Nederlandse Aardolie Maatschappij BV1November 2012 Restricted Charge testing for well concept selection November 2012 Eelco Bakker, Al Zanimonsky, NAM.

Slides:



Advertisements
Similar presentations
Carbon Dioxide Demonstration Project Supporting Research at KU Jyun-Syung Tsau presented for Tertiary Oil Recovery Project Advisory Board Meeting October.
Advertisements

Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April , 2011 ExxonMobil Exploration / Well Testing Team.
Well Completion Design for a Subsea Infill Oil Producer John Mason, November 2012.
J. Hardesty, M.R.G. Bell, and N.G. Clark, GEODynamics, Inc.
Optimising Building Design for Sustainability Using High Performance Concrete Doug Jenkins - Interactive Design Services Daksh Baweja – The University.
Lecture #13 Properties of Hardening Concrete Curing.
Terra Slicing Technology Overview.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
The Role of the Annular Gap in Expandable Sand Screen Completions SPE J. Heiland, J. Cook, A. Johnson, B. Jeffryes. Schlumberger Cambridge Research.
Presentation to Repsol by MYS on 9/13/06 Well Completion Design for Tight-Gas Formations M. Y. Soliman, PhD September 20, 2006 Mendoza, Argentina.
IHS-Präsentation, 2008 Ruprecht University of Stuttgart Institute of Fluid Mechanics and Hydraulic Machinery, Germany IHS Experience in mathematical optimization.
2012 EWAPS Amsterdam API RP19B Update Presented by Mark S Brinsden Shell Chair API RP 19B Committee Mark Brinsden API RP 19B 2012 EWAPS - Amsterdam.
 A 'heat exchanger' may be defined as an equipment which transfers the energy from a hot fluid to a cold fluid. Here, the process of heating or cooling.
E. Putra, Y. Fidra and D.S. Schechter
Preliminary Reservoir Model MC252 6-July DRAFT Outline Modelling approach & purpose Input Data & Model −Rock & Fluid Properties −Layering −Aquifer.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Well Design PE 413.
Completing & Producing A Well
Classification: Internal Status: Draft Low Salinity Waterflooding: Opportunities and Challenges for Field Pilot Tests Dagmar Spangenberg, Peimao Zhang.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of 2000 Model.
DYNAMIC UNDERBALANCE PERFORATIONS BRING HIGHER PRODUCTIVITIES THAN CONVENTIONAL PERFORATIONS A large scale comparative review from the Tunu Gas Field (Indonesia)
Pseudopressure Function
Electron Cloud Simulations Using ORBIT Code - Cold Proton Bunch model April 11, 2007 ECLOUD07 Yoichi Sato, Nishina Center, RIKEN 1 Y. Sato ECLOUD07.
Casing Design.
Modelling Unconventional Wells with Resolve and Reveal Juan Biörklund (Gauloise Energía) and Georg Ziegler (Wintershall Holding)
Perforating Requirements for Fracture Stimulation
OIL AND GOVERNANCE State-owned Enterprises and the World Energy Supply GEMBA 11.
Table of Content Introduction of heat exchanger. Design of Coolers.
Alex Procyk, ConocoPhillips, David Atwood, Schlumberger
Reservoir Simulation Study
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
Lesson 21 Prediction of Abnormal Pore Pressure
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Res A Performed By Gemini Solutions, Inc. May 2001.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Mechanical Properties of Materials
1 © 2014 Baker Hughes Incorporated. All Rights Reserved. © 2015 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING.
Permeability Fracture Permeability
Schlumberger / Client Confidential
An Application of Reactive Charge Technology to High Strength Formation and High Overbalance Environments: Charge Design and Operational Challenges EWAPS-12-2.
AAE 450 – Spacecraft Design Sam Rodkey 1 Active Thermal Control Design Sam Rodkey March 1 st, 2005 Project Management Project Manager.
Above and Below ground decomposition of leaf litter Sukhpreet Sandhu.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Schlumberger-Private Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is.
Perforating Design for HTHP Completion: Rigorous Testing to Maximize Well Productivity Alex Procyk, ConocoPhillips, David Atwood, Schlumberger Presented.
Petrophysical evaluation of the Rotliegend in K15-FB-107
Hydrotransport 15 Conference
Analyzing reservoir and overburden impacts on seismic and electromagnetic responses and the applicability of seismic/EM methods in deep water reservoir.
Perforation Strategy for Sand Management in
A New Coal-Permeability Model:
SUBSEA GAS BOOSTING Jon Steinar Gudmundsson October 8, 2008
IPS – International Perforating Symposium Europe The Renaissance Hotel, Amsterdam 19th - 21st May 2015 An Integrated Testing and Modeling.
Establishing Patterns Correlation from Time Lapse Seismic
International Perforating Symposium Amsterdam 2015
Potential for Geological Carbon Sequestration using deep saline aquifers in the Illinois Basin GIS Term Project Julien Botto.
StimGun™ and StimTube™ Tool Successes in West Texas
A RESERVOIR MANAGEMENT REVOLUTION
Gas Condensate Blockage
LDZ System Charges – Structure Methodology 26 July 2010
Andy Martin, Alexis Marmol & Abdullah Khan IPS-15-8
Gas Field Development Class Example
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Example 1 of SPE : Simultaneous versus Well-by-Well Optimization
Gas Condensate Blockage
Gas Condensate Blockage
Gas Field Development Class Example
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Presentation transcript:

Nederlandse Aardolie Maatschappij BV1November 2012 Restricted Charge testing for well concept selection November 2012 Eelco Bakker, Al Zanimonsky, NAM Mark Brinsden, Shell EWAPS Presented at 1 st European & W African Perforating Symposium, Amsterdam 7 – 9 November 2012

