The Montgomery County Conference Center and Hotel 5701 Marinelli Road, Rockville, MD.

Slides:



Advertisements
Similar presentations
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Advertisements

Rodrick A. Crousey April 18, 2007 GEORGE W. HAYS PK-8 CINCINNATI, OH Mechanical Focus Senior Thesis The Pennsylvania State University Architectural Engineering.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
The Hearst Tower 959 Eighth Avenue New York, NY
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
SENIOR THESIS PRESENTATION An Evaluation of Water-Side Economics & Emissions Sinai Hospital South Tower Vertical Expansion 2401 W. Belvedere Ave. | Baltimore,
SENIOR THESIS PRESENTATION
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
David Sivin – Mechanical Bellevue Ambulatory Care Pavilion AE 882 Senior Thesis Faculty Advisor: Dr. Jelena Srebric The Pennsylvania State University.
Brian Ault – Mechanical OptionSpring 2008 Senior ThesisBarshinger Life Science & Philosophy Ann & Richard Barshinger Life Science & Philosophy Building.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
Marriott Corporate Headquarters
QIAGEN Sciences Germantown, Maryland Joseph P. DiIenno Mechanical Option The Pennsylvania State University Architectural Engineering Senior Thesis – Spring.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Miller Children’s Hospital Pediatric Inpatient Addition Long Beach, CA.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Paul Roberts Senior Thesis 2010 Construction Management.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
The Florida State University Ringling Conservation Center Sarasota, Florida Linda Lewis Mechanical Option Spring 2005.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Mechanical EmphasisTimothy R. Nolan Baltimore, Maryland April 17, 2003 Consultant – Mr. Freihaut.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Julie Thorpe Howard Hughes Medical Institute’s Landscape Building Ashburn, Virginia Julie Thorpe Mechanical Emphasis Penn State Senior Thesis Architectural.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA Jayme Antolik Architectural.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Harley-Davidson Museum Milwaukee, WI. Jonathan Rumbaugh, BAE/MAE Mechanical Option Advisor: Dr. William Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Industrial Ammonia Heat Pumps - Harness Your Heat, Don’t Reject It! Sam Gladis Business Director – Industrial Heat Pumps.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
Harley-Davidson Museum
DuBois Regional Medical Center West Wing Addition
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
David Anderson Mechanical Option
Feasibility of Energy Recovery in Conjunction With The Application of A Redesigned Central Cooling And Heating Plant.
Grunenwald Science and Technology Building
Eastern Pennsylvania Laboratory Facility
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Feasibility of Ice Storage
THERMAL STORAGE FEASIBILITY STUDY
Senior Thesis Presentation
Presentation transcript:

The Montgomery County Conference Center and Hotel 5701 Marinelli Road, Rockville, MD

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Senior Thesis Presentations 2005

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Presentation Outline Building Overview Mechanical System Existing Conditions Mechanical System Redesign Goals / Analysis Central Chiller Plant Optimization Central Chiller Plant Optimization Electrical System Analysis Modification due to Mechanical Redesign Modification due to Mechanical Redesign Lighting System Analysis Decreasing Mechanical Cooling Load Decreasing Mechanical Cooling Load Construction Management Analysis S.I.P.S - Hotel S.I.P.S - HotelSummaryAcknowledgementsQuestions

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Building Overview Names: MCCCH or Bethesda North Marriott Hotel and Conference Center Location: Rockville, MD Size: 240,000 sq. ft. Owners: Montgomery County of Maryland and IRP/QDC White Flint Associates L.C.C. for Marriott International Architect: RTKL Associates MEP Engineers: Engineering Design Group

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Mechanical System Existing Conditions Airside: 11 AHUs (1,400-50,000 cfm) 11 AHUs (1,400-50,000 cfm) VAV w/ electric reheat in C.C. VAV w/ electric reheat in C.C. & Hotel Lobby VFC units in hotel guestrooms VFC units in hotel guestroomsWaterside: ton/5,000 MBH natural gas ton/5,000 MBH natural gas direct-fired abs. chillers/heaters gpm cooling towers gpm cooling towers 8 large end suction pumps 8 large end suction pumps

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Mechanical System Redesign Goals / Analysis Main area of improvement Absorption central chilling plant Absorption central chilling plant High yearly operating & L.C.C. Main mech. room layout / maintenance strategy Operation strategy Redesign Goals Optimize central chilling plant Optimize central chilling plant Reduce operating & L.C.C. Increase redundancy Improve mech. room layout / maintenance & operation strategies

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Chiller Plant Optimization Process Obtained accurate utility rates (gas & electric) Performed base case HAP 4.2 calculation (abs. plant) Compared base calculation to… Hybrid (gas abs. & elect. v.c.) simulations Hybrid (gas abs. & elect. v.c.) simulations An all electric, vapor compression plant simulation An all electric, vapor compression plant simulation Electric, vapor compression plant → optimum → L.C.C.=$1,805,054 Contacted chiller manufacturers: Carrier, McQuay, Trane, & York Ran additional HAP 4.2 simulations York → optimum w/ ton centrifugal→ L.C.C.=$1,738,472

