Your university or experiment logo here User Board Glenn Patrick GridPP20, 11 March 2008.

Slides:



Advertisements
Similar presentations
RAL Tier1: 2001 to 2011 James Thorne GridPP th August 2007.
Advertisements

User Board - Supporting Other Experiments Stephen Burke, RAL pp Glenn Patrick.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
Applications Area Issues RWL Jones GridPP16 QMUL 28 th June 2006.
Your university or experiment logo here User Board or User Bored? Glenn Patrick GridPP19, 29 August 2007.
05/07/00LHCb Computing Model Meeting (CERN) LHCb(UK) Computing Status Glenn Patrick Prototype (Tier 1) UK national computing centre Bid to Joint.
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
Jan 2010 Current OSG Efforts and Status, Grid Deployment Board, Jan 12 th 2010 OSG has weekly Operations and Production Meetings including US ATLAS and.
Oxford Jan 2005 RAL Computing 1 RAL Computing Implementing the computing model: SAM and the Grid Nick West.
Grid Computing for UK Particle Physics Jeremy Coles GridPP Production Manager Monday 3 rd September CHEP 2007, Victoria, Canada.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
D. Britton Collaboration Board Meeting David Britton 16/Jul/07.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
08/06/00 LHCb(UK) Meeting Glenn Patrick LHCb(UK) Computing/Grid: RAL Perspective Glenn Patrick Central UK Computing (what.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Operation of CASTOR at RAL Tier1 Review November 2007 Bonny Strong.
RAL Tier 1 Site Report HEPSysMan – RAL – May 2006 Martin Bly.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
Tier1 Status Report Martin Bly RAL 27,28 April 2005.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Tier1 Report Cambridge 23rd October 2006 Martin Bly.
GridPP3 project status Sarah Pearce 14 April 2010 GridPP24 RHUL.
CERN IT Department CH-1211 Genève 23 Switzerland t Tier0 Status - 1 Tier0 Status Tony Cass LCG-LHCC Referees Meeting 18 th November 2008.
GridPP3 Project Management GridPP20 Sarah Pearce 11 March 2008.
Project Management Sarah Pearce 3 September GridPP21.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Your university or experiment logo here Storage and Data Management - Background Jens Jensen, STFC.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Southgrid Technical Meeting Pete Gronbech: 26 th August 2005 Oxford.
11 March 2008 GridPP20 Collaboration meeting David Britton - University of Glasgow GridPP Status GridPP20 Collaboration Meeting, Dublin David Britton,
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 8 February 2007 Outline Exec 2 Summary Grid status High level.
Tier1 Site Report HEPSysMan, RAL May 2007 Martin Bly.
Dan Tovey, University of Sheffield User Board Overview Dan Tovey University Of Sheffield.
25th October 2006Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar UK Physics Meeting Queen Mary, University of London 25 th October 2006.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Summary of RSG/RRB Ian Bird GDB 9 th May 2012
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
User Board Input Tier Storage Review 21 November 2008 Glenn Patrick Rutherford Appleton Laboratory.
GridPP Dirac Service The 4 th Dirac User Workshop May 2014 CERN Janusz Martyniak, Imperial College London.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Tier1 Andrew Sansum GRIDPP 10 June GRIDPP10 June 2004Tier1A2 Production Service for HEP (PPARC) GRIDPP ( ). –“ GridPP will enable testing.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Your university or experiment logo here Tier1 Deployment Steve Traylen.
LCG Storage Accounting John Gordon CCLRC – RAL LCG Grid Deployment Board September 2006.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
UK Tier 1 Centre Glenn Patrick LHCb Software Week, 28 April 2006.
Rutherford Appleton Lab, UK VOBox Considerations from GridPP. GridPP DTeam Meeting. Wed Sep 13 th 2005.
The WLCG Service from a Tier1 Viewpoint Gareth Smith 7 th July 2010.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
4 March 2008CCRC'08 Feb run - preliminary WLCG report 1 CCRC’08 Feb Run Preliminary WLCG Report.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
UKI-LT2-RHUL ATLAS STEP09 report Duncan Rand on behalf of the RHUL Grid team.
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
Dissemination and User Feedback Castor deployment team Castor Readiness Review – June 2006.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
LCG Service Challenge: Planning and Milestones
Update on Plan for KISTI-GSDC
UK GridPP Tier-1/A Centre at CLRC
Olof Bärring LCG-LHCC Review, 22nd September 2008
LHCb(UK) Computing Status Glenn Patrick
Presentation transcript:

