Beam induced RF heating Benoit Salvant, with the invaluable input and help of many colleagues: Collimation team: Oliver Aberle, Ralph Assmann, Roderik.

Slides:



Advertisements
Similar presentations
ENEN RF-induced heating on TCTP ferrite: comparison between different support materials F. Carra, A. Bertarelli, A. Dallocchio, M. Garlasche’,
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Outcome of yesterday’s brainstorming on the potential of using CALIFES or CTF3 electron beam for impedance studies Elias Métral, Benoit Salvant, Carlo.
RF contact non conformities in LHC interconnects: Impedance aspects N. Mounet, B. Salvant With the help of: Gianluigi Arduini, Vincent Baglin, Serge Claudet,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
2012 activities of the ICE impedance working group and plans for
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
LTEX report at LMC: Status of impedance studies of the LHC forward detectors planned to be upgraded during LS1 (in particular ALFA and TOTEM) Olav Berrig.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Beam induced heating Benoit Salvant, with the invaluable input and help of many colleagues: Collimation team: Oliver Aberle, Ralph Assmann, Roderik Bruce,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
News and hot topics Impedance meeting 14/04/2014.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Impedance Working Group Update ICE meeting June 12 th 2013.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
General – mode matching for transverse impedance being compared with CST and infinitely long pipes (Nicolo) – Carlo found a way to disentangle direct space.
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Heat loads due to impedance: update and required upgrades
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
Long Shutdown for the LHC: Vacuum Beam Pipes
Longitudinal beam parameters and stability
Friday 15th June 01:11 Injection.
Electron cloud & vacuum pressure observations: 2011 proton run
Impedance working group update
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
MKI Operational Experience and Future Plans
Status from the collimator impedance MD in the LHC
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
Collimation margins and *
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Impedance working group update 07th August 2013
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Another Immortal Fill….
Update of the heating of ALFA detector in 2011
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

Beam induced RF heating Benoit Salvant, with the invaluable input and help of many colleagues: Collimation team: Oliver Aberle, Ralph Assmann, Roderik Bruce, Alessandro Bertarelli, Federico Carra, Marco Garlasche, Luca Gentini, Luisella Lari, Stefano Redaelli, Belen Salvachua, Marc Timmins, Cryogenics team: Serge Claudet, Laurent Tavian and Cryo operators Experiments: Mario Deile, Sune Jakobsen Injection team: Chiara Bracco, Mike Barnes, Wolfgang Bartmann, Brennan Goddard, Volker Mertens, Jan Uythoven RF team: Philippe Baudrenghien, Themistoklis Mastoridis, Juan Esteban Mueller, Elena Shaposhnikova Impedance team: Gianluigi Arduini, Olav Berrig, Fritz Caspers, Hugo Day, Alexey Grudiev, Oleksiy Kononenko, Elias Métral, Nicolas Mounet, Jean-Luc Nougaret, Serena Persichelli, Giovanni Rumolo Instrumentation team: Enrico Bravin, Rhodri Jones, Mariusz Sapinski, Andriy Nosych, Federico Roncarolo LHC Operators and operation team MPP team: Rudiger Schmidt, Jorg Wenninger, Daniel Wollman, Markus Zerlauth Vacuum team: Vincent Baglin, Giuseppe Bregliozzi, Alexis Vidal, Giulia Lanza, Bernard Henrist, Gregory Cattenoz And the TIMBER team! 1

Main messages of this talk Heating continued to be an issue in 2012 on many LHC devices, and significantly affected operation. Heavy upgrades are planned on most affected hardware during LS1. It is not clear that the upgrade foreseen for the TDI will be enough to be safe until the new design comes in LS2. Choice of parameters after LS1 from heating point of view: – The longer the bunches the better – The longitudinal distribution plays a very important role for some devices, and it should be kept under tight control (in particular during the ramp) – 25 ns or 50 ns bunch spacing is expected to be similar for most equipment with currently planned parameters. However, we need to watch for surprises. More temperature monitoring is needed on critical devices. 2

Agenda RF heating? Status at Chamonix 2012 Observations and limitations during the 2012 run Expectations for after LS1 Summary 3

