How? With two timing systems:  FTLRS Stanford chronometer ( temperature controlled)  Dassault Timers as a reference What conditions?  Very short time.

Slides:



Advertisements
Similar presentations
George Ritchie.
Advertisements

Vladimír Smotlacha, CESNET Accurate Time Transfer over Optical Network 6 th CEF Networks Workshop Prague 13 September 2010.
RIGA Event Timer A032-ET Riga A032-ET in Graz. RIGA Event Timer A032-ET Eastbourne, October 2005  Graz uses routinely the Graz E.T. (Dassault Modules)
T-979: SiPM Time Resolution with DRS4 Readout Anatoly Ronzhin, Fermilab, AEM March 12, 2012 Team: Mike Albrow, Sergey Los, Pasha Murat, Erik Ramberg, Fermilab.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
Calibration Scenarios for PICASSO-CENA J. A. REAGAN, X. WANG, H. FANG University of Arizona, ECE Dept., Bldg. 104, Tucson, AZ MARY T. OSBORN SAIC,
Time Transfert by Laser Link T2L2 On Jason 2 OCA –UMR Gemini Grasse – FRANCE E. Samain – Principal.
SURVEYING II UNIT IV PRESENTATION II.
How long will the test last?
Photon counting detectors for future space missions Ivan Prochazka, Josef Blazej Ulrich Schreiber * presented at 16 th International Workshop on Laser.
PULSE REPETITION RATE OPTMIZATION IN SLR STATIONS TO PROVIDE MINIMUM SYSTEMATIC ERROR OF RANGING M.A. Sadovnikov M.A. Sadovnikov Institute for Precision.
1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
DEVELOPMENT OF A READOUT SYSTEM FOR LARGE SCALE TIME OF FLIGHT SYSTEMS WITH PICOSECOND RESOLUTION Considerations and designs for a system of tdc’s with.
Bernhard Schulz, Rene Laureijs, ISO Data Centre, ESA 1 Instrument Design in the Light of the ISOPHOT Experience Bernhard Schulz, Rene Laureijs ISO Data.
Progress in sub-picosecond event timing Ivan Prochazka*, Petr Panek presented at 16 th International Workshop on Laser Ranging Poznan, Poland, October.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Green Bank Laser Rangefinders.
6 July 2006First NDACC Water Vapor Working Group Workshop, Bern, Switzerland. 1 NDACC and Water Vapor Raman Lidars Thierry Leblanc JPL - Table Mountain.
Yu. Artyukh, V. Bespal’ko, E. Boole, V. Vedin Institute of Electronics and Computer Science Riga, LATVIA 16th International Workshop on Laser.
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
+ Proximity Sensors Tahani Almanie | Physical Computing.
Range Measurement Unit Messenger Mercury Laser Altimeter Basic Familiarization.
Lesson 5 What devices do we use to measure radon?.
CNS Systems, Inc. Communication, Navigation and Surveillance © 2002 CNS Systems, Inc. GPS Receiver Test Bed at USNO Prepared for the 34th Annual Precise.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
AIDA design review Davide Braga Steve Thomas ASIC Design Group 9 June 2009.
Österreichische Akademie der Wissenschaften (ÖAW) / Institut für Weltraumforschung (IWF) Schmiedlstraße 6, 8042 Graz, Austria, Tel.: +43/316/ ,
VE2ZAZ – May 2011 Oscillator Frequency Performance Measurements By Bertrand Zauhar, VE2ZAZ
Laser Ranging Technique for ASTROD I Mission
GPS based time synchronization of PC hardware Antti Gröhn
Toby Shoobridge David Benham NERC Space Geodesy Facility Herstmonceux, UK
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Time and Frequency activities at CENAMEP Panama, 2015.
NSGF 2000 PICO EVENT TIMER HERSTMONCEUX SLR STATION.
System Operations Eastbourne, October 2005 Towards the 1-mm: -A realistic goal ? -A vision ? -A myth ? -???
Laser-Astrodynamics, Space Tests of Relativity, and Gravitational Wave Astronomy 3 rd International ASTROD Symposium – Beijing, China – July 2006 TIME.
Helium Contamination of Rubidium Clocks and its Effect on Gravity Meters Micro-g LaCoste, Inc. Derek van Westrum
Timing Distribution System (TDS) 9 April, 2010 Greg Deuerling Rick Kwarciany Neal Wilcer.
Capacitive transducer. We know that : C=kЄ° (A/d) Where : K=dielectric constant Є° =8.854 *10^-12 D=distance between the plates A=the area over lapping.
Timing Counter Report of Feb 20th, 2008 F.Gatti. Final Construction Phase of TC TC with fibers exposed TC upside down for Fiber APD gluing High reflectance.
VCSEL High Speed Drivers
KHz-SLR PC Board Eastbourne, October 2005 for kHz SLR Complete PC Board.
Beam Studies December 2014 Runs: 7820 – 7860 December 27, 2014.
NASA ESTO ATIP Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations 12/12/01 NASA Goddard - Laser Remote Sensing Branch 1 James B. Abshire,
Ivan Procházka, Jan Kodet presented at : seminart ACES – ELT Meeting, Fundamental Station Wettzell, Technische Univ.Muenchen, Germany May 8, 2009 Czech.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
1 Mid term – Laser Swarm Optical Receiving Payload Single-Photon Detection -Photonmultiplier tube -Single Photon Avalanche Diode(SPAD) Wavelength Estimation.
Ivan Procházka presented at : seminart Institute of Astronomical and Physical Geodesy, Technische Univ.Muenchen, Germany October 27, 2008 Czech Technical.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
I.Prochazka, Tech.Univ.Munich, Germany.October 27, 2008 Gaining confidence – Breadboard demo, Prague n The entire Time transfer experiment may be carried.
Grasse slr systems status - September 2005 l Slr fixed station (7835) definitively stopped » 30 years of fruitful operations » Telescope and mount moved.
N Co-location with other techniques or slr systems Annoucement of opportunity for Scientific projects including FTLRS operations GRGS/OCA Ftlrs Oca-Grasse.
Infrared Laser Test System Silicon Diode Testing 29 May 2007 Fadmar Osmić Contents: Setup modifications new amplifier (Agilent MSA-0886) new pulse generator.
A Time-To-Digital Converter (TDC) Harley Cumming Lisa Kotowski 1.
I.Prochazka,et al, KOM ESOC, Darmstadt, April 2016 SPACE SITUATIONAL AWARENESS PROGRAMME P2-SST-VII EXPERT COORDINATION CENTRES (PHASE 1) Contribution.
University of Science and Technology Astrogeodynamic Observatory Space Research Centre PAS Orange Poland - TPSAPoznan Supercomputing and Networking CenterPARTNERSPARTNERS.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
 13 Readout Electronics A First Look 28-Jan-2004.
Pulse energy measurement for the CTF lasers.
Signal Processing Session
A First Look J. Pilcher 12-Mar-2004
ANTARES time calibration
RADAR -Range and Bearing Discrimination and Accuracy.
Dynamical Models of Decision Making Optimality, human performance, and principles of neural information processing Jay McClelland Department of Psychology.
Multi-Pixel Photon Counter Readout Board
Time resolution measurement with Madison test-DAQ
TOF Clock Distribution
RPC Front End Electronics
Digital Circuits for Photon-Counting Pixel Detectors
Presentation transcript:

