Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
BWI Hilton Hotel Thomas Sabol The Pennsylvania State University
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008 introduction overview proposal goals depth.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008.
Hyatt Regency Pittsburgh International Airport Hiro McNulty Structural Option AE Senior Thesis Spring 2006.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Background Current Structural System Alternate Structural Systems Structural Redesign Cost and Scheduling Final Recommendation Outline of Presentation

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Site – Arlington Gateway 22 Story Residential tower 13 Story Office Building 15 Story Arlington Gateway Hotel

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation General Information - 250,000 Square Feet Units - Estimated cost $40 million - Westin Hotel & Resort - Located within 5 min. of Reagan National Airport Amenities - Starbucks Cafe - Restaurant and Lounge - Ballroom and Meeting Facilities - Indoor Swimming Pool - Fitness Center and Spa

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Structural System psi Concrete In Slabs - Mix of 4000 to 6000 psi Concrete In Columns - Reinforced Cast-In-Place Concrete - 8” Two-Way Flat Slab Construction (Typical) Design Codes - BOCA 96 - ASCE 7-95 Lateral System - Moment Frames

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Alternate Systems for Mid-Rise Residential Structures - Hybrid Systems – Steel and Precast - Prestressed Precast Concrete - Metal Deck and Composite Steel Beams Staggered Truss SystemThe Girder-Slab System

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Alternate System Selection - Any site constraints? - How will it work with current floor plan? - Will it maintain the current 8’-9” story height? Staggered TrussGirder-SlabFlat-Slab Fire Resistance345 Light Weight552 Speed of Construction543 Adaptable to current layout

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Structural Redesign – The Girder-Slab System - Open Web Dissymmetric Beam (D-Beam) - Composite Construction - Uses precast hollow-core slabs

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Design Loads – Flooring System - Corridors – 100 psf ASCE 7-02 Minimum Design Live Loads - Private Rooms - 40 psf Dead Load - 8” Hollow Core Plank – 56 psf - Concrete Leveling Topping and Grout – 4 psf Additional Live Load - Partitions – 15 psf

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Design of Floor Members - Spreadsheet Created With Member Properties Checked Precomposite Deflections and Stresses Checked Composite Loads - 4 Standard Sizes to select from with 8” slab DB 8x35; DB 8x37; DB 8x40; DB 8x42 Checked Compressive Stress of Concrete Checked Stresses in Bottom Flange Checked Shear Capacity of Web

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Conclusions Dead load deflection becomes an issue - Limited clear span Max span of 16’ when used with 28’ plank Use of tree columns - Solutions D-Beams can be made with camber

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation How much will it cost? - D-Beams cost around 65 cents to fabricate - Standard wide flanges cost 35 cents to roll - Rising material and labor costs - 8” plank costs roughly $7.50/s.f. Structural SystemCost Per Square Foot Staggered Truss$25 CIP Flat-Slab$30 Girder-Slab$22 Assemblies Cost - Could save $2 million over CIP

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Scheduling - 15,000 s.f. per week - Superstructure constructed in just 15 weeks - Can place plank per day - Steel and plank erected at same time - 25% reduction in construction schedule

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Scheduling - Examples -Housing project at Princeton University superstructure finished in 4 weeks -8 story Drexel Dormitory superstructure finished in 31 days 2 5-story buildings with one crane Totaling 96,000 s.f.

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Recommendation – The use of Girder-Slab Technology - Reduced cost - Innovative use of steel - Reduces construction schedule over CIP - Reduces overall weight of structure by 40%

Arlington, Virginia Michael Gray Structural Option Arlington Gateway Hotel Introduction Background Current Structure Alternate Systems Structural Redesign Cost and Scheduling Recommendation Got Questions?