ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.

Slides:



Advertisements
Similar presentations
PROJECT RISK MANAGEMENT
Advertisements

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Systems Analysis and Design 9th Edition
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Project Management Session 7
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 5: Project Scope Management
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Project Scope Management
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Initiating and Planning Systems Development projects
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Developing a result-oriented Operational Plan Training
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
DR Kick-Off Meeting CI, 5 Nov 2007 Global Design Effort 1 Damping Rings Update (after the RDR) Andy Wolski.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Global Design Effort Accelerator Systems EDR Kick-Off Meetings Preparation Nick Walker.
Exercising, Maintaining and Reviewing BCM Arrangements ERMAN TASKIN
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Information Technology Project Management, Seventh Edition.
Global Design Effort RTML KOM Close-out Ross, Walker.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC Project Management Status
Report on plan to produce an Engineering Design Report
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
The DBD: Outline and Scope
The EDR phase Discussion Session
Second Avenue Subway Project Execution Strategy
Presentation transcript:

ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool

ILC 2007 Global Design Effort 2 The EDR Task Force: Charge To study two or more possible technical project structures (WBS) for the EDR phase of the ILC. The WBS models should be orientated around a central project management structure, led by a single project manager. The WBS should break down into individual Work Packages, suitable for distribution to interested parties, who would then take on responsibility for the deliverables of that Work Package. The WBS models must have clear lines of responsibility and reporting, up to the top-level management. The WBS should naturally support (and drive) the ILC R&D programme, which must be an integral part of the project.

ILC 2007 Global Design Effort 3 EDR Task Force: Initial thoughts The primary goal of GDE activities in the Engineering Design Phase of the ILC project will be to advance (i) the technology, (ii) the design and (iii) the construction plans for ILC, to the point where approval for construction can be sought. In ~2010, an Engineering Design Report (EDR) will be produced: the EDR will explain the capabilities of the technology at that time, will detail the design of the machine and the construction plans, and will present an updated value estimate. The purpose of the EDR will be to facilitate: 1.formal international negotiations at government level on (a) siting, (b) funding, (c) organization and (d) execution of the ILC project; 2.preparations for construction on a timescale consistent with the start of construction in ~2012. Preparations for construction will include the production of final engineering designs of critical components, procurement, and (once the site is chosen) site preparation.

ILC 2007 Global Design Effort 4 EDR Task Force: Initial thoughts The primary technical output from the activity in the Engineering Design Phase will be an integrated engineering design of the accelerator. This design must satisfy the energy, luminosity, and availability goals outlined in the ILC RDR, and must also be consistent with the value estimate presented in the RDR.

ILC 2007 Global Design Effort 5 Types of activity in the ED phase 1.Basic R&D is needed to demonstrate that all major accelerator components can be engineered to meet the ILC performance specifications. 2.R&D is needed into alternative solutions that will mitigate remaining technical risks. Any proposal to adopt an alternative solution as a new baseline must include costs information and a plan for the necessary technical development. 3.An overall design must be produced, with sufficient completeness and detail to allow machine construction to start within 3 years, given project approval and funding. 4.Where several options exist for high-technology components needed in large quantities, a selection between the options must be made to allow focused industrialization efforts. 5.A comprehensive value-engineering exercise must be conducted, aimed at reducing cost and achieving design consistency.

ILC 2007 Global Design Effort 6 Types of activity in the ED phase 6.A complete value cost estimate for the machine must be provided, including a funding profile consistent with the project schedule. (Site-specific details will not be decided on the timescale of the EDR, and may be excluded or handled separately from other items in the value cost estimate). 7.A project execution plan must be produced, including a realistic schedule. The project plan must include plans for industrialization of high-volume components in each of the participating regions. 8.Designs must be produced for facilities shared between different “area systems”, and for site-specific infrastructure. The designs must include the level of detail needed for regions to estimate the cost to host the machine, taking into account local impact, infrastructure needs, and surface and underground footprints. 9.Regions will require information to evaluate project technical and financial risks in support of a bid to host the machine. All necessary information must be provided.

ILC 2007 Global Design Effort 7 Types of activity in the ED phase Damping rings studies in the engineering design phase will involve all the above types of activities to some extent… … but the key activities will fall into the categories of: 1.Basic R&D 2.R&D into alternative solutions 3.Overall design work

ILC 2007 Global Design Effort 8 Goals for this Working Group We need to consider how the damping rings activities could be structured into Work Packages, taking into account: –the deliverables (for the EDR, and the R&D programme…); –the resources likely to be available; –the schedule (target date for the EDR); –existing and proposed activities. One approach would be to structure today's discussion around the development of a plan for producing the damping rings section of the EDR, including schedule and resources, and the R&D plan. We have to make assumptions about resources and the outcome of the R&D.

ILC 2007 Global Design Effort 9 Goals for this Working Group Once we have a realistic plan (given a set of stated assumptions), we can try to define sensible Work Packages, bearing in mind requirements for reporting and communication. The plan, and the Work Package definitions, can then be provided as "input" to the EDR Task Force. Whatever we do here will be a first pass, and will need further iterations before firm agreements are made. It is expected that ultimately, agreements will be made on deliverables, reporting procedures etc. through a set of Memoranda of Understanding between the GDE and individual laboratories.

ILC 2007 Global Design Effort 10 Zeroth-order iteration…

ILC 2007 Global Design Effort 11 Zeroth-order iteration…

ILC 2007 Global Design Effort 12 Zeroth-order iteration…

ILC 2007 Global Design Effort 13 Tasks have complex inter-relations

ILC 2007 Global Design Effort 14 Today's schedule 9:00 – 10:30Question-and-answer, and open discussion with members of the EDR Task Force. Brief overview of resources and activities. 11:00 – 12:30Overview of damping rings R&D Plan. 14:00 – 15:30Develop a plan for damping rings studies in the EDR phase: –Agree on a list of tasks and deliverables. –Make a first pass on resource requirements and schedule. 16:00 – 18:00Continue developing a plan for damping rings studies. –Identify potential investigators; –Identify potential Work Packages. Write up results of the working group discussions. –Include a statement of the assumptions made (which will be "risks" in the plan for the engineering design phase).

ILC 2007 Global Design Effort 15 Resources (possibly) available

ILC 2007 Global Design Effort 16 Resources (possibly) available

ILC 2007 Global Design Effort 17 Resources (possibly) available

ILC 2007 Global Design Effort 18 Resources (possibly) available

ILC 2007 Global Design Effort 19 Questions for the EDR Task Force 1.What guidelines can we use for identifying potential work packages? For example: type of activity and scope, number of participants, location of participants… Is "optics and beam dynamics" a work package, or are "lattice design", "impedance modelling" etc. separate work packages? How do we decide? 2.To what extent should work packages be arranged by area system or by technical/global system? For example: is "damping ring magnet design" a work package? or is "magnet design" a work package, including design of the damping ring magnets?