Doc.: 22-12-0063-00-000b Submission IEEE P802.22b Teleconferences June 2012 Chang-woo Pyo (NICT)Slide 1 IEEE P802.22 Wireless RANs Date: 2012-06-26 Authors:

Slides:



Advertisements
Similar presentations
Doc.: b Submission Comment Resolution related to Coexistence Mar Chang-woo Pyo (NICT)Slide 1 IEEE P Wireless RANs Date:
Advertisements

Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: b Submission b Network Configuration and Definitions Mar Chang-woo Pyo (NICT)Slide 1 IEEE P Wireless RANs Date:
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: b Submission Comment Resolution related to Frame Configuration Jan Chang-woo Pyo (NICT)Slide 1 IEEE P Wireless RANs.
Doc.: IEEE b Submission Nov., 2012 NICTSlide 1 Investigation on meeting the TVWS Spectrum Mask IEEE P Wireless RANs Date:
Doc.: IEEE /0220r0 Submission March 2005 Peter Ecclesine, Cisco SystemsSlide Liaison Report Atlanta Notice: This document has been prepared.
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
IEEE P802.22b Sep 2014 Plan & Report
IEEE P802.22b Teleconferences
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
IEEE WG Status Report – July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
System Requirements for the RASGCIM Amendment
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
On Coexistence Mechanisms
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE WG Opening Report – March 2007
On Coexistence Mechanisms
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGu Timeline Date: Authors: January 2005 January 2005
July 2012 Opening Report Date: Authors: July 2012
IEEE P802.22b May 2014 Plan & Report
IEEE WG Opening Report – July 2008
ADS Study Group Mid-week Report
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
September Opening Report
LB73 Noise and Location Categories
Liaison Report between and
IEEE White Space Radio Intended timeline
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
March Plenary Opening Report
November Plenary Opening Report
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November Opening Report
TGr Proposed Draft Revision Notice
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
System Requirements for the RASGCIM Amendment
IEEE P802.22b May 2014 Plan & Report
Beamforming and Link Adaptation Motions
[Preamble Design for IEEE b Segmentation]
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
RASGCIM Study Group Teleconference 2 Agenda
IEEE P802.22b July 2014 Plan & Report
IEEE P802.22b May 2014 Plan & Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
IEEE P802.22b Teleconferences
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

doc.: b Submission IEEE P802.22b Teleconferences June 2012 Chang-woo Pyo (NICT)Slide 1 IEEE P Wireless RANs Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s ). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material co ntained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IE EE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this co ntribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the develo pment process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva Mody as e arly as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator

doc.: b Submission Abstract This presentation is the agenda and meeting plan for the June 26, 2012 IEEE b teleconference. June 2012 Chang-woo Pyo (NICT)Slide 2

doc.: b Submission Agenda: Teleconference June 26, 9:00 PM-10:00 PM EDT Introduction (1min) IEEE patent policy (1min) PAR Scope and Purpose (2min) Issues to discuss –Selection Criteria Discussion b(50min) Presentation –If any Any other business Adjourn (1min) June 2012 Chang-woo Pyo (NICT)Slide 3

doc.: b Submission Introduction Welcome to the IEEE P802.22b June 26, 2012 teleconference Chairs and secretary –Chair: Chang-woo Pyo (NICT) –Vice-chair : –Recording Secretary: Zhang Xin(NICT) Recording your attendance –Send to: June 2012 Chang-woo Pyo (NICT)Slide 4

doc.: b Submission IEEE Patent Policy June 2012 Chang-woo Pyo (NICT)Slide 5

doc.: b Submission b Title, PAR Scope and Purpose Title –Enhancement for Broadband Services and Monitoring Applications PAR –This amendment specifies alternate Physical Layer (PHY) and necessary Medium Access Control Layer (MAC) enhancements to IEEE std for operation in Very High Frequency (VHF)/ Ultra High Frequency (UHF) TV broadcast bands between 54 MHz and 862 MHz to support enhanced broadband services and monitoring applications. The standard supports aggregate data rates greater than the maximum data rate supported by the IEEE Std This standard defines new classes of devices to address these applications and supports more than 512 devices in a network. This standard also specifies techniques to enhance communications among the devices and makes necessary amendments to the cognitive, security & parameters and connection management clauses. This amendment supports mechanisms to enable coexistence with other 802 systems in the same band. Purpose –The purpose of this amendment is to enhance the MAC and define an alternate PHY to accommodate broadband extensions and monitoring use cases for IEEE devices operating is VHF/UHF TV broadcast bands between 54 MHz and 862 MHz. June 2012 Chang-woo Pyo (NICT)Slide 6

doc.: b Submission Issues to discuss Selection Criteria Discussion b (50min) June 2012 Chang-woo Pyo (NICT)Slide 7

doc.: b Submission Any other business June 2012 Chang-woo Pyo (NICT)Slide 8

doc.: b Submission Teleconference Plan June 2012 Chang-woo Pyo (NICT)Slide 9

doc.: b Submission Face-to-Face Meeting in Sandiego June 2012 Chang-woo Pyo (NICT)Slide 10

doc.: b Submission Appendix: b Task Group Updated Timeline Task Group formedx Process documentxx Functional Requirementsxx Call for Proposals issuedx Selection Criteria xx x Technical/Informative Contributionsxxx Proposal presentations x Baseline proposal selected x Draft for 1 st letter ballot xx 1 st letter ballot completed x Comment Resolution x 2 nd letter ballot completed x Comment Resolution and recirculation x Sponsor ballot x Comment Resolution and recirculation xx RevCom/NesCom Approval xx Chang-woo Pyo (NICT)Slide 11 June 2012