Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.

Slides:



Advertisements
Similar presentations
Customer Service – International dept. STAR 24 3 E.
Advertisements

MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
W89-A-0501 ZPU 08 / 14 / 24 1 High Pressure Pump for Grease Type ZPU 08 / 14 / 24.
Welcome to Malaga WeBex Common Rail Fuel System
ATLAS Module building at Glasgow
Customer Service VICTRIX 90 Central heating only, wall hung condensing boiler.
The EX100 & EX1000 Oil in Water Monitors. The EX100/1000 Oil In Water Monitor Features 1.Continuous Flow and Accurate Measurement. 2.Measurement range.
Diamond Radiator Development Brendan Pratt University of Connecticut GlueX Collaboration Meeting, Jefferson Lab, October 2011.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
October 2009 Custom Products & OEM Opportunities.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
ELECTRONIC FUEL INJECTION COMPONENTS
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
New Product Enhancements & VERSION 6.06 Firmware Enhancements GV3000/SEGV3000/SE.
Arduino. What is it? A open-source software suite and single-board microcontroller. Allows easy and affordable prototyping of microcontroller applications.
® AutoTune ™. ® Always optimal engine setting Higher productivity – Optimal engine performance at all times – No time spent on carburettor adjustments.
Automating Continuous Gas Lift
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Gauge Laser Pointer # Filed in December 2006 and Published in June 2008 Peter (Wonyoung) Kim OPT 310.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
HYDRAULICS & PNEUMATICS
Industrial Electronic Department Copyright of German Malaysian Institute. All rights reserved.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
CUE – Make Any Pump an E-Pump
HV-HR CMOS activity in Glasgow TCAD simulations of TowerJazz HR-CMOS sensors Characterisation of AMS350nm HV-CMOS pixels & strips R. Bates, C. Buttar,
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
Final Presentation Smart-Home Smart-Switch using Arduino
The complete flow monitoring solution Measure – Display – Switch – Transmit.
ICTWays workshop “Creativity and imagination in the classroom: Arduino and its application samples” LLP PT-COMENIUS-CNW
Istituto Tecnico Industriale A.Monaco EURLAB Object Detection Object Detection by Ultrasonic How to install and program a ultra sonic sensor with Arduino.
Force Feed Lubricator System
Short update from Glasgow R. Bates, A. Blue, T. McMullen.
Compressible Flow in Nozzles Thermal Engineering Lab ME-4111 Professor: Eduardo Cabrera Damian Luna Yetziel Sandoval – Alberto Gonzales –
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
National Centre for Nuclear Research, Poland
Date of download: 10/9/2017 Copyright © ASME. All rights reserved.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
→ need to guide UV light into gap; also beware temp effects
Growing Plants with the Power of Robotany
ProtoDUNE SP – Slow control temperature readout setup test
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
HR-HV CMOS activities and plans at Glasgow
Kenneth Wraight, Andrew Blue, Kate Doonan & Sam Crawley
GROUND-FAULT GROUND-CHECK MONITOR
HOUGHTO-MIX Coolant Mixing and Supply Unit Rainer Hoerbst
Barrel RPC Conditions Database
Welcome to Malaga WeBex سیستم سوخت رسانی ریل مشترک کاتر پیلار
Pixel CO2 Cooling Status
F&J SPECIALTY PRODUCTS, INC.
Global Air Sampler Systems
Sophie Young 21st February 2007
P08453: Turbomachinery Flow Visualization
H mm (1") High Pressure Pump
Test Beam Measurements october – november, 2016
Loop Water Controller Overview
Customer Presentation
Control Systems Kyle J. Hadcock.
WEDGE CONTROLLER The WEDGE is attached to the back of the control panel.
Presentation transcript:

Andy Blue Glasgow Update

Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection –Independent monitoring of Temperature and Humidity

Andy Blue WP3 Strip Meeting Remote Monitoring 4-20 mA (Current Loop) Sensor Board for Arduino Adruino Yun :built-in Ethernet and WiFi support Digital Vac/Pressure Gauge. Outputs 4-20mA indicating vac value Total Cost ~ £350 For reference, Cole Palmer sell similar system for about ~ £1.4k

Andy Blue WP3 Strip Meeting UV Glue valve using ASYMTEK machine DV-09 Needle Valve The DV-09 valve is an air-operated, adjustable needle valve. It is designed to apply precise, repeatable deposits from a fraction of a microliter up to continuous stripes of low to high viscosity fluids. Size: 108 x 27 mm (4.25 x 1.06 in.) Weight: 170 gm (6 oz.) Fluid Inlet Thread: 1/8 NPT Female Fluid Outlet Thread: Male luer lock Free -flow Area: 1.37 mm2 (.002 in.2) Maximum Fluid Pressure: 2067 kPa (300 psi) [21 bar] Air Pressure Required: 482 kPa (70 psi) [4.8 bar] Output Variation: ± 1.0% nominal (viscosity dependent)

Andy Blue WP3 Strip Meeting SCTDAQ Kenny at Glasgow working on Strip DAQ 1 day/week –Has began to get familiar with SCTDAQ –Looking at trim fitting code for ABC130 tests –Possibly modifying (speeding up) methods for fitting –He is also working on multi module testing for pixels using the RCE + HSIO setup

Andy Blue WP3 Strip Meeting Diamond Testbeam Testbeam is from 14 th -21 st October –In line to test HR CMOS Strip samples As well as LGAD strip and HV-CMOS devices –Currently writing code to trigger to/from oscilloscope, beam and xy stage to automate data taking Agilent Oscilloscope 9000A Running LabVIEW Data taking initiated by Trigger Works!

Andy Blue WP3 Strip Meeting Diamond Testbeam Turned out 1 st October was deadline for all diamond beam proposal for April – Sep 2015 –Managed to submit one for ABC130 tests Have requested 5 days Nearer the time we can maybe modify what we are testing Will find out in a few months if proposal has been accepted