N u F a c t 0 9 Beta Beams, Nufact09, Elena Wildner Beta Beams Elena Wildner, CERN 22/07/09 1 NuFact09, July 20-25, 2009 — Illinois Institute of Technology.

Slides:



Advertisements
Similar presentations
NuPECC Brussels 2009 The Cyclotron Research Centre of Louvain-la-Neuve: Present status Marc Loiselet UCL, Centre de Recherches du Cyclotron Louvain-la-Neuve.
Advertisements

Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
NNN05, 8/4/05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the Beta-beam Study Group
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Now 2010: Beta Beams, Elena Wildner1 Beta-Beams Elena Wildner, CERN
Collection device : status report Semen Mitrofanov Marc Loiselet Thierry Delbar Flerov Laboratory of Nuclear Reactions Joint Institute for Nuclear Research.
Alain Blondel Detectors UNO (400kton Water Cherenkov) Liquid Ar TPC (~100kton)
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Nufact 2008The Beta Beam WP1 Beta beam R&D status Elena Wildner, CERN on behalf of the Beta Beam Study Group EURISOL/Euronu.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
EUROnu Annual Meeting 2-4 June Beta-Beam Costing Exercise Elena Wildner, CERN 03/06/10 1 EUROnu Annual Meeting, 2-4 June 2010.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
NuFact'06, Aug. 2006A. Fabich, CERNRadioactive Ion Beams, 1 Radioactive Ion Beams A. Fabich, CERN on behalf of the Beta-beam Study Group
1 Further Demands on beam Intense, Intense, Intense, ….Intense, Intense, Intense, …. –Very far detector, extremely small cross section, search small osci.
Mats Lindroos Measuring difficult reaction rates involving radioactive beams: A new approach John D’Auria, Mats Lindroos, Jordi Jose and Lothar Buchmann.
GDR NEUTRINO - SESSION April, LPNHE Neutrinos options at CERN R. Garoby – 27/04/2009.
NUFACT05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the EURISOL Beta-beam task
Low-Energy Ionization “Cooling” David Neuffer Fermilab.
Review EUROnu, Beta Beams, Elena Wildner1 Elena Wildner, CERN, For WP
TRACKING AND PARTICLE- MATTER INTERACTION STUDIES IN THE BETA-BEAM DECAY RING E.Wildner, A. Fabich (CERN) Common EURISOL DS - EURONS Town Meeting Helsinki,
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
Summary WP4, Beta Beams, Elena Wildner1 Beta-Beams (WP4) Summary Elena Wildner, CERN
Radioactive ion beam production at other facilities
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
EUROnu mid-term meeting, RAL, Jan 2011 Beta-Beam Baseline Elena Wildner, CERN For WP4 19/01/ EUROnu mid term meeting, RAL, Jan 2011.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
EuCARD 1st ANNUAL MEETING, 2010 Progress on ion production studies for beta beams Elena Wildner, CERN 14/04/10 1 Rutherford Appleton Laboratory (RAL),
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Low-Energy Ionization “Cooling” David Neuffer Fermilab.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
GDR Neutrino, Annecy 2007 Beta-beam team1 Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN on behalf of the Beta-beam Study Group
Collection device for 8 Li and 8 B Semen Mitrofanov Marc Loiselet Thierry Delbar Université catholique de Louvain Centre de Recherches du Cyclotron Louvain-la-Neuve.
Crakow Epiphany Conference, Beta Beams, Elena Wildner1 Beta-Beams Status and Challenges Elena Wildner, CERN
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
European Strategy for Future Neutrino Physics, Elena Wildner Beta-beam design status and technical challenges ahead Elena Wildner, CERN 02/10/09 1 European.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Elena Wildner, CERN Beta Beams GDR Neutrino 20 juin 2012 to 21 juin 2012 at APC, Paris.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
PPAP Review 09 Imperial College/RAL Dave Wark Future Neutrino Oscillation Experiments Dave Wark Imperial/RAL PPAP Birmingham July 15 th, 2009.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
Status of the magnet studies in the ARCS (FLUKA)
Accelerators for neutrino physics: The Beta Beam
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
b-beams: R&D Challenges in FP7
Status of the beta-beam study
Elena Wildner, CERN EUROnu meeting Paris June
Light Radioactive Beam Production via Two Stage Irradiation Setup
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Accelerator R&D for Future Neutrino Projects
Status of the beta-beam study
Superbeams with SPL at CERN
Elena Wildner, CERN For the Beta Beam Collaboration
Status of the Production Ring for Beta Beams Studies
Beta beam R&D status Elena Wildner, CERN on behalf of
Collimation for beta-beams
Status of the BETA-BEAM Task within the EURISOL Design Study
Joint session – Beta-beams
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
Concepts and R&D for beta beam facilities
Presentation transcript:

N u F a c t 0 9 Beta Beams, Nufact09, Elena Wildner Beta Beams Elena Wildner, CERN 22/07/09 1 NuFact09, July 20-25, 2009 — Illinois Institute of Technology — Chicago

Outline Beta Beam Concepts A Beta Beam Scenario Ion Production Other challenges Conclusion 2 Beta Beams, Nufact09, Elena Wildner 22/07/092

Beta-beams, recall E0E0 Beta Beams, Nufact09, Elena Wildner 22/07/093 Aim: production of (anti-)neutrino beams from the beta decay of radio- active ions circulating in a storage ring Similar concept to the neutrino factory, but parent particle is a beta- active isotope instead of a muon. Beta-decay at rest  spectrum well known from the electron spectrum Reaction energy Q typically of a few MeV Accelerate parent ion to relativistic  max Boosted neutrino energy spectrum: E   2  Q Forward focusing of neutrinos:   1/  Pure electron (anti-)neutrino beam! Depending on  + - or  - - decay we get a neutrino or anti-neutrino Two different parent ions for neutrino and anti-neutrino beams Physics applications of a beta-beam Primarily neutrino oscillation physics and CP-violation Cross-sections of neutrino-nucleus interaction

Beta Beams, Nufact09, Elena Wildner Choice of radioactive ion species Beta-active isotopes Production rates Life time Dangerous rest products Reactivity (Noble gases are good) Reasonable lifetime at rest If too short: decay during acceleration If too long: low neutrino production Optimum life time given by acceleration scenario In the order of a second Low Z preferred Minimize ratio of accelerated mass/charges per neutrino produced One ion produces one neutrino. Reduce space charge problems NuBase t 1/2 at rest (ground state) 1 – 60 s 1ms – 1s 6He and 18Ne 8Li and 8B 22/07/094

Beta Beams, Nufact09, Elena Wildner 5 The EURISOL scenario boundaries Based on CERN boundaries Ion choice: 6 He and 18 Ne Based on existing technology and machines Ion production through ISOL technique Bunching and first acceleration: ECR, linac Rapid cycling synchrotron Use of existing machines: PS and SPS Relativistic gamma=100 for both ions SPS allows maximum of 150 ( 6 He) or 250 ( 18 Ne) Gamma choice optimized for physics reach Opportunity to share a Mton Water Cherenkov detector with a CERN super-beam, proton decay studies and a neutrino observatory Achieve an annual neutrino rate of 2.9*10 18 anti-neutrinos from 6 He neutrinos from 18 Ne The EURISOL scenario will serve as reference for further studies and developments: Within Euro we will study 8 Li and 8 B EURISOL scenario top-down approach 22/07/095 FP6 "Structuring the European Research Area" programme (CARE, contract number RII3-CT ) (*)

Beta Beams, Nufact09, Elena Wildner 22/07/096 Some scaling Accelerators can accelerate ions up to Z/A × the proton energy. L ~ E /  m 2 ~  Q, Flux ~ L −2 => Flux ~ Q −2 Cross section ~ E ~  Q Merit factor for an experiment at the atmospheric oscillation maximum: M=  Q Decay ring length scales ~  (ion lifetime)

