Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.

Slides:



Advertisements
Similar presentations
Ian Kirkman and Graham Cox July 29 th EMMA commissioning shifts so far June 21 st, 22 nd, 23 rd and July 12 th, 13 th, 14 th, 15 th “Analogue” BPM.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
The EMMA Turn-by-Turn BPM System A. Kalinin ASTeC Daresbury Laboratory STFC EMMA Commissioning Workshop Daresbury Laboratory, 21 May 2009.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Analogue BPM data analysis Calibration & resolution results.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
J. Pfingstner, LCWS13 Jitter and ground motion studies November 13, 2013 Beam jitter at ATF2: A. Source localisation and B. Ground motion correlation Jürgen.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
Calibration summary Nov-Dec 09 R Apsimon. 10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information.
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Simultaneous Position Measurements of Protons and Anti-Protons in the Tevatron R. K. Kutschke †, J. Steimel, R.Webber, S. Wolbers, Fermilab*, Batavia,
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
Specifications of Tevatron BPM Upgrade Jim Steimel.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
BPM Developments at Daresbury Laboratory A. Kalinin Ultra Bright Electron Sources Workshop The Cockcroft Institute, Daresbury,
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Path Length Difference Study R. Apsimon. Assumptions Assume input signals vary sinusoidally (good approximation after BPF). Input signal arrives at a.
Roundup of Week at ATF Mikey Davis 19 April /26.
Momentum and Momentum Spread Measurements
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
March Trip Plan Mikey Davis 01 March /7.
Intra-Pulse Beam-Beam Scans at the NLC IP
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Status of Phase Feedforward Tests
Beam-Based Alignment Results
Feed forward orbit corrections for the CLIC RTML
VELA BPMs Alex Brynes.
Linac Diagnostics Commissioning Experience
Presentation transcript:

Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005

Contents Jitter Monitor Hardware Overview Measurement procedure March 2005 data taking Status of Analysis –Resolution studies Plan for current run

Jitter Monitor Schematic

Jitter Monitor Hardware

Measurement Procedure Synchronisation –Sum and Difference signals must be aligned to ~10 ps –Dedicated data run for each processor at each pick-up with large beam displacement to suppress common-mode –Each processor will have a general delay value due to difference in cable lengths and intrinsic delay on board

Measurement Procedure 2 Time align signals using synchronisation delay Calculate position as Calibrate position using correctors and known displacements

Overview of March 2005 data taking Four jitter monitor processors used at BPMs 8,10,13 in ExtLine, and BPMs 26,27 in DR. Data taken during three shifts : –Single-bunch mode: synchronisation data for 8,13,26,27 and calibration for 26,27 –Multi-bunch: synchronisation for bpm10, calibration for 8,10,13 and resolution –Single-bunch mode: 8,13 SB calibration. 26,27 to 8,13 correlation studies varying y, y’, E. –Data taken with all quads off after QD6X.

Resolution Assuming the BPM thermal noise to be small the resolution will be dominated by discretisation noise of scopes. 3 BPM method: –Use position measured in two BPMs to predict position in third BPM. –Assuming noise of all three BPMs to be the same, resolution is determined by std of residuals divided by geometric factor.

Position in Extraction Line

Resolution

Angle-angle correlation With all quads off between three BPMs the trajectory should form straight line!

Resolution studies (cont) General increase in resolution as function of bunch number along train + lack of angle-angle correlation suggest that residuals contain contribution from jitter. Can not be sure how the jitter propagates between BPMs. Therefore 3 BPM method can not be used for discretisation resolution.

Plan for parasitic work this run Plan to measure resolution by hooking up two processors in series on one set of pick-ups. Method eliminates bunch jitter from the calculation leaving only dicretisation noise. By making measurements at different scope scales can also measure the resolution dependence on number of discretes

Summary Jitter monitor analysis still in progress. Once present problems encountered with resolution are solved, there is still lots of interesting data to analyse from March. Plan to take data parasitically to measure the 2- BPM resolution in this visit.