Cell to cell alignment on GLC structures 24 Nov. 2014, CERN Toshi Higo (KEK) 2014/11/23CLIC Structure Review1.

Slides:



Advertisements
Similar presentations
Metal processes Press forming Sand casting Die casting Milling
Advertisements

Manufacturing Processes lab I Running a lathe machine
Fabrication and evaluation of HDDS cells Dec. 1012, ISG9, KEK T. Kume, KEK (Presented by T. Higo) Mechanical evaluation of HDDS cells and estimation toward.
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Mechanical Workshop Module 6: Drilling.
Mechanical Workshop Module 6
Machining Two introductory projects 1.Support post for mirror mount 2.Vertical micro-rail mount.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Machine Tools And Devices For Special Technologies Ultrasound machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Introduction to Precision Metrology
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Structure stacking alignment tolerances CLIC Workshop January 2015 CERN Anastasiya Solodko, on behalf of the CLIC study team.
Lathe and drilling machines
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Lathe and drilling machines
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Investigation threads on fabrication technologies for the CLIC X-band Accelerating Structures C. Rossi on behalf of the CLIC X-band Activity Thanks for.
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
H 2, partial gas, vacuum furnace for diffusion bonding against brazing 25 Nov. 2014, CERN Toshi Higo (KEK)
Module-6 Drilling.
10/2007 M.Taborelli, TS-MME Structure Manufacturing, Achievements and Challenges M.Taborelli -Technology -Shape accuracy -Surface quality -Assembly accuracy.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
Engineering perspectives on quadrants (1/2) Experience on our first quad (Higo) (2/2) Perspective on quad (Higashi) CLIC09, Oct T. Higo (KEK)
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Fabrication and measurement of RF components for CLIC study
5/7/2007 TS_CLIC_AB M.Taborelli, TS-MME High precision machining and metrology for structures: achievements and open questions M.Taborelli.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Main Parts of a Drilling Machine
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
Mechanical design and tests of the new X-band flange
Walter WuenschIARC CERN High-gradient accelerating structures for proton acceleration Linear collider development applied to cancer therapy.
CLIC09 WG4 RF Structure1 Engineering Perspectives on Quadrants (2) CLIC09 Workshop KEK Y.Higashi.
PRESENTED BY SUBMITTED TO ANUJ KUMAR SRIVASTAVA Mr. DEEPAK SHARMA ME-1 3 rd YEAR COORDINATOR AND FACCULTY ROLL NO IMSEC MILLING.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Some information from Nextef For poster session in IWLC T. Higo.
Automated Machining Adv. MMP
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
LCWS11 WG4 Fully featured accelerating structure engineering design
Project meeting , Geneva
UNIT-I SLOTTING MACHINES
TEST MODULE WG Cradles for CLIC module supporting system
Effort to identify the critical issues for high gradient
LumiCal mechanical design, integration with LDC and laser alignment
Tolerances: Origins, Requirements, Status and Feasibility
Disk-damped versus Quadrant-damped from engineering view point
Correct Procedures for Changing, Storing, and Maintaining Saw Blades
Presentation transcript:

Cell to cell alignment on GLC structures 24 Nov. 2014, CERN Toshi Higo (KEK) 2014/11/23CLIC Structure Review1

Contents Transition from GLC/NLC to CLIC Alignment target Alignment mechanism Machining Stacking/assembly Bookshelf Rotation alignment Bonding/brazing Bending 2014/11/23CLIC Structure Review2

Succeeding the technology of GLC/NLC to CLIC GLC/NLC : Targeting longer with wake field control CLIC: Focus to date on high-gradient Disk fabrication (KEK) Bonding (SLAC) CP (SLAC) VAC bake (SLAC) High power test 2014/11/233CLIC Structure Review

Key technologies are in hand in early 2000 except for proof of high gradient RDDS1 KX /11/234CLIC Structure Review

Precision machined Aligned to V-block Pre-bonding with V-block Diffusion bonding Precision brazing Straightening 2014/11/235CLIC Structure Review Quick glance at GLC/NLC

Target alignment tolerance Cell-to-cell alignment – A micron-level Bookshelving – 100 microradian Bending over a structure – 10 micron level – Can be corrected after bonding, as long as low- order smooth bow 2014/11/23CLIC Structure Review6

Alignment mechanism Disk stacking – Best with Outside diameter + reference V-block Short-stack based or long-stack at once – Others Alignment pin, Self fitting Less precise and worry about sticking during bonding Quad or half – Few experience 2014/11/23CLIC Structure Review7

Alignment mechanisms 2014/11/23CLIC Structure Review8 Self fitting for several micron Need care to keep stack Quad / Half several to 10μm? Stacking by a robot PSI How well? P. Craievich Swiss FEL HG 2013 Trieste OD and V-block for one micron level

Start with precision machining Outside diameter  R – Used for alignment with respect to beam axis – Reference for radial direction of cell shape – Can be realized with proper turning Chuck face self cut  Z – Mating surface flatness – Reference for axial direction of cell shape Other complex shape – Relative positioning accuracy in milling can be within a micron level unless re-chucking 2014/11/23CLIC Structure Review9

Start with precision machined cells 2014/11/2310CLIC Structure Review Keys are Outside diameter Flatness Both sides w.r.t. OD Parallelicity Notch for rotation

Precision machining 2014/11/2311CLIC Structure Review OD can easily and robustly be measured. Axial position can well be set by self cutting.

