API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler with Terry Dammel & Joe Day, Schlumberger.

Slides:



Advertisements
Similar presentations
Iron-ic Breakfast Cereal.
Advertisements

ESF Workshop The future of stable beams in Nuclear Astrophysics NCSR Demokritos, Athens, Greece December 14-15, 2007 Organizing Committee S. Harissopulos.
Goal Setting.
NOVEL CHEMICALLY BONDED PHOSPHATE CERAMIC BOREHOLE SEALANTS FOR ARCTIC ENVIRONMENT NOVEL CHEMICALLY BONDED PHOSPHATE CERAMIC BOREHOLE SEALANTS FOR ARCTIC.
Use of cement: Cement is ONLY one of the ingredients in any applications – well cementing or construction concreting. The specified quality parameters.
Page 1 API SC 10 Denver, June 2012 – Composite Cement Testing | H. Plack | May 2012 Composite Cement Testing Dyckerhoff Germany Denver, June 2012, Heiko.
Atlanta R&D Center, Atlanta, Georgia, USA
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
CITY OF HOWELL Water Treatment Plant  Superintendent: Jim Webster.
By: Noah Peregrine Falcon. Scientific Name: Peregrinus.
Jessie Holderman Beth Madsen Adam Oster. Agenda Project learning Specifications Axiomatic design Comparisons Proposed designs Questions Source:
Current vs. proposed procedures CURRENT PROCEDURE Each proposal author or authors chooses the college or discipline-based panel that they want their proposal.
Keyframe Control of Smoke Simulations SIGGRAPH 2003.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
API Dynamic Settling June 11-15, Project Goals Design four systems for cooperative testing. System 1 Pass API Sedimentation Test Fail Dynamic Modified.
API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler Engineering with Terry Dammel & Joe Day, Schlumberger.
Airport Pavement & Aggregate Crushing Presented by Kristen Blake, Shelby Brevogel, Lauren Hillis, Nate Rahaim, and Andrew Short.
Heating water experiment By: Brianna, Jordan, Jordan, and Tyler.
Energy Storage in Capacitors.
Brooten Area Water Use June 19, Brooten – Initial Conflict Study Area.
Experimental determination of motor model parameters ETEC6419.
Bringing Value to Russian Federation Fracturing Business:
COURSE TITLE: Achieving Part L Compliance and BER using SBEM.
Do Now 1/5/15 Pick up pre assessment. Sit in your new assigned seat. Look at back wall to find out who is in your group.
Fluid Mechanics and Applications Inter American Chapter 7 MEEN 3110 – Fluid Mechanics and Applications Fall Lecture 07 CENTRIFUGAL PUMP CHARACTERISTICS.
The Scientific Method Chpt. 5 Summary. Objectives Describe the order of steps in the scientific method Describe the order of steps in the scientific method.
A. to avoid eye strain. B. to improve your vision.
Solutions & Solubility
Presentation Title Goes Here (May use additional line if title is long) Presenter Name Presenter Title Company/Institution Smart Grids Interface for the.
Significance   Description of the Field Operating Procedure and possible uses 2.
Liquid Stone Huward Fontenot MEEN Spring 2004.
Bayes Theorem in Failure Mode and Effects Analysis Peter G Blaine, Professor PJ Vlok, Professor AH Basson, and Mr RT Dobson Energy Postgraduate Conference.
Maximal Heart Rate Determining Maximal Heart Rate Maximal heart is a key element in planning the intensity of training. A ramp test that leads to high.
Functions of Management Mrs. Nations Introduction to Business and Technology.
Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background.
First-Year Engineering Program Advanced Energy Vehicle System Analysis 3 Reference:  AEV Lab Manual  System Analysis 3 Grading Guidelines.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Calculator Questions & Answers. When can I use a calculator?
Manual Extraction of DNA from The Blood. Materials - Blood Sample. - Distilled water. Dionized water. - Ice and Plastic bucket.-
Solutions & Solubility Solution Preparation. Solution Preparation from a solid  Standard Solution = a solution for which the precise concentration is.
FOP for Test Method. Significance  Description of the Field Operating Procedure and possible uses 2.
Ken Cook – SOO NWS Wichita, KS (ICT) An Assessment of Using the Mean Field Bias Correction to Improve Precipitation Estimates Ken Cook and Maggie Schoonover.
FLASH EMISSIONS JIM COOPER, CHESAPEAKE ENERGY CORPORATION.
Warm Ups: 1) (4x3 + 2x2 + 1) – (x2 + x – 5)
Energy Storage in Capacitors.
API Mixing Energy Proposal
API SC 10, Work Group 3 Update:
Ratio r: 2:1 RPM: 8 t: 20:10 R: 8:16 RPM: 16 Teeth: 20 Radius: 2
ASSIGNMENT NO.-2.
2017 Exploration & Production Winter Standards Meeting
Topic 2 Atomic Structure
Laboratory Equipment -Go through each slide.
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
Equilibrium Ms. Hoang ACP Chemistry.
Regents Physical Setting: Earth Science
API 2017 Exploration & Production Standards
Development of a specification
Hartree-Fock Self Consistent Field Method
Production management
Week 24 Explain that entropy is a measure of the disorder of a system, and that a system becomes energetically more stable when it becomes more disordered.
WG on Composite Cements: Calgary Meeting 2017
Unit 3 Review (Calculator)
Topic 2 Atomic Structure
The Design of LNG liquefaction Plant & Control Strategy development.
Determine the units for Kc.
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
API SC 10 Cooperative Testing Program 2018 Dyckerhoff Class G sample preparation and distribution API Summer Conference June 12th,
Alternative Mixing Procedure
Regents Physical Setting: Earth Science
Presentation transcript:

API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler with Terry Dammel & Joe Day, Schlumberger

Project Goals Assign a Mixing Energy to each Cement Slurry Step 1 - Laboratory testing with a Waring Blender Time to reach a vortex at 4000 rpm Calculate a Mixing Energy value Step 2 – Field Mixing Equipment Determine the Mixing Energy of your Field Equipment Calculate the time needed to Mix the Cement Slurry

Parameters Standard API Waring Blender Exception to Standard API Mix Alter 15 seconds at 4000 rpm Time mix at 4000 rpm until a stable vortex is reached. Once a vortex is reached mix at 12,000 rpm for 35 seconds. Calculate Mixing Energy The energy needed to hydrate a slurry

Mixing Energy Calculations for the Waring Blender

API Specification 10A

Mixing Energy Values

Questions Why does this brand of Class H cement require a high mixing energy? Why the difference between two buckets of the same lot? Will it be able to be mixed in the field? Will it be able to be pumped on the fly?

Questions for API How do we know if a cement slurry can be mixed? Can this procedure be adapted as a part of API testing? Should 15 seconds at 4000 rpm be applied once a vortex is achieved?