1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting 02.09.06.

Slides:



Advertisements
Similar presentations
Overview What is market research (MR)? Why do MR? Who does MR? When do you do MR? How do you do MR? Market Research Principles.
Advertisements

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Trademark Fee Cost Analysis Status Update for TPAC November 2009.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
Module 9 Session 9.2 Visual 1 Module 9 Designing Control and Reporting Systems (Time, Cost, Resources and Scope (Performance and Quality)) Session 9.2Managing.
The BIM Project Execution Planning Procedure
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project Management Process Overview
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Progress Monitoring Plan Information and Procedures August Part 2.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
7 June 2012 Guidelines for the Compilation of Water Accounts and Statistics Guidelines for the Compilation of Water Accounts and Statistics UN Statistics.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
Forming. Context 113 Catholic elementary and secondary schools in 19 counties of southwest Ohio Demographic, financial, programming, and enrollment challenges.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
IT Services Transition Weekly Program Management Working Session February 22, 2011 | Tuesday | 11:30am – 1:00pm.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Progress Monitoring Plan Information and Procedures August Part 2.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
►Reggie Townsend, Account Director ►Olga Masevich, Project Manager ►Miquel Lewis, Strategy Consultant ►Jean McDonnell, Strategy Associate ►Nicole Lun,
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Long Term Move-In Move-Out Development Strategy August 19, 2002 DRAFT.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
California Community Colleges Classified Senate
Conventional Facilities and Siting Global Group (ARCFS)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Central / Mother Lode Regional Consortium Planning Conference
All Wales Safeguarding Procedures Review Project
David Salazar, Chief Facilities Executive
Executive Director, Atkinson Review
Presentation transcript:

1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting

2 of 5 CURRENT STATUS Weekly Video Meetings Continue Weekly Video Meetings Continue CFS WBS Draft and Internal CFS Review Complete CFS WBS Draft and Internal CFS Review Complete CFS WBS Dictionary First Draft Ready for Internal Review CFS WBS Dictionary First Draft Ready for Internal Review Points of Contact with Area System Groups to be Finalized at 02.13/14.06 Fermilab Meeting Points of Contact with Area System Groups to be Finalized at 02.13/14.06 Fermilab Meeting CFS Draft WBS and Dictionary will be Provided to the Design and Cost Board Prior to GDE Meeting in Bangalore CFS Draft WBS and Dictionary will be Provided to the Design and Cost Board Prior to GDE Meeting in Bangalore V. KUCHLER GDE Executive Committee Meeting

3 of 5 STRATEGY FOR WBS/COST DEVELOPMENT Identify WBS Line Item Elements Identify WBS Line Item Elements Generate the First Draft WBS Dictionary Generate the First Draft WBS Dictionary Review Level of Detail Hierarchy and Line Item Elements Review Level of Detail Hierarchy and Line Item Elements Complete First Draft Internal (CFS) Review and Incorporate Adjustments as Needed Complete First Draft Internal (CFS) Review and Incorporate Adjustments as Needed Interact with Design and Cost Board to Resolve the Issue of System- Area-Discipline vs. System-Discipline-Area Hierarchy Interact with Design and Cost Board to Resolve the Issue of System- Area-Discipline vs. System-Discipline-Area Hierarchy Populate WBS Based on Existing Available Cost Data, Updated to Current Criteria and Review Populate WBS Based on Existing Available Cost Data, Updated to Current Criteria and Review Working with Area System Contacts, Develop Schematic Drawings and Criteria on which to Base the CFS Cost Estimating Effort Working with Area System Contacts, Develop Schematic Drawings and Criteria on which to Base the CFS Cost Estimating Effort Iterate Cost Data as More Defined Criteria is Developed Iterate Cost Data as More Defined Criteria is Developed V. KUCHLER GDE Executive Committee Meeting

4 of 5 NEAR TERM MILESTONES Prior to Bangalore Develop Final Draft of CFS WBS and Dictionary and Provide to Design and Cost Board Develop Final Draft of CFS WBS and Dictionary and Provide to Design and Cost Board Identify Points of Contact Between CFS and Area System Groups Identify Points of Contact Between CFS and Area System Groups At Bangalore Formalize Communication with Points of Contact Formalize Communication with Points of Contact Identify Means of Communication and Information Exchange Identify Means of Communication and Information Exchange Encourage Participation in Weekly CFS Video Conferences Encourage Participation in Weekly CFS Video Conferences Bangalore to Vancouver April - Divide CFS WSB into Three Parts. Each Region will Populate a Third of the WBS for Review by Full CFS Group. This will Identify Areas of the Cost Estimate that Require Further Definition and Revision and Needed Input from Area Systems April - Divide CFS WSB into Three Parts. Each Region will Populate a Third of the WBS for Review by Full CFS Group. This will Identify Areas of the Cost Estimate that Require Further Definition and Revision and Needed Input from Area Systems May - Continued Data Collection and Cost Development with a Full CFS Internal Review of First Draft Cost Estimate May - Continued Data Collection and Cost Development with a Full CFS Internal Review of First Draft Cost Estimate June - Provide First Full Draft CFS Cost Data to Design and Cost Board and Area System Groups Prior to Vancouver Meeting June - Provide First Full Draft CFS Cost Data to Design and Cost Board and Area System Groups Prior to Vancouver Meeting V. KUCHLER GDE Executive Committee Meeting

5 of 5 Summary There is A lot of Work to Do, but a Considerable Amount of Cost Data Already Exists and will be used as a Starting Point There is A lot of Work to Do, but a Considerable Amount of Cost Data Already Exists and will be used as a Starting Point The CFS Group as a Whole is Working Well Together and Can Be Supported by Regional Consultant Efforts The CFS Group as a Whole is Working Well Together and Can Be Supported by Regional Consultant Efforts If Working Sessions Could be Incorporated into the Bangalore Agenda the CFS Group Would Definitely Use Them to Establish Avenues of Communication with the Various Area System Groups If Working Sessions Could be Incorporated into the Bangalore Agenda the CFS Group Would Definitely Use Them to Establish Avenues of Communication with the Various Area System Groups The Time Between Vancouver and Valencia will be Spent Refining Our Cost Estimate and Formatting the Data on Which it is Based The Time Between Vancouver and Valencia will be Spent Refining Our Cost Estimate and Formatting the Data on Which it is Based The CFS Group will Identify Costs that Could Reasonably be Included as Part of a Region/Nation’s Bid to Host the ILC The CFS Group will Identify Costs that Could Reasonably be Included as Part of a Region/Nation’s Bid to Host the ILC V. KUCHLER GDE Executive Committee Meeting