7 The EURISOL scenario 0.4 GeV 1.7 GeV 8.7 GeV 93 GeV Decay ring B  = 1500 Tm B = ~6 T C = ~6900 m L ss = ~2500 m 6 He:  = Ne:  = 100 Design report July 2009 Beta Beams, Nufact09, Elena Wildner Aimed: He ( /s after target) Ne ( /s after target)

Beta Beams, Nufact09, Elena Wildner ECR, Linac, RCS, Decay Ring (Nufact08) RCS design: A. Lachaize, A. Tkatchenko, IPNO, CNRS 22/07/098 LINAC Design: A. Bechtholt, Franfurt am Main Antoine CHANCÉ, Jacques Payet CEA Saclay IRFU/SACM T.Thuillier, L. Latrasse, T. Lamy, C. Fourel, J. Giraud, LPSC, CNRS/IN2P3-UJF-INP Grenoble, Trophime, P. Sala, J. Dumas, F. Debray LCMI, CNRS, Grenoble

9 Beta Beams, Nufact09, Elena Wildner Intensity evolution during acceleration Cycle optimized for neutrino rate towards the detector 30% of first 6 He bunch injected are reaching decay ring Overall only 50% ( 6 He) and 80% ( 18 Ne) reach decay ring Normalization Single bunch intensity to maximum/bunch Total intensity to total number accumulated in RCS Bunch 20 th 15 th 10 th 5th 1st total

Beta Beams, Nufact09, Elena Wildner Radioprotection 22/07/0910 Residual Ambient Dose Equivalent Rate at 1 m distance from the beam line (mSv h -1 ) RCS (quad - 18 Ne) PS (dip - 6 He) SPSDR (arc - 18 Ne) 1 hour day week Annual Effective Dose to the Reference Population (  Sv) RCSPSSPSDR (only decay losses) Stefania Trovati, Matteo Magistris, CERN

Beta Beams, Nufact09, Elena Wildner Activation and coil damage in the PS The coils could support 60 years operation with a EURISOL type beta-beam M. Kirk et. al GSI 22/07/0911

Beta Beams, Nufact09, Elena Wildner Momentum collimation (study ongoing): ~5* He ions to be collimated per cycle Decay: ~5* Li ions to be removed per cycle per meter p-collimation merging decay losses injection Particle turnover in decay ring Straight section Arc Momentum collimation 22/07/0912

Elena Wildner, June Duty factor and Cavities for He/Ne Beta Beams, SPC Panel Neutrinos bunches, 10 ns long, distance 23*4 nanosseconds filling 1/11 of the Decay Ring, repeated every 23 microseconds ions, 2% !!! Erk Jensen, CERN

Beta Beams, Nufact09, Elena Wildner Open Midplane Dipole for Decay Ring 14 Cos2  design open midplane magnet Manageable (7 T operational) with Nb -Ti at 1.9 K Aluminum spacers possible on midplane to retain forces: gives transparency to the decay products Special cooling and radiation dumps may be needed inside yoke. J. Bruer, E. Todesco, CERN 22/07/0914

Beta Beams, Nufact09, Elena Wildner 1522/07/0915 Open mid-plane Quadrupole Mid-plane Energy deposited Open mid-plane Acknowledgments (magnet design): F Borgnolutti, E. Todesco (CERN)

Beta Beams, Nufact09, Elena Wildner 1622/07/0916 Open mid-plane Quadrupole Opening angle Acknowledgments (magnet design): F Borgnolutti, E. Todesco (CERN)

Beta Beams, Nufact09, Elena Wildner Options for production ISOL method at 1-2 GeV (200 kW) > He per second < Ne per second Studied within EURISOL Direct production > (?) 6 He per second Ne per second Studied at LLN, Soreq, WI and GANIL Production ring (?) 8 Li >10 13 (?) 8 B Will be studied Within EURO Courtesy M. Lindroos Aimed: He ( /s) Ne ( /s) 22/07/0917 N.B. Nuclear Physics has limited interest in those elements => Production rates not pushed! Try to get ressources to persue ideas how to produce Ne!