Beam induced RF heating? 4  Example of temperature increase for kicker, collimator, detector during 4 LHC fills in mid Nov 2012  Temperature increase believed to be due to the interaction of beam induced wake fields with the surrounding  also referred to as “RF heating”  Temperature increase in LHC devices can cause several issues (damage, delays, dumps)  Other sources of heating of beam surrounding : synchrotron light, beam losses, electron cloud (not addressed during this talk) Intensity Temp TCPB6L7 Temp tube MKI8C Energy Temp MKI8C Temp ALFA

Agenda RF heating? Status at Chamonix 2012 Observations and limitations during the 2012 run Expectations for after LS1 Summary 5

Status at Chamonix 2012 Topic followed-up since first observed limitations in 2011 – Mini-Chamonix June 2011 (Jan Uythoven) – Evian December 2011 (Benoit Salvant) – Chamonix February 2012 (Elias Métral) – C-MAC August 2012 (Elias Métral) – LMC148September 2012 (Benoit Salvant) – LMC152October 2012 (Elena Shaposhnikova  RF manipulations to reduce heating) – LMC155 October 2012 (Benoit Salvant) – LMC159 and TE/TMDecember 2012 (Elias Métral  conclusions of RF fingers task force) Conclusions from Chamonix 2012 (Elias Métral) and 2012 observations 6 equipmentProblem VMTSADamagereplaced TDIDamageStill problems even if in parking position MKIDelayMKI8D (MKI8C after TS3) TCP_B6L7_B1Few dumpsInterlock increased TCTVBFew dumpsInterlock increased Beam screen Q6R5Regulation at the limitSince TS3, correlation with TOTEM? ALFARisk of damageDue to Intensity increase BSRTDeformation suspecteddamage It did not really get better in 2012…

Status at Chamonix 2012 Topic followed-up since first observed limitations in 2011 – Mini-Chamonix June 2011 (Jan Uythoven) – Evian December 2011 (Benoit Salvant) – Chamonix February 2012 (Elias Métral) – C-MAC August 2012 (Elias Métral) – LMC148September 2012 (Benoit Salvant) – LMC152October 2012 (Elena Shaposhnikova  RF manipulations to reduce heating) – LMC155 October 2012 (Benoit Salvant) – LMC159 and TE/TMDecember 2012 (Elias Métral  conclusions of RF fingers task force) Conclusions from Chamonix 2012 (Elias Métral) and 2012 observations 7 equipmentProblem VMTSADamagereplaced TDIDamageStill problems even if in parking position MKIDelayMKI8D (MKI8C after TS3) TCP_B6L7_B1Few dumpsInterlock increased TCTVBFew dumpsInterlock increased Beam screen Q6R5Regulation at the limitSince TS3, correlation with TOTEM? ALFARisk of damageDue to Intensity increase BSRTDeformation suspecteddamage It did not really get better in 2012…

Agenda RF heating? Conclusions from Chamonix 2012 Observations and limitations during the 2012 run – VMTSA – TDI – MKI – TCP.B6L7 – ALFA – Q6R5 – BSRT – TCTVB Expectations for after LS1 Summary 8

Double-bellow module VMTSA 8 bellows (out of 20) were found damaged in November and December Hard work of TE/VSC and the LRFF working group mandated since then to understand issues with LHC RF fingers:  Simulations and measurements showed that there is no problem if good contact is ensured  consolidation of the design to avoid bad contacts  8 modules reinstalled with new shorter RF fingers, ferrite plates and reinforcement corset  no problem since then (both on vacuum gauges and temperature) Plans for LS1: remove all these modules and identify others that could fail 9 Courtesy: Bernard Henrist TE/VSCCourtesy: Vincent BaglinTE/VSC (LMC 16/11/2011) Damaged module Reinforced corseted fingers installed in 2012 Old fingers Believed to be solved

Agenda RF heating? Conclusions from Chamonix 2012 Observations and limitations during the 2012 run – VMTSA – TDI – MKI – TCP.B6L7 – ALFA – Q6R5 – BSRT – TCTVB Expectations for after LS1 Summary 10

