NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.

Slides:



Advertisements
Similar presentations
New 5 MeV Dipole Magnet (“DL”) Planning Meeting May 23, 2014.
Advertisements

Magneto Rheological Device MRD180/1T Option 1: Direct flux density measurement Option 2: True temperature measurement Option 3: Double.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Problem # 1-6/5 mean core length = 52 cm length of air gap = 0.14 cm
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Magnetic Diagnostics for GLAST-III Tokamak M. A. Naveed, Aqib javeed and GLAST Team National Tokamak Fusion Programme Islamabad Pakistan IAEA First Technical.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
Status of the COBRA Magnet Wataru OOTANI MEG review meeting Feb. 3, 2003 PSI Switzerland.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Electric Machinery 王嘉帷 MA
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Focusing Lens for the SSR1 Section of PXIE Preliminary analysis of main options 3/13/2012I. Terechkine1.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
NuMI MINOS CM Review Magnetics Page 1 Magnetization options for the calibration module Jeff Nelson & Bob Wands Calibration module review (8/00) Simulations:
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
NSTX GMS-4 February 21, 2003 J. Menard Status of NSTX internal RWM/EF sensor system and electronics J. Menard for NSTX GMS-WG.
Design of DC septum magnets based on measurements and 3D calculation of an R&D septum magnet for Rapid Cycle Synchrotron of J-PARC Masao Watanabe, Accelerator.
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
CLAS12 Drift Chamber Prototyping
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
10/20/2015 TASD and MIND prototype and tests at CERN SPSC Oct Tests of TASD and MIND prototypes at CERN.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Design of wide aperture/thin septa of extraction system for J-PARC-50GeV ring 1. The outline of septa system for 50GeVring 2. Designing of thin septa and.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Alan Bross 6th Plenary Meeting of the IDS-NF
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
EURONu Collaboration Board,
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
The design schemes of the low field dipole magnets
SiD Solenoid Status and Plans
X-ray Pump-Probe Instrument
Presentation transcript:

NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 2 Outline Steel Purchase and Fabrication Steel bid package Finalizing the machining package Coil and Magnetics Initial test program »First magnetics data Fringe Fields: Data vs FEA Fixtures 4PP Plans

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 3 Steel Purchase Steel Advanced Procurement Plan and Specifications Approved by MINOS, consultants, PPD, and Procurement on 11/11/98 Steel bid package went public 12/1 Sent to 4 prequalified vendors –Ryerson (IL, MN) –USX (IN) –Bethlehem (IN) –Olympic (MN, IL) Open for bid for one month Purchase of 4 planes and options for up to 3 SM and Near Opening of bids expected the first week of 1/99 Selection and Best-and-Final to follow

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 4 Steel Purchase (Cont.) Machining bid package expected to be released in a week. Prequalified vendors –Ryerson (MN, IL) –Olympic (MN, IL) –SVF (IL) –Napco (IL) Same steps as in the steel procurement Final mill and fabricator will be selected based on lowest total cost (including transportation costs).

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 5 Magnetics Test Program 150 turn coil wrapped around the 1PP and powered on 10/29 Then A sense coil read out by an integrator monitored the flux Now 4 additional mini-sense coils Hall probe measurements of fields in air SensorWHTBRNORGVIOBLK # of turns15555 Area (m 2 )

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 6 (Cont.) Near-term goals –Obtain an absolute calibration of average field in a coil. –Estimate the effective gap span in the spates Future: Try to measure the inductance using an oscillator and mini- sense coil

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 7 First Magnetics Results

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 8 Fields in In Gaps, in Holes, and Beyond the Steel Used Hall probe to look at fields in the largest crack (~1/8”). The field was about 800Gauss Used Hall probe to look at fields in a 3/8” hole drilled through both plates. The field was about 60Gauss Used Hall Probe to look at fringe fields. Values ranged from

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 9 Measured Fields Some of the flux seems to be returning via the steel support beams.

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 10 Fringe Field Calculation in the Plane of the Steel

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 11 Fringe Field Calculation: Steel Layout

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 12 Fringe Field Calculation: 4cm in front of the steel plane

NUMI J. Nelson, Steel Update London MINOS Meeting 12/98 13 Thermal Data After 60min at 100A the core temperature (without cooling) was 170C in the core of the coil Our thermal models will be tested for accuracy in this extreme case

NUMI J. Nelson, Steel Update London MINOS Meeting 12/ PPTF Planned meeting for 1/15-16 at Fermilab The 15th will be devoted to issues related to steel, magnetics, steel installation and handling The 16th will be devoted to integration issues including »Mounting modules »Installation »Clear cable routing »Electronics support and locations »Readout requirements »4PP DAQ Planned meeting for 2/7 in LA MINOS Steel and Coil meetings at Fermilab »(almost weekly) Thursdays at 1:30 in 11SW