Beta Beams, Nufact09, Elena Wildner Options for production ISOL method at 1-2 GeV (200 kW) > He per second < Ne per second Studied within EURISOL Direct production > (?) 6 He per second Ne per second Studied at LLN, Soreq, WI and GANIL Production ring (?) 8 Li >10 13 (?) 8 B Will be studied Within EURO Courtesy M. Lindroos Aimed: He ( /s) Ne ( /s) 22/07/0918 N.B. Nuclear Physics has limited interest in those elements => Production rates not pushed! Try to get ressources to persue ideas to produce Ne!

Beta Beams, Nufact09, Elena Wildner 6 He (ISOL) Converter technology preferred to direct irradiation (heat transfer and efficient cooling allows higher power compared to insulating BeO). 6 He production rate is ~2x10 13 ions/s (dc) for ~200 kW on target. Converter technology: (J. Nolen, NPA 701 (2002) 312c) T. Stora, N. Thollieres, CERN Recent measurements at ISOLDE 22/07/0919

Beta Beams, Nufact09, Elena Wildner Options for production ISOL method at 1-2 GeV (200 kW) > He per second < Ne per second Studied within EURISOL Direct production > (?) 6 He per second Ne per second Studied at LLN, Soreq, WI and GANIL Production ring (?) 8 Li >10 13 (?) 8 B Will be studied Within EURO Courtesy M. Lindroos Aimed: He ( /s) Ne ( /s) N.B. Nuclear Physics has limited interest in those elements => Production rates not pushed! Try to get ressources to persue ideas to produce Ne! 22/07/0920

Beta Beams, Nufact09, Elena Wildner 18 Ne (Direct Production) Producing Ne could be possible with a beam power (at low energy) of 2 MW (or some 130 mA 3 He beam on MgO). To keep the power density similar to LLN (today) the target has to be 60 cm in diameter. To be studied: Extraction efficiency Optimum energy Cooling of target unit High intensity and low energy ion linac High intensity ion source Water cooled target holder and beam dump Thin MgO target Ion beam Geometric scaling S. Mitrofanov and M. Loislet at CRC, Belgium T. Stora, CERN, > ? 22/07/0921

Beta Beams, Nufact09, Elena Wildner 6 He (Two Stage ISOL) Studied 9 Be(n,α) 6 He, 11 B(n,  ) 8 Li and 9 Be(n,2n) 8 Be production For a 2 mA, 40 MeV deuteron beam, the upper limit for the 6 He production rate via the two stage targets setup is ~6∙10 13 atoms per second. Interesting also for 8 Li T.Y.Hirsh, D.Berkovits, M.Hass (Soreq, Weizmann I.) 22/07/0922 It seems we can produce plenty of antineutrinos…

Beta Beams, Nufact09, Elena Wildner Options for production ISOL method at 1-2 GeV (200 kW) > He per second < Ne per second Studied within EURISOL Direct production > (?) 6 He per second Ne per second Studied at LLN, Soreq, WI and GANIL Production ring (?) 8 Li >10 13 (?) 8 B Will be studied Within EURO Courtesy M. Lindroos Aimed: He ( /s) Ne ( /s) 22/07/0923 N.B. Nuclear Physics has limited interest in those elements => Production rates not pushed! Try to get ressources to persue ideas to produce Ne! Difficult Chemistry