Injection protection collimator TDI (status Feb 2012) The 2 TDI beam screens were found damaged by EN/STI, TE/VSC and BE/ABP after the 2011 run. Temperature, vacuum, jaw deformation during the run suggested significant heating as the TDIs were not retracted to parking position Electromagnetic simulations by BE/ABP, BE/RF and EN/MME confirm that the heating can be significant. It is however not completely clear that beam induced heating alone generated the damage. Both TDIs were left in that state and a reinforced spare was prepared by EN/STI. A temperature probe was planned to be installed to monitor the temperature of the beam screen but it was decided to remove it after a problem during the bake-out. 11 TDI jaw Deformation of the beam screen A. Grudiev, M. Timmins

Pressure observations at TDI during 2011 and May 2012 November 2012 Overview of Pressure at TDI.4L2 Pressure at TDI.4R8 August 2011 No heating Heating came back on TDI.4L2? (situation since mid-August 2012) Strong heating on both TDIs suspected (before TDI at +/-55 mm in physics)

Injection protection collimator TDI (status Dec 2012) Suspicious pressure curves could indicate that additional heating occurs in or close to the TDI4L2 since mid Many mechanical issues on both TDIs towards the end of the 2012 run (see talk of Chiara Bracco): did the RF heating make things worse? Current plans for LS1: reinforce beam screen (TDI design meetings). Will that be enough in view of the recent problems? 13 Parking position in 2011 (+/- 20 mm)  90 W Parking position in 2012 (+/- 55 mm)  30 W N. Mounet Resistive wall contribution for the TDI vs gap This contribution could be strongly reduced (<1W) by a thin copper coating.  feasible? Potential actions to be discussed with all stakeholders

Agenda RF heating? Conclusions from Chamonix 2012 Observations and limitations during the 2012 run – VMTSA – TDI – MKI – TCP.B6L7 – ALFA – Q6R5 – BSRT – TCTVB Expectations for after LS1 Summary 14

Injection kicker MKI MKI regularly delays injection after a dump by up to a few hours (most critical was MKI8D and from TS3 onwards, MKI8C). EM simulations and measurements and thermal simulations are consistent with observations (despite the very high complexity of the device). Extensive studies within the MKI strategy meetings to: – Reduce the electric field on screen conductors (P. Adraktas, M. Barnes) – Reduce the longitudinal impedance  yielded new design of the screen conductors (M. Barnes, H. Day et al) – Improve heat radiation from the ferrite  increase tank emissivity (M. Barnes, M. Garlasche et al) The removal of selected bake-out jackets reduced measured magnet temperature by resp. 3 deg C to 7 deg C on MKI8B and MKI8D. The jackets on MKI2B and MKI2D were removed on 11 Sept. However it is preferred, in the future, to keep the bake-out jackets ON the tanks. 15 Bake-out jacket Courtesy: Mike Barnes TE/ABT H. Day

Injection kicker MKI8D Bench measurements and simulations predict that the new MKI design (19 conductors) would better screen the ferrite from the beam than the current MKI design (15 conductors) (M. Barnes, H. Day et al) During TS3, the MKI8D was replaced with a spare with 19 screen conductors, 16 TS3  Clear improvement for the replaced kicker with more screen conductors  Promising for the upgrade of all MKIs in LS1. H. Day 15 conductors 19 conductors

Injection kicker MKI8C However, after this same TS3, it was realized that MKI8C was limiting, and it was traced to a large temperature on the tube (up to 180 degrees). Analysis of kicker rise time and delay shows that the kicker performance is not observed to be affected by the increase of temperature on the probes (M. Barnes). A plausible hypothesis is that the additional source of heating is not the magnet ferrites but lies next to the “tube Up” probe.  the interlock level for that magnet was increased accordingly, and the limit was increased We’ll look for anomalies when opening MKI8C in LS1. 17 MKI8C tube MKI8B tube MKI8B magnet MKI8C magnet PT100 Tube_Up PT100 Mag_Up

Injection kicker MKI: plans for LS1 Follow-up closely by the MKI Strategy meeting All MKIs are planned to be upgraded and the beam impedance measured during LS1, aiming at – reducing the longitudinal impedance by improving the screening of the ferrite from the beam  aim at 24 screen conductors (instead of 15 or 19 screen conductors)  reducing the high electric field of the screen conductors (tests planned early January to confirm promising results from simulations (M. Barnes))  Impedance bench measurements on a smaller scale setup planned early January to confirm promising results from simulations (H. Day) – Improving the radiation of heat  by increasing the emissivity of the tank (tests of a prototype on-going)  active cooling with fluid very difficult to envisage due to high voltage operation. – reducing the likelihood of a spark from the beam screen conductors – suppressing the anomalous heating presently exhibited by MKI8C 18 New design for 24 screen conductors (H. Day and M. Barnes) Many actions taken for after LS1, and promising

