DETECTOR COOLING PROJECT Preliminary Plan for WP#1 P. Petagna – June 17 th 2009.

Slides:



Advertisements
Similar presentations
Getting Control of Your Projects! Kirk Schanzenbach NY State Comptrollers Office.
Advertisements

If You Give Your BMET* a Bagel… *BMET = BioMedical Equipment Technician a.k.a. “Biomed”
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
Manage Quality
Particle Measurement Programme Informal Working Group (PMP) Progress Report and Next Steps Giorgio Martini Sustainable Transport Unit.
TRANSLINK Training Effective Management and Supervision of PhD Candidates University of Indonesia, 9-10 May 2006 Postgraduate Supervision Dr. Paul Timms.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Testing an individual module
ILIAS Physics in deep underground laboratories JRA1 : Low background techniques WP4 : Radiopurity of materials Pía Loaiza Laboratoire Souterrain de Modane,
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Chapter 2- Software Process Lecture 4. Software Engineering We have specified the problem domain – industrial strength software – Besides delivering the.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
DCP Meeting – September 12 th 2010 WP1/4: Leak Search & Repair- Paolo Petagna 1/9 PH-DT - WP1: REMOTE LEAK REPAIR- Update Report on status of leak analysis/quantification.
DETECTOR COOLING PROJECT Status and Plan for WP#1 P. Petagna – September 30 th 2009 (update of the slides prepared for June 17 th August 19 th meetings.
A small leak was found in the freon gas cooling circuits of this air- conditioning unit. A technician was called out to fix it LTI no 43: Tightening bolt.
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
W ORK P ACKAGE 2 C ONCEPTUAL MODEL Richard Walker 13 January, 2011.
Acceptance criteria, Materials, Methods and Techniques for cooling plant construction DCP WP4 status 3 March 2010.
B. Neidhart, W. Wegscheider (Eds.): Quality in Chemical Measurements © Springer-Verlag Berlin Heidelberg 2000 P. RadvilaConcepts of Quality Management.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
Metadata Models in Survey Computing Some Results of MetaNet – WG 2 METIS 2004, Geneva W. Grossmann University of Vienna.
MANAGING YOUR LITERATURE CRITICALLY “ A self-reflection on doing research” Dr. Norhalimah Idris D06 – – /013 –
Control Chart Methodology for Evaluating CEMS Data
1 CTC 450 Review Water Processes. 2 Objectives Understand the basics with respect to operation of waterworks.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
4.3 Document control 4.4 Review of requests, tenders and contracts
East Area Upgrade Requirements from ALICE A.Tauro.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Task Force 3: Electrolyte leakage Last update- 01/06/
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Three basic areas for consideration: 1.Searching, reading and critically evaluating your literature. 2.Managing your literature – organizing and documenting.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Workshop on Cryogenic Applications of Sensors based on Optical Fiber Technology March 3 rd 2011 R&D on RH PH/DT - Paolo Petagna 1/9 PH-DT Status.
Results of WP 4: Implementation, experimentation of teacher training actions Open University of Catalonia - From November 4th to December 19th.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Task Force 3: Electrolyte leakage Last update- 19/03/
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Review of R&D Work Packages- July 4 th 2009 WP 11: Detector Cooling - Paolo Petagna 1/11 PH-DT - PH R&D WP 11: DETECTOR COOLING - Outline of Projects and.
Requirements Engineering Requirements Validation and Management Lecture-24.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
Olivier Callot 5 June 2007 Electronic Logbooks Why moving away from Atlog ? Proposed improved configuration Release schedule.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
3 June 09P. Tropea1 Cooling system acceptance Define a common set of acceptance criteria for cooling system commissioning Write the testing procedures.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
Failure Modes, Effects and Criticality Analysis
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
COMM02 Project Monitoring and Control Unit 8
M. Battistin CERN EN/CV/DC 9th July 2009
Lecture 4: Approaches to Data Collection
Overview & baseline of LS2 and roadmap for CRG
Do’s and Don'ts of SF6Gas Handling
RESEARCH TOOLS FOR UNDERSTANDING SPORTS CONSUMERS
Note: Text displayed in blue italics is included to provide guidance to the author and should be deleted or hidden before publishing the document.
Managing Site Disturbance
Preparing Bachelor Project…
TTA Activities on IMT-Advanced standardization
Project Auditing & Termination
Presentation transcript:

DETECTOR COOLING PROJECT Preliminary Plan for WP#1 P. Petagna – June 17 th 2009

PROPOSED WORKPLAN: 1 - Applicable methods for leak detection and finding (Definition / Standardization) 1.1 Pressure drop 1.2 Sniffers 1.3 Endoscopes 1.4 “Exotics”? (e.g or ) 2 - From “Leak Rate” to “Fluid Loss” ( Definition / Standardization) 2.1 Systematic analysis and classification of existing literature on the subject 2.2 Design of a test bench and execution of ad-hoc tests on calibrated leaks on particular configurations of interest 3 - Understanding “in situ leak repair” 3.1 Applicability of “standard” repairs to “accessible leaks” (i.e. outside detector) 3.2 Prosecution of the RAL analysis of existing methodologies of “inaccessible” leak repair 3.3 Deep understanding of chemical implications of the different techniques (fluid compatibility, radiation hardness, process control, risk of clogging, needs for subsequent cleaning…) 4 - Tests 4.1 Construction of a test bench (real-scale mock-up of typical non accessible circuits) and execution of ad- hoc tests on calibrated leaks for the technique(s) possibly selected. WP1 –On-site leak search and repair

BEST GUESS SCHEDULE: 1 - Applicable methods for leak detection and finding (Definition / Standardization) Mainly collecting and organizing information, plus competing the existing one: up to September (except for potential “exotic” techniques) 2 - From “Leak Rate” to “Fluid Loss” ( Definition / Standardization) Literature analysis to be completed but a lot of information already collected The preparation of a test bench can start in late-August in PH/DT, 2-3 months for systematic execution of tests 3 - Understanding “in situ leak repair” Waiting for documentation from Jason Tarrant (promised for this week): difficult to plan without it. 4 - Tests Probably meaningful start beginning of WP1 –On-site leak search and repair

RESOURCES: 1 Technician available from PH/DT as from end-August Part-time activity for “Eng-Staff 2” in PH/DT + P. Petagna Help and support from “gas” section agreed If needed, injection of some time from one PH/DT fellow Collaboration with TE and Napoli (+ RAL if still available) WEAKNESS: Unknown decision of M. Tavlet about his future position WP1 –On-site leak search and repair