Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.

Slides:



Advertisements
Similar presentations
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Advertisements

Cryomodule Quad Doublet Solutions – M Church 9/12/07 1 NML Cryomodule Quad Doublet Lattice Solutions  Question  Are quadrupoles required as part of the.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Alignment and Beam Stability
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
Considerations on laser-p+ beam merging for CB, BG, PM.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
D. Trbojevic, N. Tsoupas, S. Tepikian, B. Parker, E. Pozdeyev, Y. Hao, D. Kayran, J. Beebe-Wang, C. Montag, V. Ptitsyn, and V. Litvinenko eRHIC and MeRHIC.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
New emittance monitor beamline
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Beam Optics of the TTF2 Nina Golubeva DESY. Beam optics from the BC2 up to the undulators General introduction to linear optics: – constraints for different.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
Harold G. Kirk Brookhaven National Laboratory Rings with 400 and 800 MHz RF Ring Cooler Meeting Oxford, Ms. March 11-12, 2004.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
Plans for Diamond-II ESLSXX Workshop, Bessy II, 19 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for Accelerator Science University.
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
Primary Beam Lines for the Project at CERN
Target insertion matching and standard cell optics optimization
The Medium and High resolution mass separators for SPES facility
FFAG Recirculation and Permanent Magnet Technology for ERL’s
Dispersion correction in the bypass dogleg
J-PARC main ring lattice An overview
MDI and head-on collision option for electron-positron Higgs factories
Status on Work for Splitter FS and Dilution System FS
Large Booster and Collider Ring
Main magnets for PERLE Test Facility
SCU Next Phase Meeting July 8, 2014.
Specifications for the JLEIC IR Magnets
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
PS2 Injection/Extraction Layout
Collider Ring Optics & Related Issues
Beam Loss Simulations LHC
RLA WITH NON-SCALING FFAG ARCS
MEBT1&2 design study for C-ADS
IR Lattice with Detector Solenoid
Linear beam dynamics simulations for XFEL beam distribution system
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Vertical Dogleg Options for the Ion Collider Ring
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
Update on MEIC Nonlinear Dynamics Work
Transfer Line for EIC.
Andrew Hutton Concept suggested independently by Haipeng Wang
Ion Collider Ring Using Superferric Magnets
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Alternative Ion Injector Design
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Possibility of MEIC Arc Cell Using PEP-II Dipole
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Upgrade on Compensation of Detector Solenoid effects
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi

Outline Geometrical layout –O–Overview –M–Matched parameters Elements –D–Dipoles –Q–Quadrupoles –B–BPMs –C–Correctors Preliminary Optics design Conclusions and open questions

Geometrical layout X Z 4223 Y 2380 X Z Y MAD-X global reference system

Geometrical layout It has been assumed zero vertical angle at the exit of the RF gun The e- beam arrives orthogonal to the plasma cell It is m (from the RF gun to the entrance of the plasma cell) The initial horizontal angle can be optimized in order to use the proposed tunnel RF Gun Already designed tunnel

Geometrical layout It has been assumed 5 cm (?) offset between the electron line and the proton line at the entrance of the cell The required deflection angle to deflect the e- beam on axis with p+ beam in 3 m is mrad (assuming the first bend at the entrance of the plasma cell) This will lead to a Dx different from zero, unless quads are used (at least 2 to close the dispersion)

Outline Geometrical layout –O–Overview –M–Matched parameters Elements –D–Dipoles –Q–Quadrupoles –B–BPMs –C–Correctors Preliminary Optics design Conclusions and open questions

Elements – Dipoles 3 vertical and 2 horizontal bends magnet L_yoke = 340 mm I_max = 330 A = T.m (20% needed assuming p=20 MeV/c)

Elements – Quadrupoles 4 defocusing and 5 focusing magnet L_yoke = 200 mm g_max = T/m (12.7% needed) I_max = 100 A R = 40 mm (good field = 30 mm)

Elements 9 BPMs (1vs1 strategy) for the 9 quads 2 for the final focus 1 at the exit of the RF gun L = 80 mm 9 horizontal/vertical correctors to cover all quads 4 just before the plasma cell entrance for the final focus L = 82 mm Chosen among the ones installed at facility BPMsCorrectors

Outline Geometrical layout –O–Overview –M–Matched parameters Elements –D–Dipoles –Q–Quadrupoles –B–BPMs –C–Correctors Preliminary Optics design Conclusions and open questions

Preliminary optics design Parameters at the exit of the RF gun Parameters requested at the entrance of the plasma cell Parameters obtained at the entrance of the plasma cell

Preliminary optics design Entrance of the plasma cell Entrance of the plasma cell Vertical Bends Horizontal Bends

Outline Geometrical layout –O–Overview –M–Matched parameters Elements –D–Dipoles –Q–Quadrupoles –B–BPMs –C–Correctors Preliminary Optics design Conclusions and open questions

Conclusions Preliminary design of the e- beam line at 20 MeV satisfies geometrical and optical requirements All the main magnet parameters are guessed starting from existing hardware (still missing iteration with CERN experts)

Open questions Commercial magnets or develop new at CERN? Beam size at merging point – Also, effect of the plasma on the e- beam Offset between p+ and e- beam (any constraints?) – Requirements about the 2 bends in the plasma cell (strength, aperture, etc..) Common beamline instrumentation (BPMs)