Agenda RF heating? Conclusions from Chamonix 2012 Observations and limitations during the 2012 run – VMTSA – TDI – MKI – TCP.B6L7 – ALFA – Q6R5 – BSRT – TCTVB Expectations for after LS1 Summary 19

Primary skew collimator TCP.B6L7.B1 TCP.B6L7.B1 caused dumps in 2011 and 2012, and the steady increase of its jaws’ temperature during physics fills with increasing intensity required increasing the interlock to 95 degrees. The temperature of all other primaries (including its symmetric for B2) increases only by 1 degree. Joint analysis of heat deposition and measured temperatures by EN/MME and BE/ABP points to an absence of efficient cooling (suspected non-conformity). Beam induced heating clearly observed but heating also due to losses Nothing wrong was seen with visual and X-ray inspections by EN/STI and EN/MME on both cooling systems and RF fingers. Plans for LS1: thorough check of the cooling system (EN/STI and Collimation WG). 20 Temp TCP.B6L7 Bunch length Energy Intensity TCP.B6L7 gap Kinks due to losses Non conformity of cooling should be solved

ALFA roman pot The ALFA detectors’ temperature reached 42 degrees and bordering the range that is expected to lead to detector damage (45 degrees). Joint studies by BE/ABP and ATLAS-ALFA showed that the temperature increase is consistent with impedance heating of the ferrite damper ring (which is efficiently preventing more harmful heating). The TOTEM detector does not have this problem as it was designed with active cooling of the detector. As emergency measures, the ALFA team removed the bake-out jackets and added some fans. Plans: implement a new design with reduced impedance and active cooling during LS1. 21 Courtesy: S. Jakobsen (ALFA) fans Significant refurbishment planned

Beam screen temperature regulation Until TS3, standalone Q6R5 had no margin for more cooling. This could have been an issue for 7 TeV operation. Tests were performed (Xrays on both bellows and cooling circuit) and so far nothing special was seen that could explain the singularity of Q6R5. Since September 2011 (TS3), the situation improved significantly. Only a few fills have been affected since then, in particular the fills following a movement of the neighboring TOTEM roman pot, indicating a possible correlation (through vacuum or losses or both). This is under study with the TOTEM, TE/VSC and TE/CRG teams. During LS1 the valves for standalones will be replaced to allow a higher cooling flux. 22 May 2012, almost every fill required large regulation of Q6R5 November 2012 almost no fill affected Valve opening of Q6R5 regulation Pressure in 6R5 TOTEM movement Need for more cooling On the following fill

BSRT The B2 BSRT mirror and support suffered from damage that could be due to significant heating. Simulation studies have been underway since June. Combined effort between BE-BI, BE- ABP, BE-RF and EN-MME to understand the heat deposition and to assess whether the Curie temperature of the ferrite has been reached.  Still no clear conclusion, need to check impedance simulations with bench measurements in January Temperature is measured from outside  Need for temperature monitoring closer to the arm and the ferrite (planned to be installed during this Christmas stop). Would be useful to check high intensity 50 ns planned before LS1 Heavy effort required and planned during LS1 to find a robust design. 23 Beam intensity B1 Temperature bellow BSRT B1 BSRT B1 IN BSRT B1 OUT Much less heating in the out position (ΔT is divided by 3) BSRT heating increases with smaller bunch length Bunch length B1 B2 Temp BSRT B1 Temp BSRT B2 Bunch length B2 Temp BSRT B2 New design planned

2- beam Tertiary collimators TCTVB.4R8 and 4L8 Despite active cooling, TCTVBs in IR8 consistently heat by around 10 degrees Already mentioned at mini-Chamonix but the worst TCTVB was taken out in 2011 beam dump by TCTVB.4L8 temperature when longitudinal blow up stopped working on May 30 th  Worry if bunch length is reduced in physics, but should be replaced by TCTPs after LS ns 0.85 ns Removed

Agenda RF heating? Conclusions from Chamonix 2012 Observations and limitations during the 2012 run Expectations for after LS1 – Beam parameters – Elements planned to be installed in LS1 Summary 25

