1 Gates Center Faculty Lunch: Jan. 19, 2005. 2 Outline Location, Size and Massing Architect Selection/Timeline The Interior Space : What do we want?

Slides:



Advertisements
Similar presentations
Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
Advertisements

CAMPUS MASTER PLAN. Goals To provide the up-to-date facilities that will enhance the quality of student life To redesign the campus so it reflects the.
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
BOE Goal: Study long-term facility needs All patrons invited to join Each building and special education co-op represented KIDS Committee met.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
2309 S 6 th St A Pictorial Tour. For sale Classic 100 year old home Estate Sale Over 1700 square feet Three + bedrooms Two baths Two car garage on extra.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
From Vision to Construction: Building Fund Raising Success ALADN Conference March 24, 2003.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Auxiliary Services CWU Board of Trustees February 4, 2010.
1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff.
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
An Information Commons for Graduate Social Science Students Digital Social Science Center: an Information Commons for Graduate Social Science Students.
Scenes from Parsons Hall Renovation
Blue Prints.
Graphic Language of Buildings Architectural Plans.
FLOOR PLANS APPLICATIONS OF TECHNOLOGY. WHAT IS A FLOOR PLAN?  A floor plan is drawing of a building with the roof removed as seen from above.  The.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Feasibility Study Update – April 23 th, Agenda and Goals 1.Review Design Values 2.Review Program Elements 3.Review Design Strategies 4.Review Next.
R ECENT T RANSIT O RIENTED D EVELOPMENT IN S AINT P AUL F INANCED BY THE P RIVATE M ARKET.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Uplands Walk Supportive Housing Community Consultation PUBLIC CONSULTATION WORKSHOP June 2012 UPLANDS WALK SUPPORTIVE HOUSING DESIGNING FOR SAFETY and.
Building Plans.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Amanda Smith Julie Sevelovitz Professor Brody ID 230, Section 01 Flexible Open Light Contemporary Glass Concept Images.
1 Gates Center Faculty Meeting: Nov. 3, Outline Preliminary designs Process/Timeline Other buildings What we need to think about.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
Our Annunciator Program Is the Most Effective Tool Available for Displaying Information to Large Groups. Annunciator Is... Fast & Easy To Use - By simply.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
TCC Facilities Study Facilities Planning Committee: Richard Lippmann, Doug Sacra, Mary Shahian, Ken Vona, Debbie Wilson, Chris Ziegler 1.
Managing Project Funding Changes David Troxtell Program Management Office March 14, 2007.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Agriculture and Industrial Technology Complex Capital Planning and Development Project Highlight.
Applying Factoring Chapter 10. Solve.  (x – 3)(x – 4) = 0.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.
Town Hall April 24, Exterior Building Design.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Assessment Committee Update to Faculty Senate February 17, 2016.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
From Closed Stacks to Data Visualization: the renovation of a 1970s library to incorporate digital literacy.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Lesson 29 Area of a Combined Figure. Get the Idea Sometimes, you need to find the area of a figure that is not a common shape. You can often do this by.
Old car vs. New Car The Choice The Sticker Price $ 5.2M The Cost of the Old Car “We are approaching the practical limit of functionality for that building”
NASHVILLE, TN Brandon Taylor, P.E.
PSU LIBRARY SYSTEM BUILDINGS,
Mornington Park Enhancements
Building Committee April 20th, 2016.
Architecture ~ Architectural Plans ~
Applications of Technology
Columbia University Manhattanville in West Harlem Mixed Use Academic Development June 2013.
Mission Hall Ask & Learn
STRAW MODELING GUIDELINES
Naming Opportunities (as of 9/29/18)
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
DBIA Manual of Practice
254 East Union Street Pre Development Plan Review
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Presentation transcript:

1 Gates Center Faculty Lunch: Jan. 19, 2005

2 Outline Location, Size and Massing Architect Selection/Timeline The Interior Space : What do we want?

3 SCS Building Committee Small committee Guy Blelloch (Chair) Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso ??? Everyone is encouraged to give input.

4 Proposal Design

5 A Hiccup Morewood West Campus Old Navy Building

6 Looks like the building will be K Gross Square Feet (GSF) Original Proposal = 150K Wean Hall = 290K (We have about ½) NSH = 155K With 220K we would still have to keep about 30K of Wean Hall. With 150K we would have to keep about 100K. Note: Assignable Square Feet (ASF) =.6 GSF

7 Exactly what parts of SCS move into the new building has not yet been decided

8 Deciding on the “Massing”

9 Some Constraints Maintain Alignment and create pathway

10 Some Constraints Preserve view of Oakland??

11 Some Goals Create a SCS quad with greenspace

12 Some Goals Indoor above grade Connection to NSH

13 Some Goals Easy Connection to the Cut

14 Some Goals Visitor’s entrance on Forbes

15 Some Goals Underground Parking

16 Some Constraints Accessible undergraduate “core”

17 Some Constraints Lots of light and nice views

18 Terrace even with cut (3 floors below) bridge Example Design

19 Connections

20 Undergraduate core

21 Greenspace and views

22 Selecting an Architect A Committee Headed by Christina Gabriel SCS: Peter Lee, Randy Bryant, Guy Blelloch Trustees: Lucian Caste, Oscar Harris Architecture: Gerard Damiani, Laura Lee FMS : Paul Tellers Request for Qualifications (sent and received) Select final 3-5 by February

23 Original Timeline Jan 05Jan 06Jan 07Jan 08Jan 09 architect selected schematic design construction docs groundbreaking completion our input into the design fundraising Probably a month or two behind

24 Interior Organization Many Questions Special Wishes Grouping Types of common spaces Conference room features and sizes Undergraduate/Research connecitivity Time Critical: How do these affect the layout

25 UC Berkeley 5 Levels of Detail

26 Function

27 Groups

28 Rectangles

29 Sketch

30 Floor Plan

31

32

33 UW: Allen Center

34

35 UCSD

36

37

38

39

40 Stata Center (MIT): Student Street

41