Doc.: IEEE 802.11-10/0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 1 AP Connection Period in TDLS Date: 2010-03-16.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0578r0 Submission 2008 May Jarkko Kneckt, NokiaSlide 1 Forwarding in mesh containing MPs in power save Date: Authors:
Advertisements

Doc.: IEEE /0598r0 Submission May 2012 Steve Grau, Juniper NetworksSlide 1 Layer 3 Setup with Dynamic VLAN Assignment Date: Authors:
Doc.: IEEE /0497 r0 Submission May 2008 Allan Thomson, Cisco SystemsSlide 1 D2.0 Location Changes Summary Date: Authors:
Doc.: IEEE /0560r0 Submission May 2010 Ashish Shukla, MarvellSlide 1 TDLS TPK Handshake Date: Authors:
Submission doc.: IEEE ai May 2012 InterDigital, KDDI, Nokia, Huawei, Intel, Qcomm Slide 1 Proposed SFD Text for ai Passive Scanning.
Doc.: IEEE /1169r1 Submission January 2012 Jihyun Lee, LG ElectronicsSlide 1 FILS Association Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE Submission Nov 2013 Betty Zhao et. al., HuaweiSlide 1 Service Discovery with Association Date: Authors:
Doc.: IEEE ai Submission Paul Lambert, Marvell TGai Discovery Proposal Author: Abstract Short high-level proposal for discovery techniques.
Doc.: IEEE /0285r0 March 2013 Submission Resource Allocation Frame Format for RAW- based Medium Access Date: Authors: Chittabrata Ghosh,
Doc.: IEEE /1054r0 Submission Sep Santosh Pandey (Cisco)Slide 1 FILS Reduced Neighbor Report Date: Authors:
Doc.: IEEE /0089r0 Submission Listen interval update Jan 2013 Slide 1 Date: Authors: Jinsoo Choi, LG Electronics.
Doc.: IEEE /0256r0 Submission March 2010 Zhou Lan NICTSlide 1 Proposal of Synchronized Quiet Period for Incumbent User Detection Date: 2010-March.
Submission doc.: IEEE ai March 2012 InterDigital, KDDI, Nokia, Huawei, IntelSlide 1 Proposed SFD Text for ai Passive Scanning Improvement.
Doc.: IEEE /0880r2 Submission Scheduled Trigger frames July 2015 Slide 1 Date: Authors: A. Asterjadhi, H. Choi, et. al.
Doc.: IEEE /0897r0 SubmissionJae Seung Lee, ETRISlide 1 Active Scanning considering Operating Status of APs Date: July 2012.
Doc.: IEEE /2797r00 Submission Oct 2007 Jiyoung et al. Path Selection and Path Switch Mechanism Notice: This document has been prepared to assist.
Submission doc.: IEEE 11-12/0553r4 May 2012 Jarkko Kneckt, NokiaSlide 1 Response Criteria of Probe Request Date: Authors:
Submission doc.: IEEE /1034r4 September 2012 Jeongki Kim, LG ElectronicsSlide 1 Enhanced scanning procedure for FILS Date: Authors:
Submission doc.: IEEE ai September 2012 Lei Wang, InterDigital CommunicationsSlide 1 Ad Hoc Discussions of ai Passive Scanning during.
SubmissionSlide 1Dwight Smith, Motorola Mobility Nov 2012doc.: IEEE 11-12/1332r0 Other Service Discovery Concepts Date: Authors:
Submission doc.: IEEE ai May 2012 Lei Wang, InterDigital CommunicationsSlide 1 Proposed SFD Text for ai AP/STA Initiated FILS Optimizations.
Doc.: IEEE /2215r4 Submission August 2007 Ganesh Venkatesan, Intel CorporationSlide 1 Proposal –Radio Resource Measurement Capability Enabled.
Doc.: IEEE /0175r2 Submission June 2011 Slide 1 FCC TVWS Terminology Date: Authors: Peter Ecclesine, Cisco.
