ISWG 25 Jan 2016 Report to SOWG 26 Jan 2016 Burst mode planning ESAC analysis of EPD close/far data taking strategy; probably ok Implies we can be a bit.

Slides:



Advertisements
Similar presentations
Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Advertisements

1 Combinational Logic Design&Analysis. 2 Introduction We have learned all the prerequisite material: – Truth tables and Boolean expressions describe functions.
GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
ESA UNCLASSIFIED – For Official Use ExoMars ESWT#7 9 Dec ESWT # Rover science preparations (RSM, LS) Status, problems, and how we will solve.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
Time correlation CHRIS WATSON ESAC.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
First CDF II Results on B s Mixing Joseph Kroll (Penn) Franco Bedeschi (INFN-Pisa) for the CDF B s Mixing Group La Jolla, CA – site of CKM2005.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Solar Orbiter SOWG 5| Richard Carr| Low Latency Pipeline Hosting and Delivery Architecture | Slide 1 ESA UNCLASSIFIED – For Official Use Solar Orbiter.
SOLAR ORBITER SOC Test Plans Nana Bach SOWG#7 – 6-9 July 2015.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
RBSP GAO Review 11 June PSBR data sharing plan Which products do you intend to make available for use by other teams in their data analysis? –We.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Available Tools for planning and Data Processing I. Musso.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
© Janice Regan, CMPT 300, May CMPT 300 Introduction to Operating Systems Principles of I/0 hardware.
Low Latency Data Visualisation Solar Orbiter SOC SOWG #5, ESAC, 8-10 July 2014.
Bridge Planning Layout Tools 1 Bridge Planning Layout Tools Horizontal Alignment Tool BGrade Elevation View Plot Tool Bridge Fill Plot Tool Bridge RPW.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Annual Spring Survey Results Wolf Creek Online High School.
Page 1 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status.
#bethebest. £ x CX score Happy Customers Spend Double   Source: Medallia analysis for HBR (August 2014) x1.3 x2.4 x1.9 x1.8 x1.5.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
1 UML Modeling of Spacecraft Onboard Instruments Takahiro Yamada, JAXA/ISAS April 2005.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
UC-12 L1 Flight Track over Ground Sites.
Combinational Logic Design. 2 Combinational Circuits A combinational logic circuit has: ♦ A set of m Boolean inputs, ♦ A set of n Boolean outputs ♦ n.
Notes Over 4.1 Plotting Points in a Coordinate Plane Up and down
HES-HKS & KaoS meeting 19/June/2012 Toshi Gogami.
7. LTP PLANNING EXERCISE: RESULTS Planning outcome Lessons learned from Planning Exercise.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
GlobEmission (ITT 6721) new ESA contract starting on Oct. 11 KNMI/BIRA/FMI/TNO/VITO.
ESAC | Chris Watson | ESA/ESAC | Page 1 “Day in the life” testing of LL VMs CHRIS WATSON ESAC.
Directorate of Manned Spaceflight and Microgravity Paolo Ariaudo (ESA MSM-EPO) MSFC/ESA TIM#2, February 22-24, 2004 MSFC/ESA TIM#2 February 24-27,
Combinational Logic Design. 2 Combinational Circuits A combinational logic circuit has: ♦ A set of m Boolean inputs, ♦ A set of n Boolean outputs ♦ n.
The road to the first E2E tests
SOC-Provided Ancillary Data: Update
Instrument Teams to SOC Test Specifications
Synthetic Division Examples
An Introduction to Observing Coronal Mass Ejections
Richard Carr, ESAC, January 2015
Pre-landing Orbiter Observations
Payload/Platform Operations SOWG #9 – 25th January 2017
SOC-Instrument Team interfaces
Polled Device Data Aquisitions
Solar Orbiter Instrument Testing by MOC-SOC
The RSP Archive System RSP Archive Concept Review 28 September 2017
Exploitation of ISS Scientific data - sustainability
Solo mission operations
Computer Architecture CST 250
Hire Toyota Innova in Delhi for Outstation Tour
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Training your brain for learning and living
Overview of the AATSR Validation Programme
Turbulence-Related Products Robert Sharman NCAR/RAP
WG-V Portable Instrumentation
Instrument Approaches to Your Airport
NSS Instrument Project Tollgate Coordinator
EPD Instrument paper Javier Rodríguez-Pacheco.
Objective: to find and verify inverses of functions.
Presentation transcript:

ISWG 25 Jan 2016 Report to SOWG 26 Jan 2016 Burst mode planning ESAC analysis of EPD close/far data taking strategy; probably ok Implies we can be a bit more flexible Teams to collate strawman burst mode strategies RPW and EPD to disucuss and coordinate selective downlink strategies Low latency data Content of plots; derived products e.g. ballistic mapping WG input to ESAC before next SWT Discussion of something a bit more interesting Autocompatability verification

Time synchronisation Precise relative timing of RPW, MAG and SWA MAG and RPW will request a dedicated test on OTB, summer 2016 or later MAG lead, 1 month

Service 20 testing Vital that service 20 works correctly in flight Impossible to test fully on ground RPW shock trigger: verified at institute using synthetic data OTB required for some parts Combining (3,25) data into S20 What do RS instruments want to do? Service 20 IS request to ESA RPW lead, 1 month