASED CAR SECURITY SYSTEM. Student’s Name with USN No.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
CS-EE 481 Spring January 2006 University of Portland School of Engineering Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin.
Status Report #3 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
Status Report #4 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/13/2012 Design an electronic system to track the.
{ Lost Object Locator Status Report #3, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
Status Report 6 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 10/13/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Status Report #6 March 19 th, 2012 Objective: To create an automated system that will monitor and enforce personal.
Emergency Calling System Status Report #8 Group #9 Cem Sahin Jassim Alemadi Eloy Esquivel Vikas Tailor Objective To build an automated emergency call system.
Emergency Calling System Status Report #4 Group #9 ► Cem Sahin ► Jassim Alemadi ► Eloy Esquivel ► Vikas Tailor Objective To build an automated emergency.
Status Report #1 Self sustaining living system using methane Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 1/23/2011 Design of an electronic.
Contact Us Phone: Website:
The Auto-Remind USB Flash Drive
Scrum meeting.
What to Look for In an Executive Car Service. 2 3.
Warm Up, May 2nd Of the documents listed below, write down the titles of all the ones you still need for your portfolio: Reflection and Self-Assessment.
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Warm Up, April 27th First: Get your folder, get any documents you’ve completed, and file them. Of the documents listed below, identify the titles of all.
Devon Johnson Fabio gomez Joelle Lawson
LAMAS Working Group December 2013
4 Years Milestone plan – (Company Name)
Team Bull Trout Project: Elevator Navigating Robot
Presentation transcript:

Emergency Calling System Status Report #7 Group #9 Cem Sahin Jassim Alemadi Eloy Esquivel Vikas Tailor Objective To build an automated emergency call system that will send SMS after the cars airbag deploys. Presented to: August Allo April 9, 2007

Project Milestones Finish configuring Falcom GSM Module Complete April 9, 2007 Done

Tasks Completed ► Configure the speaker and microphone Complete ► Accept incoming calls Complete ► Send SMS to Phone Complete ► Website( ) Complete April Done

Ongoing/Pending Tasks ► April 12 nd  Send a more accurate GPS reading ► April 16 rd  Finish final draft for final report. ► April 18 th  Demonstration of Working Prototype to Dr. Allo April 9, 2007 Done

Upcoming Tasks ► Test and evaluate the GSM module. ► Add backup battery. ► Get product ready for final demonstration. April 9, 2007 Almost Done

Emergency Contact GSM Module Airbag Sensor 12 V DC Power Supply Impact Digital Analog 100% April 9, 2007 Almost Done

Schedule