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Cool Thermal Storage Analysis Reasons: further savings, increase redundancy, & independence from grid ASHRAE - daily partial storage, load leveling, gylcol ice Design 4-Calmac IceBank tanks (model 1500) 4-Calmac IceBank tanks (model 1500) 1-York 300 ton centrifugal ice-maker/chiller 1-York 300 ton centrifugal ice-maker/chiller 1-York 180 ton screw chiller (base loaded) 1-York 180 ton screw chiller (base loaded) 165 gallons ethylene glycol 165 gallons ethylene glycol 1-Mueller plate & frame HTX 1-Mueller plate & frame HTX

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Cool Thermal Storage Analysis / Final Recommendation HAP 3.27 (DOS) building energy simulation Ice storage saved $3,800 in op. cost/year → 28 year payback Chiller plant w/ ice storage → L.C.C.=$1,851,714 > $1,738,472 (L.C.C. central plant w/o ice storage) Electric peak kW demand charge ($2.20/peak kW) not high enough to justify ice storage plant To justify ice storage plant, op. cost savings ~$21,500/year (for a 5 year payback) → peak kW demand charge = $15.35/peak kW Therefore, select electric central chiller plant w/o ice storage

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Mechanical Redesign Cost Analysis/Recommendations Goals met?

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Electrical System Analysis New 800A motor control center, MCC2 - electric chillers (one 400A switch & fuse/chiller) Original chiller panel, ML1, 225A-100A Smaller cooling towers on original 400A panel, MP, circuit breakers resized from 100A to 30A Smaller condenser water pumps on original 800A MCC1, circuit breakers resized from 100A to 30A All electrical feeders and conduit resized accordingly Added electrical system first costs (R.S. Means): $10, Added first cost only ~1% increase in plant’s L.C.C.

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Lighting System Analysis Conference Center Ballroom ~23,296 sq. ft. 4 types of decorative, custom incandescent fixtures - size from 12”x28” to 14’x24’ (4-124 lamps/fixture) Original lamp(s): standard 60W incandescent (2700K), avg. life hrs = 1000, 850 I. lumens Replacement lamp(s): 20W C.F. (2700K), avg. life hrs = 8000, 965 mean lumens Equal lumens/fixture on workplane Lowered power density by 1.5W/sq.ft. Mechanical cooling saved: 10 tons Mechanical system first cost savings: $10,000 (~ $1,000/ton, S.A. Mumma) First cost of C.F. vs. Incandescent lamps: $3, (more) Total first cost savings: $6,122.80

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Construction Management Analysis Short Interval Production Scheduling (S.I.P.S.) – hotel 2nd-10th levels Selected due to hotel’s repetitive construction process → maximum efficiency/minimized learning curve Specific construction activities identified and assigned production rates using original construction schedule Logical combining of trades - detailed ‘mini-schedules’ Time-scaled, resource-loaded bar chart S.I.P.S. hotel construction = 45 weeks vs. original schedule’s 51 weeks Savings calculated from general conditions costs: $193,548.39

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Summary Overall Savings $$$: Mechanical chiller plant redesign → $430,516 Mechanical chiller plant redesign → $430,516 Electrical system redesign → (-$10,618) Electrical system redesign → (-$10,618) Lighting system redesign → $6,123 Lighting system redesign → $6,123 Construction Management Construction Management Scheduling → $193,548 Total Redesign Savings

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Acknowledgements Thesis Building Sponsors: Southland Industries HITT Contracting Quadrangle Development Corporation The Pennsylvania State University Architectural Engineering Faculty: M. Kevin Parfitt – Faculty Director Jonathan Dougherty – Graduate Assistant Dr. William P. Bahnfleth – Thesis Advisor Dr. Stanley A. Mumma – Honors Thesis Advisor Dr. James D. Freihaut – Mechanical Faculty Dr. Jelena Srebric – Mechanical Faculty Dr. Jae-Weon Jeong – Mechanical Faculty Special Thanks To… …all of my friends and family for their endless amounts of love and support throughout my years here at Penn State.

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Any Questions?

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Utility Rate Schedules: Electric – Pepco (Summer) (Winter) Natural Gas – Washington Gas

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Absorption Chiller Costs:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Plant Types-First Cost Breakdowns:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Electric Plants-First Cost Breakdown:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Ice Storage Plant-First Cost Breakdown:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Ice Storage Diagrams:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Ice Storage Diagrams Continued:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Chiller Plant Redesign Flow Diagram (CHW):

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Chiller Plant Redesign Flow Diagram (HW):

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option DOE Indices:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option DOE Indices LCC:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Sensitivity ?

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Sensitivity ?

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Electrical Calculations:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Electrical Calculations continued:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Lighting Calculations:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Lighting Calculations continued:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Construction Management Specific Activities Table:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Construction Management Specific Activities Table continued:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Construction Management Specific Activities Table continued:

The Montgomery County Conference Center and Hotel Jessica R. Baker The Pennsylvania State University Architectural Engineering Mechanical Option Construction Management Cost Calculations: