Conceptual Design for HYLIFE-II Maintenance Ryan P. Abbott ARIES Project Meeting May 6, 2003 This work was performed under the auspices of the U.S. Department.

Slides:



Advertisements
Similar presentations
Introduction to CAD/CAM/CAE
Advertisements

1 Slides presented by Hank Childs at the VACET/SDM workshop at the SDM Center All-Hands Meeting. November 26, 2007 Snoqualmie, Wa Work performed under.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Overview of radioactivity vs. chemical toxicity issues for Overview of radioactivity vs. chemical toxicity issues for potential target materials presented.
Liquid Wall Thickness, Life, Pumping Power, COE trade-offs Wayne R. Meier and Ryan P. Abbott LLNL ARIES Meeting Oct. 2-5, 2002 PPPL.
Wayne R. Meier Lawrence Livermore National Lab Heavy Ion Fusion Modeling Update - Spot Size Model Changes* ARIES Meeting April 22-23, 2002 * This work.
Wayne R. Meier Lawrence Livermore National Lab Heavy Ion Fusion Modeling Update* ARIES e-Meeting October 17, 2001 * This work was performed under the auspices.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
The Heavy Ion Fusion Virtual National Laboratory UC Berkeley Christophe S. Debonnel 1,2 (1) Thermal Hydraulics Laboratory Department of Nuclear Engineering.
An Update Point Design for Heavy Ion Fusion Wayne Meier LLNL ARIES Meeting Jan. 8-9, 2003 UC San Diego Work performed under the auspices of the U.S. Department.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES Meeting April 22-23, 2002 U. Wisconsin, Madison Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
ARIES-IFE Study Page 1 Nozzle Motion/Phasing Over Reactor Lifetime (AI#4) L. Waganer and W. Meier 6 May 2003 ARIES Meeting at Livermore.
Safety assessment for Safety assessment for potential target materials: radioactivity vs. chemical toxicity presented by: Susana Reyes ARIES Group Meeting.
CAD/CAM Design Process and the role of CAD. Design Process Engineering and manufacturing together form largest single economic activity of western civilization.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Idaho National Engineering and Environmental Laboratory Update on IFE Aerosol Analysis J.P. Sharpe INEEL Fusion Safety Program.
Shielding of the Final Focusing System in the HIF Point Design* by Jeff Latkowski and Wayne Meier ARIES Projct Meeting January 8-9, 2003 *Work performed.
1 ARIES IFE - Some Concluding Comments on Thick Liquid Walls Wayne Meier, Ryan Abbott, Jeff Latkowski, Ralph Moir, Susana Reyes ARIES Project Meeting September.
Wayne R. Meier Lawrence Livermore National Lab Per Peterson UC Berkeley Updated Heavy Ion Driver Parameters for Snowmass Point Design ARIES Meeting July.
Wayne R. Meier Lawrence Livermore National Lab Heavy Ion Driver Model Update* ARIES IFE Meeting LLNL March 8-9, 2001 * This work was performed under the.
Summary of FS Lifetime Assessment and Activation Analysis L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison ARIES E-Meeting October.
AT-LINE A Practical Application of Smart Modular Sampling Components IFPAC 2001 ABB.
The Heavy Ion Fusion Virtual National Laboratory UC Berkeley Christophe S. Debonnel 1,2 (1) Thermal Hydraulics Laboratory Department of Nuclear Engineering.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Final Focus Magnet Shielding Update Jeff Latkowski and Wayne Meier ARIES Meeting October 2-4, 2002 Work performed under the auspices of the U. S. Department.
Overview of 3D Parametric CAD: Applications in MAE 3 Dor Ashur Dr. Nathan Delson.
Solid Modeling Overview ENGR 1182 SolidWorks 01. Solid Modeling Simple Parts  Solid modeling uses simple steps in a computer program to create 3D rendering.
Services Product design Concept design
University of Puerto Rico at Mayagüez Department of Mechanical Engineering Introduction to NX 6.0 Software Overview Modified by (2011): Dr. Vijay K. Goyal.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
Engineering 1182 College of Engineering Engineering Education Innovation Center Solid Modeling Introduction Rev: , AJPSolid Modeling Introduction1.
Ion Mitigation for Laser IFE Optics Ryan Abbott, Jeff Latkowski, Rob Schmitt HAPL Program Workshop Los Angeles, California, June 2, 2004 This work was.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Fusion Magic? “Any sufficiently advanced technology is indistinguishable from magic. Radical, transformative technologies typically appear ‘impossible’
Scott Kohn with Tammy Dahlgren, Tom Epperly, and Gary Kumfert Center for Applied Scientific Computing Lawrence Livermore National Laboratory October 2,
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
UCRL-PRES Magnet Design Considerations & Efficiency Advantages of Magnetic Diversion Concept W. Meier & N. Martovetsky LLNL HAPL Program Meeting.
Mechanical Desktop Design Process Key Concepts in this Lesson: The design process Part modeling Overview This lesson explains the designer process, and.
HYDRAULIC MOTORS.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
Status and Plans for Systems Modeling for Laser IFE HAPL Progress Meeting November 2001 Pleasanton, CA Wayne Meier, Charles Orth, Don Blackfield.
The Neutronics of Heavy Ion Fusion Chambers Jeff Latkowski and Susana Reyes 15 th Heavy Ion Inertial Fusion Symposium Princeton, NJ June 9, 2004 Work performed.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Mercury DPSSL Driver: Smoothing, Zooming and Chamber Interface Lawrence Livermore National Laboratory Ray Beach, John Perkins, Wayne Meier, Chris Ebbers,
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Ion Mitigation for Laser IFE Optics Ryan Abbott, Jeff Latkowski, Rob Schmitt HAPL Program Workshop Atlanta, Georgia, February 5, 2004 This work was performed.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Liquid Walls Town Meeting May 5, 2003, Livermore, CA Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Enterprise Library 3.0 Memi Lavi Solution Architect Microsoft Consulting Services Guy Burstein Senior Consultant Advantech – Microsoft Division.
Optimum Pump Performance for Process Applications
Update on Systems Modeling and Analyses
Concepts and Requirements for GIMM Structures
NTI Nanotech International
Heavy Ion Fusion Modeling Update*
Maintenance.
Presenter: Chuck Marks
Presentation transcript:

