PACS page 1 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 PACS page 1 Overview of SPIRE Photometer Pipeline C. Kevin Xu (NHSC/IPAC)

Slides:



Advertisements
Similar presentations
Application of the SIDECAR ASIC as the Detector Controller for ACS and the JWST Near-IR Instruments Markus Loose STScI Calibration Workshop July 22, 2010.
Advertisements

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
Bruno Altieri September # 1 PACS photometer pipeline overview Bruno Altieri (ESA/HSC)
Data Processing Workshop ESAC, Madrid, Spain 20 – 24 February 2012 Stephan Ott VG #1 PACS Overview and the latest developments.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Photometer AORs How to Prepare an Observation with HSpot: 2 Science Use.
- page 1 NHSC PACS Web Tutorial PACS-401 NHSC/PACS Web Tutorials Running PACS Photometer pipelines PACS-401.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 SPIRE Photometer Data Reprocessing Bernhard Schulz (NHSC/IPAC) on.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 SPIRE Day team, goals, schedule, logistics Bernhard Schulz NHSC/IPAC.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
PACS NHSC SPIRE Point Source Spectroscopy Webinar 21 March 2012 David Shupe, Bernhard Schulz, Kevin Xu on behalf of the SPIRE ICC Extracting Photometry.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Photometer Extended Source Photometry Bernhard Schulz NHSC/IPAC on behalf of the SPIRE.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-202 (for Hipe 9.0) Level 0 to Level 2 processing: From raw data to calibrated.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
NHSC Workshop August 2013 NASA Herschel Science Center - page 1 PACS David R. Ardila User Support coordinator / NHSC Archive Scientist The Herschel Science.
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-202 (for Hipe 8.0) Level 0 to Level 2 processing: From raw data to calibrated.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS PACS Photometer Standard Pipeline Level 0 to Level 1 processing: From raw to calibrated data cubes.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS PACS Photometer Standard Pipeline Level 1 to Level 2 processing: How to make a map for point source.
PACS Hitchhiker’s Guider to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 SPIRE Photometer Data Products Kevin Xu NHSC/IPAC on behalf of the.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 Roberta Paladini NHSC/IPAC PACS photometer maps: several flavors.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Photometer: Overview and Products Roberta Paladini NHSC/IPAC.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 12.0) Level 1 to Level 2 processing: The JScanam pipeline Prepared.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 Measuring Photometry from SPIRE Observations Presenter: David Shupe (NHSC/IPAC) on.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-201 (for Hipe 12.0) Level 1* to Level 2 processing: The High-Pass Filter pipeline.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 The SPIRE Destriper Bernhard Schulz NHSC/IPAC on behalf of the SPIRE ICC 1.
Page 1 PACS NHSC Webinar: New SPIRE Features in HIPE 10 6 th March 2013, Pasadena What’s New in SPIRE Photometer Pipeline in HIPE 10 Kevin Xu NHSC/IPAC.
Herschel Open Time Cycle 1 DP workshop ESAC, March page 1 Spurs in HIFI data Colin Borys.
PACS Page 1 NHSC Workshop on HSA Data Oct 6-10, 2014 SPIRE Spectrometer Data Reduction: Special Cases Nanyao Lu NHSC/IPAC (On behalf of the SPIRE ICC,
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 SPIRE Broad-Band Photometry Extraction Bernhard Schulz (NHSC/IPAC)
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Spectrometer: Overview and Products Roberta Paladini NHSC/IPAC.
