QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.

Slides:



Advertisements
Similar presentations
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Advertisements

LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
1 QXF heater design: current status and the path forward M. Marchevsky (LBNL) 03/06/2014 D.W. Cheng, H. Felice, G. Sabbi (LBNL), G. Ambrosio (FNAL)
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Surface Coatings & Tests for LARP Coil Endparts Task Force D.W.Cheng LBNL February 24, 2012.
QXF instrumentation trace development
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
1 Quench Protection Workshop - 04/29/2014 QXF heater design M. Marchevsky, D.W. Cheng (LBNL) E. Todesco (CERN) T. Salmi (Tampere UT) G. Chalchidze, G.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
1 QXF / SQXF heater design update M. Marchevsky (12/03/13)
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
MQXFS1 Coils QC & DRs J. Schmalzle May 14, MQXFS1 Coils MQXFS1 Coils SQXF03 & SQXF05 – Reaction Temperature Data – Electrical Checks – DRs May 14,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
Winding tests on Roebel cables
11 T Dipole Integration & Plans M. Karppinen
HQ Coil 19 Test Impregnation
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Quench Protection and Meeting Goals
Mechanical stability and QXF coil winding
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
MQXF quench heaters: tests and investigation (CERN)¶
Presentation transcript:

QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013

QXF Coil Fabrication Baseline Overview Some baseline decisions were made during the LARP CM20/HiLumi meeting in Napa These decisions were reviewed during the Coil WG video meeting 4/16/13, and some issues were raised with respect to some of the decisions made. The following slides outline only what has been decided as a baseline. See the notes for the complete discussion on other issues April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.2

Outline of Coil Fabrication Baseline Baseline decisions – Coil Parts Design – Coil Winding – Coil Curing – Coil Reaction – Coil Impregnation – Coil Instrumentation April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.3

QXF COIL FABRICATION: BASELINE DECISIONS April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.4

Coil Parts Baseline CERN to purchase parts through their RP DMLS (Direct Metal Laser Sintering) vendor (cheaper/faster than available in US) Plasma coating only on the OD of the end spacers, endshoes, and endshoe (splice) extensions (L1, L2) No plasma coating on the pole islands – Thick tape around the pole island (.015”/381µm) G11 alignment keys will be used Do not slit endshoes for fit End shoe extension – 140 mm long, for full splice; will not remove endshoe to make splice – Assumes max 117mm pitch length + 2-3mm and 20 mm for VT SQXF length will be set at 1.51 m April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.5 Courtesy: G. Kirby Design Fab. Fit

Coil Winding Baseline Coil winding will use winding tool – Curing matrix will only be used for cases where a popped strand cannot be manipulated back into position with normal means Winding tension & cable twist – 10kg for first turn – 25kg for subsequent turns – No cable twist between spool & coil Intralayer Insulation will be cured – “Hybrid” curing where the ends are left uncured will be explored with HQ/LHQ processing April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.6

Coil Curing Baseline Coils will be cured without the addition of extra shims on midplane Replaceable curing endshoes will be used. – HQ and LHQ windings will test both the split and short-leg replaceable endshoes Real endshoes will not be split, and they will be full-length legs April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.7

Coil Reaction Baseline Wedges are currently using C510 Phosphor bronze – ODS Copper C15715 (Glidcop AL-15) may be explored if necessary, since it has better post-thermal cycle properties QXF Practice coils will be designed for open pole gaps after reaction April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.8 HQ Coil 17 post-reaction pole gap

Coil Impregnation Baseline Coils will be impregnated with CTD 101K epoxy – CERN’s latest data seems to indicate rad-hardness is acceptable Technical challenges for impregnation using Cyanate Ester blends (or other materials) likely to be pursued outside of LARP April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.9

Coil Instrumentation Baseline Wiring – Non-Teflon-insulated wiring to be specified for instrumentation that will be found in production magnets – Wiring for other R&D-only instrumentation can continue to use Teflon Traces – ID trace only required for voltage taps, no protection heaters – OD trace to have both voltage taps and protection heaters April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.10 Instrumentation wire routing of LQS03 at Lead End.

Inspection & QA Baseline CMM – All Labs to use same reference models April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.11

Appendix April 16, 2013 D.W. Cheng - QXF Coil WG Video Mtg.12