Conceptual Design for HYLIFE-II Maintenance Ryan P. Abbott ARIES Project Meeting May 6, 2003 This work was performed under the auspices of the U.S. Department of Energy by the University of California, Lawrence Livermore National Laboratory under contract No. W-7405-ENG-48

Overview Motivations for periodic maintenance capability Introduction to HYLIFE-II parametric CAD model Details of maintenance capability Future work Questions and Feedback

History of Periodic Maintenance Issue Many threats will assault HYLIFE-II chamber components –Radiation He embrittlement Volumetric swelling Activation –Dynamic Erosion Pulsed thermal stresses and fatigue Material performance uncertainties prompt an investigation into the economic tradeoffs of periodic chamber maintenance –Various material damage limits considered –Flibe pumping power and plant downtime accounted for –COE normalized to 100 dpa limit and no maintenance for 30 fpy

History of Periodic Maintenance Issue Results of investigation presented at October 2002 ARIES meeting LLNL starts parametric CAD model of HYLIFE-II chamber –Serve as a flexible platform for integrating previous concepts with future changes and innovations –Stimulate greater interaction between groups within HIF community Design decided to be updated to support periodic maintenance –Be compatible with basic remote handling equipment –Make all components down to first-wall removable

HYLIFE-II Parametric CAD Model - Introduction Previous graphical design work –Restricted to 2-D –Updates time consuming –Difficult visualization for uninitiated –No interference checking Current model –Fully 3-D solid –Rapid design changes –Components export directly to finite element analysis routines –Subsystems easy to isolate –Animation and rendering capability

HYLIFE-II Parametric CAD Model - Pictures “BOOM!” – John Madden

HYLIFE-II Parametric CAD Model - Pictures

HYLIFE-II Maintenance Concept - Introduction Broad features –Depends only on vertical cranes and simple robotic manipulators –Does not compromise any functional capability of previous chamber –Most internal components assembled as a single modular unit to be replaced in entirety –All structures down to first-wall easily accessible

Procedure details –Remove chamber top –Pull beamline assembly –Extract main drive shafts –Lift out pocket nozzle assembly –Pull cross jet nozzles –Remove cross jet supports –Service first-wall –Reinstall new components in reverse order HYLIFE-II Maintenance Concept - Animation Double-click on picture to play animation

Future Work on HYLIFE-II Model Beamline region –Add vortex shielding systems –Beam neutralizers –Target injection apparatus Main chamber –Cross-jet flow redirectors –First-wall detail –First-wall removal procedure Rest of plant –Integrate chamber model with other plant systems

Interactive Question and Answer