Page 1 PACS NHSC Webinar: New SPIRE Features in HIPE th Nov 2012, Pasadena Update on SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 HIPE Introduction and Setup for SPIRE David Shupe, NHSC/IPAC on behalf of the SPIRE.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS Deglitching PACS Photometer Data Presentation based on tutorial PACS-402.
NHSC SPIRE Data School – Pasadena 28 th - 30 th June 2010 PACS page 1 SPIRE Imaging Fourier Transform Spectrometer (FTS) Pipeline Data Processing Nanyao.
Page 1 PACS NHSC Webinar: What’s New in HIPE 13 for SPIRE 19 th May 2015, Pasadena What’s New in HIPE 13 General Topics Bernhard Schulz (NHSC/IPAC) on.
Data Processing Workshop NHSC, Pasadena, CA 02 – 04 February 2011 Stephan Ott VG #1 PACS Overview and new developments in.
NHSC Data Processing Workshop – Pasadena 25 8h 30 th June 2010 PACS page 1 Workshop Slides NHSC-SPIRE Team NHSC Data Processing Workshop Pasadena
Page 1 NHSC PACS Web Tutorial Babar Ali PACS 401 PACS photometer map-making with MADmap PACS-401 for HIPE 11 user release Version Babar Ali (NHSC)
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
NHSC PACS PACS Photometry and Errors Estimate Roberta Paladini (NSHC/Caltech) R. Paladini NHSC Archive Data Processing Workshop – August 26 th – 30 th.
PACS Photometer Standard Pipeline Level 0 to Level 1 processing From raw to calibrated data cubes B. Altieri (ESA/HSC), N.Billot (IPAC/NHSC) ESAC March.
PACS NHSC Data Processing Workshop Aug 26-30, 2013 Page 1 SPIRE Spectrometer Data: Calibration Updates, User Data Reprocessing, and Other Issues Nanyao.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Issues with Photometer Data & How to Resolve them with HIPE Tools Kevin Xu.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
Page 1 NHSC PACS Web Tutorial PACS 301 nhsc.ipac.caltech.edu/helpdesk NHSC/PACS Web Tutorials Running the PACS Spectrometer pipeline for CHOP/NOD Mode.
NHSC Data Processing Workshop Aug 26-30, 2013 PACS Page 1 SPIRE Spectrometer Data Processing (The Pipeline) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE.
HIFI Tutorial 1: Running the HIFI Pipelines and Adaptations A.P.Marston ESAC 27 June 2013.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 13.0) Level 1 to Level 2.5 processing: The JScanam pipeline Prepared.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Preparing HIPE for SPIRE work David Shupe, NHSC/IPAC on behalf of the SPIRE ICC.
PACS page 1 NHSC SPIRE Data Processing Webinars 7 th March 2012 PACS page 1 SPIRE Photometer Map Making C. Kevin Xu (NHSC/IPAC)
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
PACS Page 1 NHSC Workshop on HSA Data Oct 6-10, 2014 SPIRE Spectrometer: Pipeline Calibration Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC, HSC & NHSC)
NHSC HIFI DP workshop Caltech, 8-9 March page 1 Pat Morris, NHSC DP Webinar, 9 March 2012 HIFI Spectral Maps in HIPE.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-403 (for Hipe 13.0) Level 1 to Level 2.5 processing: The Unimap pipeline Prepared.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 Reprocessing Scan Maps Kevin Xu NHSC/IPAC on behalf of the SPIRE ICC.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 Overview of SPIRE Photometer Data Reduction Pipeline Kevin Xu NHSC/IPAC.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration Herschel Calibration Workshop PACS Photometer Flux Calibration: Update Markus Nielbock (MPIA.
photometry and spectroscopy with PACS
NHSC/PACS Web Tutorials
PACS ICC Meeting #41 PACS Photometer
Overview and the latest developments in Herschel Data Processing
Overview and new developments in Herschel Data Processing
What’s New in HIPE 10.0 (SPIRE FTS)
Presentation transcript:

PACS page 1 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 PACS page 1 Overview of SPIRE Photometer Pipeline C. Kevin Xu (NHSC/IPAC)

PACS page 2 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Goals: Show how SPIRE Photometer pipeline works (functionalities of major modules). Explain what is new in HIPE 8. Brief summary of remaining issues. Will concentrate on scan map “user pipelines” (covering small map, large map, SPIRE/PACS parallel mode).

PACS page 3 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 User Pipelines You can find these “user pipelines” in HIPE: User pipelines (Jython scripts): Simplified version of Standard Product Generation (SPG) pipelines.

PACS page 4 NHSC SPIRE Data Processing Webinars 8 th Feb ’ Our focus (“user pipelines”) SPIRE Pipeline & Data Products (in HIPE)

PACS page 5 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Scan Map Pipeline Flow Chart Baseline removal + Mapper A “reversed sequence” relative to the chain of data acquisition place-holder Default: concurrent deglitcher + wavelet deglitcher Alternative: σ-κ deglitcher FFT based (run after deglitch & repair to avoid ringing) Include: (1) Non-linearity correction (2) Volt to Jy/beam conversion Remove 1/f noise due to T-drift FFT based Default: naïve mapper Alternative: madmapper Telescope pointing & orientation SPIRE detectors positions Choices: Default: scan median baseline removal Advanced : polynomial baseline removal Most advanced: an iterative destriper

PACS page 6 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Scan-By-Scan Processing The pipeline processes timelines scan by scan (to ease the demand on RAM). Problem: ringing at the two ends of each scan due to FFT based modules. Solution: (1) Before the process, attaching “turn-around” data blocks to ends of the scan. (2) During the process, the ringing is confined to the “turn-around” data. (3) After the process, cut-off the “turn-around” data blocks from the scan. Uniform scan speed distance Turn- around

PACS page 7 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Highlights of a User Pipeline (Jython Script) New in HIPE 8.0 (for extended source, optional)

PACS page 8 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Signal “Jump” Sudden (spontaneous?) jump in the timeline of a single channel. Mostly seen in thermistors (see below). Very rarely seen in detectors. The average frequency is ~ 1/day ( a few hundred instances since launch). The cause is still unknown. Effect: The pipeline uses thermistor timelines in the correction for detector signal drift due to bath temperature drift (major source of 1/f noise for SPIRE). A thermistor “jump” affects this correction, introducing artificial stripes in the final map. Jump Stripe caused by the jump

PACS page 9 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Thermistor Jump Solution (in HIPE 8.0) a “reversed sequence” relative to the chain of data acquisition scan by scan processing Jump Detector (automatically identify & mask any thermistor affected by a jump) Exclude masked thermistors New module Destriper + Mapper

PACS page 10 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Status of SPIRE Scan Map Pipeline in HIPE 8.0. General assessment: In many cases, data from HSA are already science quality! The official calibration accuracy is ±7% (5% from model, 2% RMS). An example (on the right): The image from HSA looks good. Caveat: detailed inspections show thin stripes (can be improved using a more advanced baseline remover such as the iterative destriper). A major issue yet to resolve: stripes due to bias voltage drift (the “burp”) (affecting a few observations) SPIRE 3-color map of NGC 5315 (a planetary nebula) (Public data taken from HSA)

PACS page 11 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Bias Drift in “Burp” Period Every time when SPIRE is switched on after a cooler recycle, the first ~6 h sees a rapid rise of bias voltage (the “burp”). This effect has not been corrected in pipeline. It causes stripes in maps observed during the “burp” period (see example below). A pipeline module is now being developed to correct this effect (available soon). For point source surveys, the stripes might be removed by polynomial baseline removal. After cooler recycle 1 (~40 h) After cooler recycle 2 (~40 h) “burp” ~ 6h bias drift ~10σ  Resistor voltage Bias voltage An example of stripes caused by bias drift (Standard pipeline product)

PACS page 12 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Summary Scan-Map pipeline covers nearly all SPIRE PHOT AOTs (small map, large map, map in SPIRE/PACS parallel mode). It follows a “reversed sequence” relative to the chain of data acquisition. For a general user, Level0_5 should be the best starting point. From Level0_5 to Level 1, the pipeline processes any observation data set scan by scan (to ease the demand on the RAM). The current pipeline (HIPE 8.0.1) does a good job (“science ready”) in general. However, the pipeline still has some open issues: that (1) Stripes due to the “burp effect” (affecting ~10% observations). (2) Residual stripes (can be corrected by the destriper module in HIPE). (3) Residual glitches in maps (2nd level deglitcher being developed inside the destriper module).

PACS page 13 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 Home work: Run Photometer Large Map user pipeline (with your own data or NGC 5315 data). Next: A demo of SPIA (SPIRE Photometer Interactive Analysis), a GUI based data reduction tool (including all pipeline modules and more).