Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
Cavity Vertical Test and Diagnostics Kitty Liao Second Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
ESS cavities interfaces
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Longitudinal HOM damping estimations for SPL cavity. status W. Weingarten 26 July 20101SPL Cavity WG Meeting.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
Beam tube damping estimations for SPL cavity cont’d W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
Detail plan of S1-Global H. Hayano (KEK),
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
9-cell cavity coordination CM Ginsburg 15 Mar
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
CERN – Zanon discussions
Plans towards CC in the LHC a US – centric perspective
WP5 Elliptical cavities
Power Couplers, HOM Couplers and Tuners for the XFEL
Uppsala Commitment to ESS and FREIA Planning
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
WG-1 Session Cavity Performance Cryomodule Performance
Plans for a Superconducting Proton Linac at CERN
Second SPL Collaboration Meeting, Vancouver May 2009
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
ESS RF Development at Uppsala University
CW Operation of XFEL Modules
KEK injector cryomodule
HIE-LINAC status report
Test plan of ESS HB elliptical cavity
SNS-PPU upgrades the existing accelerator structure
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status of collaborations  Tasks and deliverables were identified  Work-packages, work package owners and planning being established Several work-packages are not yet distributed (next slide)  Collaboration partners identified – several approvals pending

Report Working Group “Cavity design and construction” 2 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Work-package owners still to be identified for  Manufacture of cavities (except for a few prototypes)  Design and manufacture of frequency tuner  Manufacture and test of HOM coupler  Inspection equipment for on-line and post mortem analysis: temperature mapping / detection of quench location by second sound delay / optical inspection equipment (Questar ® type)

Report Working Group “Cavity design and construction” 3 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009 Collaboration partners (some approvals pending) PartnerStatusItem Triumf/CanadaDraft agreement in circulation Construction and test of a  =0.65 cavity Triumf/CanadaPreliminary proposal in discussion Construction and test of all  =0.65 cavities for the SPL Stony Brook, BNL/USASubmitted to DOE, decision pending Construction and test of a  =1 cavity Stony Brook, BNL/USAPreliminary proposal in discussion. Pending rating from CERN. 50% of the SPL: 12 cryomodules of 8  = 1 cavities each FP7-EuCARD/European UnionApprovedEU contribution to WP 10 task 10.2 FP7-EuCARD/France-CEA-CNRS ApprovedCavity production and test at low and high power Rostock University/Germany Pending German grantHOM damper computation Darmstadt University/GermanyPending German grantEffect on beam of RF couplers

Report Working Group “Cavity design and construction” 4 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009 Progress on observations from 1 st SPL collaboration meeting #TopicStatus 12 Dec. 2008Status as of today 1Cavity Cavity design: choice between  = 0.92 or 1.0Decision taken in favour of  = 1.0 2Demonstrate gradient of 25 MV/m: Standard recipe to be applied; EP equipment to be built up at CERN and possibly elsewhere EP equipment for monocell cavity is being built at CERN 3Number of cavities to be built: At least eightditto 4Cold test of individual cavities at CERN: Vertical cryostat #3 in SM18 to be refurbished Prototype monocell cavity test under preparation 5Manufacturing capacities identified: BNL, TRIUMF, CEA-Saclay, ESS, Soltan To be confirmed 6HOMsRequired loaded Q of HOMs to be providedc.f. paper submitted to PAC09 7Cold tests of HOMs to be performed at CERN on regular cavityditto 8HOM absorber vs. HOM antenna coupler: Prepare cavity design with ports for antenna coupler ditto

Report Working Group “Cavity design and construction” 5 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009 Progress on observations from 1 st SPL collaboration meeting (cont’d) #TopicStatus 12 Dec. 2008Status as of today 9DiagnosticsOn line equipment: T-mapping or 2 nd sound quench location required: Task owner to be identified ditto 10Off line equipment: Optical inspection device required ditto 11CryomodulePower test : Refurbishment of SM18 bunker testplace (cryogenics, RF power) Financing requested in MTP 12Magnetic shielding: Design value: B ext < 1 mTComputer simulations have started 13Power couplerA modified version of the HIPPI power coupler at CEA Saclay shall be used; test results imminent Coupler was tested at 1 MW travelling wave condition, 50 Hz repetition rate and 2 ms pulse duration 14Test of BNL dual power coupler imminent 15 Frequency tuner A modified version of the HIPPI slow/fast tuner designed at CEA-Saclay shall be used; repetitive testing required ditto