Congestion Management with Electrical Vehicles ECN PowerMatcher Team
Cluster-level Behavior in Reality
Plug-in Electric Cars and Distribution Networks LV grid MV grid Distribution station
Available Network Capacity II Source: ITM Project
Available Network Capacity III Source: ITM Project
Plug-in Electric Cars and Distribution Networks LV grid MV grid Distribution station
Available Network Capacity IV Source: ITM Project
Intelligent Charging Results Substation Load: 1)Base load: the load of the substation without electric vehicles. 2)No control: the load of the substation with uncoordinated charging of the vehicles. 3)PowerMatcher: the load of the substation with PowerMatcher coordinated charging.