Doc.: IEEE /xxxxr0 July 2011 Padam Kafle, Nokia Submission Simplification of Enablement Procedure for TVWS Authors: Date: July 18, 2011 NameCompanyAddressPhone .
Submission doc.: IEEE /0615r0 May 2012 Sudheer Grandhi, InterDigital CommunicationsSlide 1 Considerations for early NAV indication Date:
Doc.: IEEE /0072r0 Submission January 2009 Slide 1 Proxy ARP Issue for Direct Link Setup Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /618r0 Submission August 2002 Bobby Jose,Slide 1 RRM Requirements discussion on CCA Bobby Jose.
Doc.: IEEE /0232r0 Submission February 2009 Meiyuan Zhao, IntelSlide 1 Suggestions to Clean Up Peering Management Frames Date:
Doc.: IEEE /0433r0 SubmissionSlide 1 Date: Presenter: MAC Protocol to Support Dynamic Bandwidth for aj (60GHz) Xiaoming Peng.
Doc.: IEEE /1313r2 Submission November 2013 Stephen McCann, BlackberrySlide 1 TGaq Mini Tutorial Date: Authors:
Doc.: IEEE /0896r0 SubmissionJae Seung Lee, ETRISlide 1 Probe Request Filtering Criteria Date: July 2012.
Doc.: IEEE /0041r1 AP Location Capability January 2007 Donghee Shim et alSlide 1 AP Location Capability Notice: This document has been prepared.
Doc.: IEEE /0409r5 Submission May 2012 Shoukang Zheng et. al, I2R, SingaporeSlide 1 Supporting Low Power Operation Date: Authors:
Submission doc.: IEEE /0407r1 March 2012 Sudheer Grandhi, InterDigital CommunicationsSlide 1 Considerations for PSMP Enhancements Date:
SubmissionJoe Kwak, InterDigital1 Retrieving MIB contents from STA’s Joe Kwak, Marian Rudolf InterDigital doc: IEEE /554r0July 2003.
Doc.: IEEE /xxxr0 Submission Nov Jonathan Segev (Intel)Slide 1 Rapid Scanning Procedure Date: Authors:
Doc.: IEEE /0618r0 Submission Listen interval for sensor devices May 2012 Slide 1 Date: Authors: Jinsoo Choi, LG Electronics.
Doc.: IEEE /0294r2 Submission March 2012 Jonathan Segev (Intel)Slide 1 Active Scanning Reply Window Date: Authors:
Submission doc.: IEEE /0336r0 March 2016 Xiaofei Wang (InterDigital)Slide 1 Relay Improvement: Regarding CID 9058 & 9075 Date: Authors:
Month Year doc.: IEEE yy/xxxxr0 May 2012
Proposed SFD Text for ai Link Setup Procedure
Spec text clarification for FDMA
September 2008 doc.: IEEE /1003r0 August 2010
Multiple Locations Channel Availability Query
IGTK Switch Announcement
Peer Power Save Mode for TDLS
Multi-band Discovery Assistance
Improvement to TWT Parameter set selection
AP Location Capability
Proposed resolution of CID 3518
Proposed resolution of CID 3518
AP Power Down Notification
WUR Mode Operation Procedures
Peer Power Save Mode for TDLS
TGaq Mini Tutorial Date: Authors: November 2013
Fast Session Transfer Session Setup in TVWS
Off-channel selection
Peer Power Save Mode for TDLS
CR for CID 1115 Date: Authors: May 2019
Scheduled Peer Power Save Mode for TDLS
Timing Measurement Date: Authors: Jan 2010 November 2007
AP Connection Period in TDLS
Month Year doc.: IEEE yy/xxxxr0 May 2012
Use of EAPOL-Key messages
Location Capability Negotiation
Multi-band comments resolution
1MHz mode PHY based power savings
Proposal for Event Log Authors: Date: March 2006 Month Year
Timing Measurement Date: Authors: Jan 2010 November 2007
CR for CID 1115 Date: Authors: May 2019
Presentation transcript:

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 1 AP Connection Period in TDLS Date: Authors:

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 2 Abstract This presentation contains the details of the proposed change for the comment submitted by Sudheer Grandhi in the first IEEE P802.11z 15 day recirculation Sponsor Ballot.

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 3 Need for AP Connection in TDLS Applications that need Internet access –Internet Gaming –Digital Rights Management –Relevant Information download –Context/Content based Advertisements –Future Applications ? To support the above Applications TDLS needs –AP connection times/periods for internet access –Especially during “Off Channel” operation

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 4 AP Connection Period Function AP Connection period “Capability” AP Connection period “Setup” (and “Cancellation”) AP Connection Period “Activity”

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 5 AP Connection Period Capability Capability information exchange –Via TDLS Setup Request/Response messages –Include capability indication in the extended capabilities A TDLS STA may try to setup an AP Connection period schedule with a peer TDLS STA only if such a capability is indicated as supported

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 6 AP Connection Period Setup : Procedure AP Connection periods can be setup by –TDLS peers exchanging relevant information –TDLS Request/Response message exchange Relevant information can include –AP connection times or periodicity –AP connection durations –Start Time and End Time –Cancellation

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 7 AP Connection Period Setup : Options Option1: Modify/Use existing TDLS messages for eg. –TDLS Setup –TDLS Peer PSM –TDLS Channel Switch Option2: New TDLS messages –TDLS AP connection period Request message –TDLS AP connection period Response message

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 8 AP Connection Period Setup : Option1 TDLS Setup messages modified to include AP Connection Period information TDLS Peer PSM messages( two possibilities) –Modified to include AP Connection Period information –Used as is but make specification clear to allow AP connection during Peer PSM “non-Awake” time TDLS Channel Switch messages( two possibilities) –Modified to include AP Connection Period information –Used as is but make specification clear on how AP connection may be achieved

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 9 AP Connection Period Setup : Option 2 TDLS AP connection Period Request message –Sent either through AP or directly to TDLS peer –Includes information such as: AP connection periodicity, Duration, Time reference, End Time, Cancellation TDLS AP connection Period Response message –Sent either through AP or directly to TDLS peer –Includes information: Accept/Reject, Status code.

doc.: IEEE /0247r1 Submission AP Connection Period Activity If TDLS STA on “Base Channel” –Connect/communicate with AP If TDLS STA on “Off Channel” –Switch to “Base Channel” –Connect/communicate with AP –Switch back to “Off Channel” Communicating with AP during TDLS –TDLS STA establishes and determines how data is sent and received during AP Connection periods based on AP capabilities –Any available MAC mechanisms may be used when AP supports them eg. PS-poll, Reverse Direction etc. March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 10

doc.: IEEE /0247r1 Submission Proposed Change (1/4) Add the following section: AP Connection Period in TDLS A TDLS STA shall be able to establish AP connection periods during TDLS operation to access the distribution system or the Internet to support applications such as Internet gaming, digital rights management and context aware information or advertisements download. A TDLS STA shall be able to setup such AP connection periods by negotiating with peer TDLS STAs. A TDLS STA shall determine how data is sent and received during AP Connection periods based on the capabilities supported by the AP. Any available MAC mechanisms when supported by the AP may be used during AP connection periods eg. PS-poll, Reverse Direction Grant etc.. A TDLS STA if on an off channel shall switch to the base channel to communicate with the AP during its AP connection period and return to the off channel before the AP connection period expires. March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 11

doc.: IEEE /0247r1 Submission Proposed Change (2/4) Update specification with text to “Use as is” or “Modify” for AP Connection purposes in Section –TDLS Setup messages –TDLS Peer PSM messages –TDLS Channel Switch messages March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 12

doc.: IEEE /0247r1 Submission Proposed Change (3/4) Insert the following two lines in Table 7-57 in Section : –12 TDLS AP Connection Period Request –13 TDLS AP Connection Period Response Change Reserved Action field values to “ ” in Table 7-57 March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 13

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 14 Proposed Change (4/4) Add Section: TDLS AP Connection Period Request frame format –Include information fields: AP connection periodicity, Duration, Time reference, End Time, Cancellation –Sent either through AP or directly to TDLS peer Add Section: TDLS AP connection Period Response frame format –Include information fields: Accept/Reject, Status code –Sent either through AP or directly to TDLS peer

doc.: IEEE /0247r1 Submission March 2010 Sudheer Grandhi, InterDigital Communications, LLCSlide 15 Summary AP Connection Periods during TDLS operation needed to support applications that require internet access. Two options/approaches suggested for supporting such a mechanism: –Option (1) Use/Modify existing messages –Option (2) New messages