Stacking/assembly Stacking disks – OD reference – Removing air gap between disks – Rotational alignment by mark or key Alignment preservation until bonding process – During transportation – Keep with pushing to reference surfaces – Pre-bonding as needed with pushing to reference surface – Suppress mutual sliding by friction with axial force by bolts running through the stack 2014/11/23CLIC Structure Review12

2014/11/23CLIC Structure Review13 SLAC: Start with short-stack bonding Easy handling size 1—2 feet Full-stacked on V-block to confirm RF property Straightforward to check RF Difficult handling for >1m

1.3m stacking to bonding in /11/23CLIC Structure Review14 Hand stacking w.r.t. V-block checked by Microsense Extraction from stack jig Moving to furnace DB and braze

Cell alignment measured by gap sensors 2014/11/23CLIC Structure Review15 Gap between sensor and reference V-block Can measure cell offset and inclination

Vertical stack of  80 and 1.3m followed by diffusion bonding at 800 C 2014/11/23CLIC Structure Review16 Vertical stack followed by 800 degC diffusion bonding Cell-to-cell kept at 5 microns Bow changes 10 microns in smooth manner Bow of several 10 microns

Stacking followed by bonding at 900C for IHD1  80mm, 1.3m 2014/11/23CLIC Structure Review17

Cell stacking of IHD1 2014/11/23CLIC Structure Review18

Cell stacking and bonding 2014/11/23CLIC Structure Review19 Chose 60 deg stack Diffusion bonding at 900 degC Deviation from V-block by several microns Kink was not easy be corrected Bow of 10 microns

Cell alignment result of IHD1 2014/11/23CLIC Structure Review20 Cell-to-cell alignment was good;  <1 micron

Evolution toward 1.8m fabrication Cleanroom – to be free from dust migration Precise setting of base for stacking – precision V-block with fixed plane perpendicular to the V-block Careful stacking with – Microsenses to check floating from V – Autocollimator to check bookshelf and manual feedback to minimize assumed air gap Pre-bonding – to freeze the mutual movement of cells – at 150degC, 2.6MPa for 1 day with V-block Diffusion bonding – In vacuum furnace 2014/11/23CLIC Structure Review21

 45/  m stack with pre-bonding (PB) 2014/11/23CLIC Structure Review22 Rotation on furnace base Move 800km sitting on V-block DB in vac furnace Stack in cleanroom RDDS1 stacking with two Microsenses

1.8m DDS, RDDS, HDDS, …. made at IHI in ~1998 Precision stacking and pre-bonding 2014/11/23CLIC Structure Review23 Stacking Pre-bonding Cleaning

Improved cell-to-cell alignment in DDS3 and RDDS1 2014/11/23CLIC Structure Review24 Cell-to-cell within 1 microns,  <1micron RDDS1 after DB Smooth cell-to-cell but very big bow

Proof of wake field suppression in RDDS1 2014/11/2325CLIC Structure Review Precision cell Stacking + PB DB and shipping to SLAC Brazing ASSET Wake field confirmed Alignment confirmed

Bookshelf, rotation and bow Bookshelf – Until now we do not have any definite idea – We just try the air gap as small as possible – Parallelicity between two flat surfaces – OD perpendicular to the both surfaces – Check this OD profile with gap sensors running along beam axis Rotation – Mechanical reference, such as notch – Inscribed line by seeing optical device – Robotic stacking Bow – Smooth bow can bee corrected later. 2014/11/23CLIC Structure Review26

Less-friction smooth jig to press end surface during DB For less sticking with copper – Alumina ceramics  stick and make flare – Graphite  worry about fragile – Glassy carbon  good – Glass-like carbon coat GLASTIX KOTE  seems good Preserve good end surface – Needed for further assembly with good alignment – GLC/NLC used sheet brazing but not good from alignment point of view 2014/11/23CLIC Structure Review27

Care should be made on DB end surfaces to connect additional parts further 2014/11/23CLIC Structure Review28 Alumina ceramics → Graphite Scratch → Si 3 N 4 3 元系、 900 ℃ → sticking and makes flare → Glassy Carbon After DB Graphite Correction of flare Glassy carbon

Conclusion 1.Cells can be stacked w.r.t. mechanical reference with using outside diameter. 2.Cell alignment can be kept without slippage while handling, solid-phase bonding process. 3.One micron-level cell-to-cell alignment is feasible through man-made process. 4.Further mounting of beam-line parts on the bonded main body needs care on end surface quality 2014/11/23CLIC Structure Review29