What lies ahead of us? After LS1:  current situation (50 ns) at 6.5 TeV  or nominal beam at 6.5 TeV: Larger total beam intensity (25 ns spacing) Smaller bunch intensity p/b  bunch length ?  current ? (1.2 to 1.3 ns)  Nominal ? (1ns) Effect of 25 ns and bunch length on RF heating? 26

Computing power loss 27 Power lost by the beam in a device of impedance Z long (see E. Métral at Chamonix 2012): M=2808 bunches N b = p/b Impedance Re(Z long ) of TCP in physics Power spectrum measured on 50 ns by P. Baudrenghien and T. Mastoridis broadband Narrow band at f res

Power lost by the beam in a device of impedance Z long (see E. Metral at Chamonix 2012): Assumptions: same bunch length and same bunch distribution for 50 and 25 ns spacing  same beam spectrum but with half of the peaks Effect of 25 ns on RF heating? 28 M=2808 bunches N b = p/b Impedance Re(Z long ) broadband Narrow band at f res

Power lost by the beam in a device of impedance Z long (see E. Metral at Chamonix 2012): Assumption: same bunch distribution for 25 ns and 50 ns  beam spectrum is extended to higher frequencies with an “homothetic” envelope Effect of bunch length on RF heating? 29 M=2808 bunches N b = p/b Impedance Re(Z long )  switching to lower bunch length for broadband: in general regularly increases (depends on broadband resonant frequency) broadband Narrow band at f res  switching to lower bunch length for narrow band: enhances some resonances, damps others, excites higher frequency resonances σ=1.25 ns σ=1 ns From the heating point of view, the longer the bunch the better in most cases.

Available data to predict situation after LS1? Fills with stronger heating on B2 on ALFA and BSRT (Oct 26 th to Oct 28 th ) Results from OP test on bunch length reduction (Nov 29 th ) Results from MD on flattening bunches (Nov 29 th ) – Need more time for the analysis, very promising method to reduce heating Results from scrubbing (December) – Need to disentangle heating from electron cloud and from impedance 30

Strong changes of beam spectra at flat top from fill to fill: - High frequencies were much worse for B2 on Oct 27 th than after - This difference is believed to be due to the different action of the longitudinal blow up during the ramp on B1 and B2 - significant increase of temperature on BSRT too Fills with stronger heating on B2 (Oct 26 th to Oct 28 th ) ALFA temperature Temp ALFA B2 Temp ALFA B1

Fills with stronger heating on B2 (Oct 26 th to Oct 29 th ) 32 Preliminary power loss computed from spectra and simulated impedance of ALFA along the fills ramp Top energy Around 10 W more on B2 than B1 at top energy (+40% power loss on ALFA B2) B1 and B2 are similar It is critical to control the beam spectrum!

Results from the bunch shortening test 33 injection Simulations of power loss from the spectra measured during the test for ALFA, MKI and BSRT (measured) - injection Example of a measurement: Measurement of average temperature of all arcs during the test Measured bunch length Measured arc temperature The test confirmed that shorter bunch length increases heating for most monitored devices We stayed 1h between 1 ns and 1.1 ns with 1380 bunches at p/b without major issue

Bunch length test summary equipmentHeating increases with lower bunch length? Difference with a regular fill with ramp (3318)? BSRTYes (slightly )Similar TCTVBYesHeated more TCP.B6L7No (long time constants)Heated less MKIs (other than MKI8C) No (long time constants)Similar MKI8CDifficult to seeHeated more ALFAYesHeated more TDI pressure and deformation Difficult to seeSeemed to be larger for TDI2 Arcs temperatureYesSimilar Q6R5No (but saturated)Heated less, indication that it may not be an RF heating issue  Very different patterns with bunch length, helps to understand the origin of the heating  The items that heated more are planned to be upgraded (ALFA, MKI8C, TDI, BSRT) or removed (TCTVB)  No hard showstopper unveiled by this test to run at lower bunch length

