Global Design Effort Accelerator Systems EDR Kick-Off Meetings Preparation Nick Walker.

Slides:



Advertisements
Similar presentations
Facilitated by Joanne Fraser RiverSystems
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Module 8: Government Required Reports
PROJECT RISK MANAGEMENT
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Fundamentals of Information Systems, Second Edition
Project Management Session 7
Chapter 3: The Project Management Process Groups
Introduction to ARA’s Proposal Resources Don Cole
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Project Management Basics
Part II Project Planning © 2012 John Wiley & Sons Inc.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
ELECTRONIC SYSTEMS ENGINEERING TECHNOLOGY TEXAS A&M UNIVERSITY Innovating tomorrow’s products and systems today Dr. Joseph A. Morgan, D.E., P.E.
What is Business Analysis Planning & Monitoring?
Topic 2- 1ICT 327 Management of IT Projects Semester 1, 2005 Topic 2 Project Planning & Initiation Schwalbe: Chapter 3 Compiled by Diana Adorno and contributions.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
BUS 4017 Project Management HR Wk 6. Agenda Housekeeping Marking for the past 6 weeks. Mid term test review: WBS- new Application WBS Quiz review Decision.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
+ Facts + Figures: Your Introduction to Meetings Data Presented By: Name Title Organization.
Mcis Project News Richard Goodwin Nigel Williams 20 th May 2008.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
Lecture 4 Title: The Scope Management Plan
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
Develop Project Charter
SOFTWARE PROJECT MANAGEMENT
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Reviews mae, fall 11. Review What: – Have skilled people assess your work –Requires that you have work product that is reviewable Why: – Find problems.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
CI R1 LCO Review Panel Preliminary Report. General Comments –Provide clear definition of the goals of the phase (e.g. inception), the scope, etc. in order.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Bus 1040 Project Management Week 6,. Agenda Housekeeping Marking for the past 6 weeks. WBS Quiz review Decision Matrix Work through the book case we will.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Global Design Effort RTML KOM Close-out Ross, Walker.
SDOT IS Project Intake Process
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
TK2023 Object-Oriented Software Engineering
Copyright All Rights Reserved by
Report on plan to produce an Engineering Design Report
Presentation transcript:

Global Design Effort Accelerator Systems EDR Kick-Off Meetings Preparation Nick Walker

Global Design Effort Quick Intro When are the meetings Review the charge What this (25/7) meeting is for Tentative agendas: –E- sourceJohn Sheppard (for Brachmann) –E+ souceJohn Sheppard (himself and Clarke) –DRNick Walker (for Andy Wolski) –RTMLnone –BDSAndrei Seryi Discussion of who does what over next weeks –Organisation issues

Global Design Effort When/Where are the AS meetings? RTML FNALTenenbaumSolyak e- src SLACBrachmann e+ src DaresburyClarkeSheppard BDS SLACSeryi GDE FNAL DR5-7.11DaresburyWolski

Global Design Effort (Formal) Charge The EDR, to be completed in 2010, will contain an updated ILC value estimate and a project execution plan. Prioritization of Engineering Design Activities to be done in support of the EDR will be based on risk mitigation, cost reduction and project preparation. The EDR will be based on an assessment of the RDR technical content and its value estimate. We believe that the RDR vale estimate has sufficient detail to –Permit trend analysis for the cost reduction/optimization and –Give guidance for the R&D and industrialisation that must accompany the engineering design process of the EDR. The primary focus of the EDR kick-off meeting is to consider the planned EDR design and industrialisation effort.

Global Design Effort “Plain English” Goal #1 Review the design –Does it work? (better: is the performance acceptable) –Are there still concerns on performance? (this will touch of risk assessment and R&D plans) Review the cost estimate –Examine each element in Cost Engineers Value Matrix (Tech./Global Group versus Area System) Check for inconsistencies (numerology, unit prices) Identify cost items that are ‘questionable’ –Cost metrics from existing machines Quantify the “Engineering Value” (= worth/cost) –Identify CFS drivers (requirements) –Attempt to evaluate performance/cost derivatives –Critically review each design decision wrt to its cost impact (derivative) Are the cost increments / performance gains justified

Global Design Effort “Plain English” Goal #2 Make a plan for the next three years that includes the known ‘alternative designs’ –Clearly define achievable (realistic) scope –Identify resources problems (many!) –Identify ACD issues Why do we have them? (lower cost? Better performance?) What needs to be done to see if they are truly beneficial (selection criteria)

Global Design Effort “Plain English” Goal #3 Work package definitions. –This links up with goal #2 via planning. –Developing a WBS (rows in a Gantt chart) should yield Work Packages Develop (for example: BDS,DR) lists –Into a structured plan or WBS –Need to massage these into the correct structure to deliver our goals for the EDR –In addition, complexity of WPs must reflect available resources. These meetings can only be the start of this activity –An additional iteration will likely be required once key well-defined milestones/deliverables are identified.

Global Design Effort What is this (informal) meeting for Begin to prepare the meetings –Eckhard Elsen (with Max) are responsible with ‘hosts’ Agendas – do they cover the charges? Logistics: –Who must physically attend –Who must attend but can do so via WebEx? –Time shift (two region bias) –Action items for next weeks Running up to meetings themselves. Good opportunity to raise questions! –Don’t expect to answer them all today, however.