Enabling Grids for E-sciencE EGEE-III INFSO-RI-222667 NA1 EGI Task Transition All Activity Meeting – January 2009.

Slides:



Advertisements
Similar presentations
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
Advertisements

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 Tools & Services Owen Appleton, NA2 Deputy Manager EGEE/EGEE-II Transition meeting.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGI – the next evolutionary step in Grid infrastructures Luděk Matyska CESNET Czech Republic
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
EGI Status and Outlook Pre-GDB May 12 th, 2009 Jürgen Knobloch, CERN EGI_DS Technical Director 2-Mar-091 J. Knobloch - Pre-GDB 12-May-2009.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Related Projects Dieter Kranzlmüller Deputy.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
Overview & Status of the Middleware & EGI Core Proposals Steven Newhouse Interim EGI Director EGEE Technical Director 26/05/2016 Status of EGI & Middleware.
EGEE-II / EGEE-III Transition Meeting 6-7 May 2008 EGEE-III INFSO-RI Enabling Grids for E-sciencE Registration procedure, Computer.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ?? Athens, May 5-6th 2009 Community Support.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE 3 rd All-Activity Meeting Introduction and NA1 status Bob Jones – Project Director,
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
European Grid Initiative – EGI Business and Technology Transfer for EGI EGI Design Study Project EGEE’09 Barcelona September 2009.
Enabling Grids for E-sciencE 1 EGEE III Project Prof.dr. Doina Banciu ICI Bucharest GRID activities in RoGrid Consortium.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse Technical Director CERN.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Presentation of templates and supporting documents Anna Cook EGEE-II / EGEE II Transition.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE’09 SSC Workshop SAFE Project Proposal.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Proposal Draft Summary of activity.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Fergusson, Emidio Giorgio, Gergely.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Business SSC for EGI SSC Workshop: Preparing.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Gergely Sipos Activity Deputy Manager MTA.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
INFSO-RI Enabling Grids for E-sciencE Severine Bergerot EGEE-2: Period 1 reporting instructions.
User Community Transition from EGEE to EGI 17 Dec 2008 – Orsay, France The Proposed EGI Model Diana Cresti, INFN
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks C. Loomis (CNRS/LAL) SSC Workshop Orsay,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 02.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 28.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
Enabling Grids for E-sciencE EGEE-III INFSO-RI The Life Sciences SSC V. Breton on behalf of EGEE-III Biomed cluster.
Enabling Grids for E-sciencE INFSO-RI Bob Jones, EGEE Project Office Retreat 1 EGEE-II Status - RPLO Members: Roberta (coord) 30%, Florida 12%,
European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)
4 May 2009SSC Workshop, Athens1 User Community Services, SSCs, NGI International Tasks 04 May 2009 EGEE/EGI SSC Workshop – Athens, Greece Diana Cresti,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks User Support for Distributed Computing Infrastructures.
European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE: Enabling grids for E-Science Bob Jones.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks F. Castejón Asociación Euratom/CIEMAT para.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Plans for PY2 Steven Newhouse Project Director, EGI.eu 30/05/2011 Future.
Representation of European Grid efforts, international cooperation, and ESFRI EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Astrophysical Cluster Session Claudio Vuerli,
EGI-InSPIRE EGI-InSPIRE RI The European Grid Infrastructure Steven Newhouse Director, EGI.eu Project Director, EGI-InSPIRE 29/06/2016CoreGrid.
EGI InSPIRE Report to the EGI Council Steven Newhouse On behalf of the Editorial Board.
Ian Bird LCG Project Leader Summary of EGI workshop.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Xavier Jeannin (CNRS/UREC) All Hands meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE NA4 SSC Workshop A&A SSC Proposal C.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operational Tools Advisory Group - Transition.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Country Reports AAM Brussels.
NA5: Policy and International Cooperation
A. Candiello, D. Cresti, T. Ferrari1, F. Karagiannis, D
Tiziana Ferrari, INFN CNAF CNAF, Febbraio 2009
Diana Cresti, INFN User Community Services in the European Grid Infrastructure 29 Jan 2009 – Paris, France Diana Cresti, INFN
Hannelore Hammerle NA2 F2F meeting, Manchester 8 May 2007
Preparing for EGEE-III
Connecting the European Grid Infrastructure to Research Communities
Presentation transcript:

Enabling Grids for E-sciencE EGEE-III INFSO-RI NA1 EGI Task Transition All Activity Meeting – January 2009

Enabling Grids for E-sciencE EGEE-III INFSO-RI Declared Resources Director Assistant to the Director CTO (Middleware) COO (Operations) CAO (Admin) UCO (Users) –Not in the original functions document but in D5.4 claimed to be coming from the management structure Admin staff (x2) Secretaries (x2) Legal Expert Taken from Page 108 of EGI_DS_D31

Enabling Grids for E-sciencE EGEE-III INFSO-RI Project Office In EGI: –The Director and assistant in EGI.org Interfaces: –Governing Groups: Council, EU Commission Project Officer –Advisory Groups: UFSC, MCB –Heads of the 4 main units Rights: –Responsive and clear policy decisions from Governing groups –Clear advice from Advisory groups Responsibilities: –External representation of EGI.org on other bodies –Leadership & management of EGI.org staff Resources: –60PM  48 (Director, Assistant) Assumptions: Unknowns: –Reporting details required internally & externally for EGI.org staff

Enabling Grids for E-sciencE EGEE-III INFSO-RI Project & Consortium Management In EGI: –CAO + Admin unit in EGI.org Interfaces: –Director Rights: –Timely financial information from partners Responsibilities: –Deliver budget & organisational information to Director Resources: –36PM  72PM (CAO + 2 Admin) –Dedicated legal staff in EGI Assumptions: –JRUs must be established as legal structures to be NGIs  Need to be acceptable to EC as FP7 project partners Unknowns –Timeline for establishment of NGIs as legal bodies not clear (summer’09) –What responsibility for EGI as opposed to just EGI.org

Enabling Grids for E-sciencE EGEE-III INFSO-RI Technical Management In EGI: –This is the CTO in EGI.org Interfaces: –Director –Middleware unit staff for detailed specifications & software validation –Middleware consortia as external contractors –User community & operations for requirements & uptake Rights: –Clear inputs as to needs from other tasks that can then be prioritised Responsibilities: –Manage the specification and delivery of software suitable for deployment by NGIs Resources: –Management task. 24PM  24 PM Assumptions: –That there is an external funding/budget for middleware Unknowns: –Ability for all middleware unit staff to be co-located

Enabling Grids for E-sciencE EGEE-III INFSO-RI Quality Assurance In EGI: –No explicit QA activity across the EGI  (is implicit in tasks of operations and middleware) Interfaces: Rights: Responsibilities: Resources: Assumptions: Unknowns:

Enabling Grids for E-sciencE EGEE-III INFSO-RI Sustainability In EGI: –No explicit sustainability task (along EGEE lines) in EGI –Policy & External Liaison function (along NA5 lines) exists Interfaces: Rights: Responsibilities: Resources: Assumptions: Unknowns:

Enabling Grids for E-sciencE EGEE-III INFSO-RI Events & Meetings In EGI: –Event Organisation staff in EGI.org UCS Interfaces: –EGI UFSC & UCS Rights: –Timely event planning with OC & local organiser –Support work of PC and PC chair Responsibilities: –Support work of EGI UFSC and external UF meetings Resources: –12 PM in EGEE to part of 48 PM section in EGI.org Assumptions: Unknowns: –Size, location & frequency of UF events Glossary: UFSC: User Forum Steering Committee

Enabling Grids for E-sciencE EGEE-III INFSO-RI General Issues Unknowns: –The ability to have staff in place during the transition and on start up of EGI –Collaborative tools (document archive [EDMS], meetings [InDiCo], etc.) –If EGI.org and NGIs are involved in EC projects then the equivalent of PPT will be required