Elements planned to be installed in LS1 Tertiary collimators replaced by new design with BPMs (issues with ferrites) Secondary collimators in IR6 replaced by new design with BPMs Smaller radius for experimental beam pipes new LHCb VELO (LS2) New forward detectors around ATLAS and CMS (AFP and HPS) Modifications in view of installation of the forward detectors in 2015 Improved roman pots (both ALFA and TOTEM) Improved BSRT, TDI, MKI, TCP.B6L7. UA9? Recall of general guidelines to minimize power loss – need for efficient cooling of near-beam equipment to avoid what has happened to TDI, BSRT and ALFA (from F. Ruggiero, L. Vos) – Maximize evacuation of heat (optimize emissivity, thermal conduction) – Need to ensure good RF contact to avoid what happened to VMTSA (LLRF WG guidelines) – Use high Curie temperature ferrites whenever possible (e.g. Transtech TT2-111R, but beware of vacuum compatibility) – Need for more monitoring of temperature inside critical equipment (e.g.: TDI, BSRT, TOTEM pot) 35

Agenda RF heating? Conclusions from Chamonix 2012 Observations and limitations during the 2012 run Expectations for after LS1 Summary 36

Summary Many devices are heating at a faster rate following the bunch intensity ramp-up Actions are/should be planned to be taken in LS1 to prepare safe and smooth running: – Efficient cooling for all near beam equipments (in particular BSRT, TDI, ALFA) – Consolidation of RF contacts (see conclusion of LRFF working group) – Analysis of suspected non-conformities (TCPB6L7, MKI8C, Q6R5 and TOTEM) – Systematic analysis of available pressure and temperature stored to detect other issues – Installation of more temperature monitoring of critical equipment – Control the longitudinal beam distribution and (if possible) optimize it to reduce heating Since most heating devices have a dominating broadband impedance, the operation with 25 ns is expected to lead to slightly larger power loss (for the same bunch length, bunch distribution and nominal bunch intensity) TDI and maybe BSRTs which also exhibit large narrow band impedance should be monitored closely. Other devices might start suddenly heating much more if the distribution changes. From heating point of view, the main worries for after LS1 seems to be: The extent of the upgrade of the TDI the operation with nominal bunch length (~1 ns, compared to ~ ns) Uncontrolled longitudinal beam distribution during the ramp 37

Summary table 38 equipmentProblem Hopes after LS1 VMTSADamagereplacedremoved TDIDamageBeam screen reinforced, and? MKIDelay(+ MKI8C high temperatures) Beam screen and tank emissivity upgrade TCP_B6L7_B1Few dumpsInterlock increasedCooling system checked TCTVBFew dumpsInterlock increasedremoved Beam screen Q6R5 Regulation at the limitSince TS3, correlation with TOTEM? Upgrade of the valves + TOTEM check ALFARisk of damageDue to Intensity increase New design + cooling BSRTDeformation suspected New design + cooling LS1 will be busy!

Thank you for your attention! 39

40

Summary so far 41 CoolingHas limited operation?Type of impedance Current estimated power loss 50 ns (1.2 ns – 1.6e11p) power loss with 25 ns (1.2 ns e11p) power loss with 25 ns (1 ns -1.15e11p) VMTSAnoNo, repaired.narrow band (before repair) ~ 0 if good contacts (>100 W if bad contacts) ~ 0 if good contacts Will be removed TDInoNo, in parking position after injection Broadband + narrow band 40 W (only broadband) 40 W (only broadband) 50 W (only broadband) MKINoYes, regularly delays programmed dumps and next injection by a few hours Broadband100 W (15 cond.)130 W (15 cond.) 210 W (15 cond) 70 W (19 ciond) 40 W (24 cond) TCP_B6L7Yes (water) Yes, 2 dumps interlock increased from 55 to 95 degrees Broadband50 W 80 W TCTVBYes water No (dump with shorter bunch length) narrowbandTo be assessed Will be removed Beam screen yes (cryo) No, except Q6R5 for 7TeVBroadband (if no non conformity) 0.1 W/m 0.13 W /m No margin for cooling of current Q6R5 ALFAnoNot yet (18deg increase in temperature in 2011, with margin of 40 degrees) Broadband20 W23 W~ 30 W BSRT Mirror and support noYes, mirror coating is damaged and the mirror support lost its mechanical properties Broadband (if below Curie temperature) 10 to 50 W if below Curie temperature (> 500 W above) 10 to 50 W (or > 500 W) To be estimated Computations with code of N. Mounet and CST/HFSS simulations data with H. Day, A. Grudiev, O. Kononenko, A. Nosych