Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan 281-483-3729.

Slides:



Advertisements
Similar presentations
Medical Device Software Development
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
IECEE CB Scheme – a tool to ensure products access to the Russian market.
Define & Compare Flowcharts of Each Method Tom Delong.
AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J. Snoddy) DART Contract (CPIF) 17 Mission Directorate.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Aerospace Materials Quality Control
(H.L.) HAZARD ANALYSIS CRITICAL CONTROL POINTS
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
I) Bob Ettinger Flight Test Manager Northrop Grumman Aerospace Systems El Segundo, CA An Approach to Flight Readiness and Executive Readiness Reviews The.
Supernova/Acceleration Probe (SNAP) Reliability & System Safety Dick Bolt David Bogart June 28, 2001.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
July 18, 2001 Mission Success Begins With Safety Quality Leadership Forum Software Quality Assurance at GSFC Dr. Linda H. Rosenberg Chief Scientist for.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Server Virtualization: Navy Network Operations Centers
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
10/14/ :25:29 PM ISSP On-Orbit QA To share with QLF the ISS approach to the On-Orbit Quality Assurance process and the current status NASA QLF
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
Important informations
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The NASA Safety.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
Constellation Space Transportation Planning Office July 30, 2009.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Payload Safety Review Plan and Issues Leland D. Hill.
Safety and Mission Assurance Directorate, Goddard Space Flight Center Supply Chain Management Panel Session: NASA Supplier Assessments: Processes, Results.
Doane Pet Care Company Pet Food Safety System (PFSS) M.W. Merkel September 23, 2003 Animal Feed Safety System Public Meeting.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module VII Purchasing and delivery for the Manufacture of Safe Pet.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Industrial safety 0. Highlights Communication Management Evaluation Investigation Practice/implementation Development 1.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Hospital Accreditation Documentation Process & Standard Requirements
POIC Safety Payload Operations & Integration Center Mitchell Moore Marshall Space Flight Center ARES Corporation POIC Safety 1.
An Integrated Model-Based Approach to System Safety and Aircraft System Architecture Development Eric Villhauer – Systems Engineer Brian Jenkins – System.
Medical Device Software Development
THEMIS Mission Assurance
GLAST Large Area Telescope:
GLAST Large Area Telescope:
ISSP On-Orbit QA To share with QLF the ISS approach to the On-Orbit Quality Assurance process and the current status NASA QLF
An Assessment of Space Shuttle Flight Software Development Processes
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment Is it safe? Is it built right? Will it work?...throughout its lifetime?

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan S AFETY for both PIH and Experiment Milestones: Flight Safety Review – Phase IIDecember 2004 Ground Safety Review – Phase IIApril 2005 Flight Safety Review – Phase IIIApril 2006 Ground Safety Review – Phase IIISeptember 2006 Process: Payload Safety Review Panel [PSRP]  point-of-contact: NC/Chuck Bailey Action: Preparation of all Safety Data Packages is the responsibility of Lockheed Martin Space Operations (LMSO)

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan ASSURANCE and RELIABILITY for PIH Quality Engineering Quality Assurance Evaluate Project Requirements Evaluate Manufacturing/Fabrication Plans and Processes Define Inspection Requirements Approve Testing Investigate Non-conformances and Mishaps Support System Acceptance Reviews (SAR's) Conduct Pre-Shipment Readiness Reviews Manufacturing Inspections Test Verification Program Stock Control Discrepancy Reporting Metrology Process Assurance Monitoring Clean Room and Laboratory Services QARC Document Processing and Maintenance Procurement Quality Assurance Fastener and Materials Testing Software Assurance Analyze Software Requirements Evaluate Software Design Approve Testing/Certification Reliability Assurance Evaluate Project Requirements and Verifications Approve Testing/Certification Investigate Nonconfomances and Failures Support Requirements and Design Reviews Establish minimum reliability goals

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan CoFR Endorsements Endorsement PIHExperimentComment Certification YesSafety Only Limited Life YesYes* Hazards, FMEA’s Yes Flight Rules/Crew Procedures Yes ALERTS, GIDEP’s, TWX’s YesYes* ADP’s, TPS’s YesYes* H/W &S/W Noncomformances YesYes* Open FIAR’s YesYes* SPN’s YesYes* *Indirect Involvement via SSP and ISS S&MA Organizations

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan Cost Risk R ELIABILITY and R ISK M ANAGEMENT for Experiment

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan R ELIABILITY and R ISK M ANAGEMENT for Experiment Observation; Attend Meetings Selective Surveillance CryogenicsEMI & Magnetic Systems Thermal Systems Pressure Systems StructuresEEE Parts Full On-Site Quality System for Each Collaborator On-Demand Independent Assessment WeldingNon Destructive Evaluation (NDE)

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan Observation; Attend Meetings Selective Surveillance Space Cryomagnetics LTD, UK Arde, Inc., USA CAEN Aerospace, Italy Full On-Site Quality System for Each Collaborator On-Demand Independent Assessment Carlo Gavazzi Space SpA, Italy ISATECH Engineering GmbH, Germany OHB GmbH, Germany R ELIABILITY and R ISK M ANAGEMENT for Experiment *Note: Sample list of manufacturers

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan R ELIABILITY and R ISK M ANAGEMENT for Experiment

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan

Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan RiskCost Observation; Attend Meetings Selective Surveillance Full On-Site Quality System for Each Collaborator On-Demand Independent Assessment Cost Risk R ELIABILITY and R ISK M ANAGEMENT for Experiment Recommendation: Selective Independent Assessment & Surveillance