Nederlandse Aardolie Maatschappij BV2Month 2010 Restricted content Well concept evolution Case for charge testing Test set-up / test conditions Charge test results Findings charge testing Impact concepts Conclusions and way forward

Nederlandse Aardolie Maatschappij BV3Month 2010 Restricted Well concept evolution Netherlands / Southern UK sector scene setting Mature area, remaining gas/oil accumulations small size (0.2 – 1 BCM) Early 2000’s: “step change” in costs required 3 Significant changes (down sizing) required in well design, rig selection, well functionality and surface lay-out in order to meet challenge

Nederlandse Aardolie Maatschappij BV4Month 2010 Restricted Well concept evolution – 1 st step Typical well data Reservoir depths: mAH (1800 – 3500 m TVD) Reservoir pressure 250 – 360 bar (undepleted) Reservoir temperature deg C permeability : < mD, porosity % typical features: reduced csg sizes simple wellhead 3½” cemented completion 2” perf guns, static balanced / slight underbalance for trigger interval  Concept worked for no. of years BUT next step ? 4 Old designcurrent design

Nederlandse Aardolie Maatschappij BV5Month 2010 Restricted Well concept evolution – the next step ? 5 Current base case 3 ½” tbg, cemented in 6” – or 4 7/8” OH 2” guns Proposed “slim” case, low permeability Proposed “slim” case, high permeability 2 7/8 ” tbg, cemented in 4 7/8 ”- or 3 15/16 ” OH small guns: 1 9/16” or 1 11/16 ” 3 ½” * 2 7/8 ” tbg, cemented in 4 7/8 ”- or 3 15/16 ” OH small guns: 1 9/16 ” or 1 11/16 ” Driven by swell data assumptio ns

Nederlandse Aardolie Maatschappij BV6Month 2010 Restricted Slim well concept – impact gun size (base modelling) 6 2” guns Small guns IPR Case for charge testing: based on initial modeling, impact (Q / NPV) of changing to slim completion could be significant  needs further clarification  test DoP assumptions !!

Nederlandse Aardolie Maatschappij BV7Month 2010 Restricted Charge testing conditions in lab reservoir UCS = 1000 – 2000 psi (70 – 140 bar) Res Pressure = 4350 – 5000 psi ( bar) Overburden = approx 9200 psi (634 bar) UCS of test sample Internal Pressure Field conditions Confining stress on outside of the sample Test set-up / test conditions In order to mimic field conditions as good as possible selected the following parameters:  Carbon Tan material (sandstone)  internal / confining stress  Section 2 only, no flow conditions  Various combinations OH size / tbg – and charge size  Varying cement thickness

Nederlandse Aardolie Maatschappij BV8Month 2010 Restricted Charge test results 2” charge Carried out some 33 tests (3 labs, test data randomly plotted !!) Tests in 7” and 4” Carbon Tan cores, both centralised / excentralised. In some tests free gun volume ( FGV) reduced to minimise effect DUB (dyn underbalance) Data used in original modelling Sample no 

Nederlandse Aardolie Maatschappij BV9Month 2010 Restricted Charge test results small charge Carried out some 17 tests (3 labs, test data randomly plotted !!) Tests in 7” and 4” Carbon Tan cores, both centralised / excentralised. In some tests FGV reduced to minimise effect DUB Data used in original modelling Sample no  DoP, inch EHD, inch

Nederlandse Aardolie Maatschappij BV10Month 2010 Restricted Findings charge testing (1) Futher analysis of results Impact cement thickness clearly seen in majority of tests (6” vs 4 7/8” OH, 4 7/8” vs 3 15/16” OH) Sample no 

Nederlandse Aardolie Maatschappij BV11Month 2010 Restricted Findings charge testing (2) Futher analysis of results Centralisation / stand-off impact: significant and hence to be included, not directly included in original modeling Overall “perforation efficiency” (OH tunnel length/TCP tunnel length) from tests some 80%, hence efficiency for actual field conditions lower (less optimal conditions for dyn UB)  tentatively 50% DoP 2” charge verticaldeviatedUsed for original modeling 6” OH 9”7.7” 7” 4 7/8” OH 11”9.6” EH 0.19”0.17”0.22” Eff, % Small charge verticaldeviatedUsed for original modeling 4 7/8” OH 2.9”2.4” 4” 3 15/16” OH 5.1”4.3” EH 0.17” Eff, % 50 80

Nederlandse Aardolie Maatschappij BV12Month 2010 Restricted Impact charge testing on well concept selection Impact 2” charge:  test results impact rel. minor  Higher DoP offset by lower assumed perforation eff. Impact small charge:  impact clear  Lower DoP + lower assumed perforation eff.

Nederlandse Aardolie Maatschappij BV13Month 2010 Restricted “Economics” : Impact charge testing on well concept selection BAS E 2” charge Minor Impact Small charge Major Impact

Nederlandse Aardolie Maatschappij BV14Month 2010 Restricted Conclusions Charge testing results Reducing tubing size to 2 7/8” and using smaller charges not attractive given loss of inflow / recovery  this concept no longer pursued !! Impact perf tunnel efficiency significant Impact cement thickness for smaller charges potentially under- estimated potential impact on selected drilling practices (OH drilling diameter) Perforation tunnel efficiency possibly overestimated in original modelling “ideal” lab tests gave results of approx 80%, field conditions (small clearance, low static UB) far from ideal. Way forward Carry out gun survival tests for 2” guns inside 2 7/8” tubing  if successful repeat charge testing  pursue the tapered 2 7/8” * 3 ½” completion concept using 2” guns.

Nederlandse Aardolie Maatschappij BV15Month 2010 Restricted