Your university or experiment logo here User Board Glenn Patrick GridPP20, 11 March 2008

U B 2 Tier 1: Non-Grid Access Classical PBS/qsub access to Tier 1 restricted on 21 Feb. Access to UI also restricted. List of exclusions agreed through UB. ATLAS4identifiers BABAR9 CALICE2 CMS7 Dteam1 LHCb4 MINOS24(3 months after working Castor reduces to 8) TOTAL51 Includes some AFS accounts. Classical PBS/qsub access to Tier 1 restricted on 21 Feb. Access to UI also restricted. List of exclusions agreed through UB. ATLAS4identifiers BABAR9 CALICE2 CMS7 Dteam1 LHCb4 MINOS24(3 months after working Castor reduces to 8) TOTAL51 Includes some AFS accounts.

U B 3 Tier 1 Squeeze – 2008/Q1 Headroom ATLAS CPU March CPU capacity= 1439 KSI2K March Requests= 2640 KSI2K CPU over-allocated for 2008/Q1 Pain spread by fairshare system. CPU March CPU capacity= 1439 KSI2K March Requests= 2640 KSI2K CPU over-allocated for 2008/Q1 Pain spread by fairshare system. DISK March Disk capacity= 922TB March Disk requests= 920.8TB March Headroom=1.2TB ATLAS/CMS/LHCb got 70% of their request. BaBar reduced from 100TB to ~41TB. All other experiments frozen until March. “Special measures” taken through the quarter. Living dangerously! DISK March Disk capacity= 922TB March Disk requests= 920.8TB March Headroom=1.2TB ATLAS/CMS/LHCb got 70% of their request. BaBar reduced from 100TB to ~41TB. All other experiments frozen until March. “Special measures” taken through the quarter. Living dangerously!

U B 4 Tier 1 Disk Squeeze ATLAS (291TB) CMS (242TB) LHCb (116TB) BaBar(49TB) ALICE (5.9TB)

U B 5 Tier 1 Disk Use ExperimentDisk Used (7 March) ALICE0% ATLAS72% CMS34% LHCb57% BaBar71% MINOS65%

U B 6 Tier 1 CPU Fairshares...Allocated Reality… CMS ATLAS BaBar LHCb ATLAS BaBar CMS LHCb ALICE

U B 7 LHC approaches! Friday 7 March 2008 CMS Plenary 25 Feb Machine cold by 1 June? Protons could be injected by mid-June.

U B 8 Not only LHC Experiments HEALTH WARNING!

U B 9 Tier Ramp Up CPU (67%) Disk (39%) Tape (54%) Current Allocated/Total Dec 2008 Request 2008 Request Latest procurement should satisfy all experiment 2008 requests if they don’t change. Need to worry about 2009 now.

U B 10 dCache – Castor2 Migration Castor Data Timeline 20 June. At the UB meeting it was agreed that 6 month notice be given for dCache termination. 26 November. Proposal to terminate dCache by end of May. Going to be Tight…. LHCb – all disk data migrated and 60% of tape data. ATLAS – disk and tape migration ongoing (?). On 20 Feb, 12TB trimmed from CMS allocation to help ATLAS migration (270TB allocation+20TB). ALICE – Updated request received 25 Jan. Allocated one server on 6 February. Need xrootD plug-in. MINOS – agreed 3 month period from date of working Castor instance.

U B 11 User Support Posts - GridPP3 Janusz Martnyiak (Imperial) = 50% FTE Ex-portal post. Technical assistance with Grid related software, interfacing experiments to middleware, development of tools, etc. First priority is to help smaller non-LHC experiments to get established on the Grid. LHC projects, generic PP tools (eg. Ganga) and KE with non-HEP VOs also possible work areas. Experiments bid through UB chair for support. MICE (Ganga and LFC) already approved and some SuperNemo work (LFC). Stephen Burke (RAL) = 50% FTE Documentation post. Focussed on immediate and short-term issues. For example, helping answer technical enquiries (outside ticket system), trouble-shooting user/VO problems, locating suitable documentation, etc.

U B 12 The End (and The Start) GridPP3 GridPP2

U B 13