Beta Beams, Nufact09, Elena Wildner New approaches for ion production 7 Li(d,p) 8 Li 6 Li( 3 He,n) 8 B 7 Li 6 Li “Beam cooling with ionisation losses” – C. Rubbia, A Ferrari, Y. Kadi and V. Vlachoudis in NIM A 568 (2006) 475–487 “Development of FFAG accelerators and their applications for intense secondary particle production”, Y. Mori, NIM A562(2006)591 From C. Rubbia, et al. in NIM A 568 (2006) 475–487 Studied within Euro FP7 (*) 24 FP7 “Design Studies” (Research Infrastructures) EUROnu (Grant agreement no.: ) (*) Supersonic gas jet target, stripper and absorber

Beta Beams, Nufact09, Elena Wildner 25 Beta Beam scenario EUROnu, FP7. Neutrino Source Decay Ring ISOL target, Collection Decay ring B  ~ 500 Tm B = ~6 T C = ~6900 m L ss = ~2500 m 8 Li:  = B:  = 100 SPS RCS, 5 GeV -beam to experiment Linac, 0.4 GeV 60 GHz pulsed ECR Existing!!! 92 GeV PS2 31 GeV Ion production PR Detector Gran Sasso (~ 5 times higher Q) Ion Linac 20 MeV 8B/8Li 22/07/09

Beta Beams, Nufact09, Elena Wildner The beta-beam in EURONU DS (I) The study will focus on production issues for 8 Li and 8 B 8 B is highly reactive and has never been produced as an ISOL beam Production ring: enhanced direct production Ring lattice design (CERN) Cooling (CERN +) Collection of the produced ions, release efficiencies and cross sections for the reactions (UCL, INFN, ANL) Sources ECR (LPSC, GHMFL) Supersonic Gas injector (PPPL +) CERN Complex All machines to be simulated with B and Li (CERN, CEA) PS2 presently under design (apertures!) Multiple Charge State Linacs (P Ostroumov, ANL) 22/07/0926

Beta Beams, Nufact09, Elena Wildner 22/07/ Flavor Oscillation needs two significantly different baselines to disentangle CP and matter effects Possible realization with one detector only (price)  -beam: SPL: = 260 MeV L opt = 134 km CERN – Frejus: 130 km e -beam:  = 150 Lopt = 130 km  = 500 Lopt = 1000 km CERN – Frejus: 130 km DESY – Frejus: 960 km Associated partners in EURONU DS

The production Ring: Ion Source for Beta Beams 12m circumference mirror symmetrical structure 1.5T dipoles 5 quadrupole-families Dx = 0 in cavity-section best choice of Dx in target-section depends on wedge angle of the target wedged Gas Jet-Target RF Cavity Symmetry Point Michaela Schaumann, Aachen/CERN, 2009 Beta Beams, Nufact09, Elena Wildner 22/07/0928

Beta Beams, Nufact09, Elena Wildner Simulations, Production Ring (ion source) 22/07/0929 GEANT4 Jokob Wehner, Aachen/CERN, 2009

Beta Beams, Nufact09, Elena Wildner The production ring cooling: review 7 Li(d,p) 8 Li 6 Li( 3 He,n) 8 B 7 Li 6 Li From C. Rubbia, et al. in NIM A 568 (2006) 475–487 22/07/09 30 Low-energy Ionization cooling of ions for Beta Beam sources – D. Neuffer (FERMILAB-FN-0808-APC) Mini-workshop Fermilab next week on Beta Beams, ionization cooling (David Neuffer )

Beta Beams, Nufact09, Elena Wildner Challenge: collection device A large proportion of beam particles ( 6 Li) will be scattered into the collection device. Production of 8 Li and 8 B: 7 Li(d,p) 8 Li and 6 Li( 3 He,n) 8 B reactions using low energy and low intensity ~ 1nA beams of 6 Li(4-15 MeV) and 7 Li(10-25 MeV) hitting the deuteron or 3 He target. Rutherford scattered particles 8B-ions Collection on axis 22/07/09 31 Semen Mitrofanov Marc Loiselet Thierry Delbar

