Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.

Slides:



Advertisements
Similar presentations
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
COUNTY OF LOS ANGELES FIRE DEPARTMENT FORESTRY DIVISION (323)
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
Sections 10 and 404: NMFS’ Oversight, Concerns and Actions
March 7, 2012 North Coast Corridor Program Overview Caltrans External Advisory Liaison April 16, 2013.
ENVIRONMENTAL COMMITMENT COMPLIANCE. Mark Schrader – FHWA –Law and Process Review Findings Bill Bicknell – USFWS –Field Review Examples Sheri Lares -
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
NCTD/SANDAG Project Update Capital Improvement Program Bill Prey, P.E., LOSSAN Corridor Director San Diego Association of Governments RELATED TO AGENDA.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Regional Industrial Wetlands / Wetlands Mitigation Solutions.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
Marine Corps Air Station Miramar
February 23–24, 2011 in San Diego, California. Focused on the following four border transportation themes:  Sustainability and Livability,  Green financing.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
SUSTAINABLE DEVELOPMENT: A Challenge for Engineers Ata M. Khan March 2002.
My World 3 Environmentally Friendly Drilling Systems Program A w a r d e d O c t o b e r 5,
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
Barbara Bramble National Wildlife Federation And Chair, Board of Directors RSB ABLC – 2014 – Washington DC Moving from Conflict and Controversy to Results:
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
Livable Delaware Energy Task Force - the Key to Energy and Environmental Co-Benefits.
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Levy Nuclear Plant Overview of Water Issues Presented by Jamie Hunter to the FDEP – Central District’s 13 th Annual Power Generation Conference Lake Buena.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Discussion-Draft Workshops November 16 th and 20 th, 2015.
Federal Funding Strategies Update Internal Working Document Update on Federal Funding California High-Speed Rail Authority In Partnership with: Kadesh.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION July 21, 2005.
Centre for Transport Studies Imperial College 1 Congestion Mitigation Strategies: Which Produces the Most Environmental Benefit and/or the Least Environmental.
Report On The Status Of The Remediation Of The Sonoma County Waste Tire Sites Board Meeting Agenda Item 4 February 18, 2004.
I-5 North Coast Corridor. I-5 North Coast Corridor FREQUENTLY ASKED QUESTIONS Are we “only” expanding the freeway? Why widen the freeway? Are we just.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
What is Green Globe? It is an international environmental certification program adapted for the tourism industry It sets precise environmental performance.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Federal Consistency Certification Sorrento Valley Double Track.
Click to edit Master title style March 2016 California Coastal Commission (Items W11a, W11b, and W10f)
Environmental Impact Reports
Draft Transportation Element September 6, 2017
Construction Management & Inspection
SEQRA as a Tool to Review Energy Projects
Unit 4: Northern & NW Europe
Mitigation.
Presentation transcript:

Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1

Sorrento To Miramar Double Track - Phase 1 2 Study Area Map Near Term Service Expansion (San Diego Rail Prioritization Report) recommended to provide double track configuration at this key choke point. Facilitate expanded service by 6 to 14 more trains per day by the year 2015, with most service expansion for peak-period COASTER operations and AM and mid-day Amtrak operations. Near Term Service Expansion (San Diego Rail Prioritization Report) recommended to provide double track configuration at this key choke point. Facilitate expanded service by 6 to 14 more trains per day by the year 2015, with most service expansion for peak-period COASTER operations and AM and mid-day Amtrak operations.

3 Sorrento To Miramar Double Track - Phase 1 Vegetation Map S taff at the California Coastal Commission, Army Corps of Engineers, Fish and Wildlife Service, and Regional Water Quality Control Board were consulted to confirm the apparent Least Environmentally Damaging Practicable Alternative.

4 Sorrento To Miramar Double Track - Phase 1 Vegetation Map

Sorrento To Miramar Double Track - Phase 1 Existing Carroll Canyon Creek Bridge (Br 249.9) View Looking West View Looking South

6 Sorrento To Miramar Double Track - Phase 1 Bridge Plan View

Sorrento To Miramar Double Track - Phase 1 Existing Hydrology at Br 249.9

Sorrento To Miramar Double Track - Phase 1 Project Hydrology at Br 249.9

Sorrento To Miramar Double Track - Phase 1 Project Impacts Coastal Wetlands Impacts to sensitive coastal wetlands are unavoidable. The Project minimizes wetlands impacts to the fullest extent practicable, and provides on-site and off-site mitigation for unavoidable impacts. Cultural Resources Impacts to the Native American Village Site of Ystagua are unavoidable. Undertaken an extensive cultural research investigation to document the extent of the resource and develop a treatment plan to fully address impacts to this important Native American Site. Worked very closely with Native American representatives at every step of this investigation to ensure that resources affected by this project are addressed respectfully and in a timely manner.

Sorrento To Miramar Double Track - Phase 1 Project Benefits Increased Rail Capacity Results In: Reduced traffic congestion, which promotes coastal access; Reduced vehicle miles traveled; Reduced water pollution and air pollution; Reduced energy consumption; and, Reduced greenhouse gas emissions.

Sorrento To Miramar Double Track - Phase 1 Balancing Protection of Coastal Resources The project’s benefits outweigh the fully mitigated impacts to Coastal Wetlands; Concurring with the consistency certification is most protective of coastal resources; and, The project is consistent with the Coastal Act. We respectfully ask for your concurrence with the consistently certification. We are available to answer questions. Thank you.

Sorrento To Miramar Double Track - Phase 1 QUESTIONS

13 Sorrento To Miramar Double Track - Phase 1 Alternative 1 – Vegetation Map