Beta Beams, Nufact09, Elena Wildner 3222/07/0932 First beam runs – November÷December’09 – several two days runs Full-time beam tests - January÷February’10 End of the summer’10 - we hope we will finished with 8 Li. Collection Device, Schedule Semen Mitrofanov Marc Loiselet Thierry Delbar Terra Incognita: “We have 1 years to discover how to produce 8 B beam of necessary intensity and 1.5 year to develop the production technique »

7Li First Experiment performed in July 2008 Inverse kinematic reaction: 7 Li + Cd 2 target E=25 MeV Data reduction in progress Future: reduce contamination Cross section measurements at L aboratori N azionali di L egnaro M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete Beta Beams, Nufact09, Elena Wildner 22/07/0933

polyhelix Ground V=0 MW window V= 100 kV 100 kV insulation ECR 60 GHz Microwaves polyhelix Ions extraction insulator Gas Water cooled plasma chamber Multi electrode extraction Beta Beams, Nufact09, Elena Wildner 22/07/0934 ECR Source T. Lami

How to get a 60 GHz Gyrotron and perform experiments? Use any external resources possible (collaborate!!) ISTC project: IAP Nizhny Novgorod (Plasma physics theory and experiments, gyrotron manufacturing) LPSC in this programme will be responsible of the design and construction of various ECR ion sources with the help of LNCMI. LNCMI has committed itself to the magnetic characterization (i.e. a permanent room for experiments + electrical Power!!) Geert Rikken Director of the LNCMI Estimated total cost of the project (US $) Requested from the ISTC Other financial source 1: LPSC T. Lami

Beta Beams, Nufact09, Elena Wildner 22/07/09 36 Associates Weizmann Institue of Science, Revohot  Michael Hass  Partners: GANIL and Soreq  Collaboration with Aachen (exchange of students) Work Focus  produce light radioactive isotopes also for beta beams  secondary neutrons from an intense, 40 MeV d beam (6He and 8Li) and direct production with 3He or 4He beams (18Ne).  Use of superconducting LINACs such as SARAF at Soreq (Israel) and the driver for SPIRAL-II (GANIL). Added Value  To produce strong beta beam ion candidates or production methods not in EUROnu Courtesy Micha Hass

Beta Beams, Nufact09, Elena Wildner 22/07/0937 He/Ne & Li/B Courtesy Christian Hansen May 2009 o 3.13 x x10 14

Beta Beams, Nufact09, Elena Wildner 22/07/0938 No dutycycle

Elena Wildner, June Barrier Buckets, relaxed duty factor Beta Beams, SPC Panel Neutrinos See Poster Session today : Christian Hansen (CERN)

Elena Wildner, June -0940Beta Beams, SPC Panel Neutrinos Gamma and decay-ring size, 6 He GammaRigidity [Tm] Ring length T=5 T f=0.36 Dipole Field rho=300 m Length=6885m Magnet R&D

Beta Beams, Nufact09, Elena Wildner Conclusions (i) The EURISOL beta-beam conceptual design report will be presented in second half of 2009 First coherent study of a beta-beam facility Top down approach 18Ne shortfall Duty Factors are challenging: Collimation and RF in Decay Ring 22/07/0941

Beta Beams, Nufact09, Elena Wildner Conclusions (ii) A beta-beam facility using 8 Li and 8 B (EUROnu) Experience from EURISOL Production issues (not to forget 18Ne) Optimize chain Revisit Duty Factors Apertures of PS2 (Complete) simulation of beta beam complex Costing (add what is not in EUROnu) First results will come from Euronu DS ( ) 22/07/0942

Beta Beams, Nufact09, Elena Wildner 22/07/0943 Acknowledgements Particular thanks to M. Benedikt, FP6 Leader M. Lindroos, and all contributing institutes and collaborators FP6 "Structuring the European Research Area" programme (CARE, contract number RII3-CT ) and FP7 “Design Studies” (Research Infrastructures) EUROnu (Grant agreement no.: )