How? With two timing systems:  FTLRS Stanford chronometer ( temperature controlled)  Dassault Timers as a reference What conditions?  Very short time intervals: (internal cal. < 30 ns)  External calibration: (100 m to 300 m)  For satellites tracking: (400 km to km)  Time evolution (long-lasting effect ) F rench T ransportable L aser R anging S tation Chronometry accuracy estimation M.Pierron - D.Feraudy – M.Furia – F.Pierron – 0CA (Grasse) GEMINI – FTLRS staff FTLRS in Chania (Creta) Gavdos campaign – 04 to laser maintenance FTLRS in SanFernando (Spain) June 2004 Towards zero bias…

Rubidium Clock Steered to GPS Start Stop STANFORD Counter Start signal LASER Optical fiber START diode SPAD Signal Discriminator Card ECL NIM SPAD detector FILESFILES Stop signal Start signal Stop signal 10 MHz 2 DASSAULT Timers Return Pulse Laser Pulse On same events : Echo or noise Laser for start Photodiode for stop Without mutual perturbation In same Context : Start Distributor

Measurement results Roundtrip time from 15 to 55 ns close Internal calibration From 100 meters to 1 km close external calibration Few millimeters accuracy from 100 to 500 m Timing systems difference in ps to 5 km to km Calibration range Satellites range The best choice is when round trip time > 34 ns 25ps The difference between the 2 timing systems is less than 25 ps Variations can be accurately calibrated ~40ps in Crete Can explain part of data bias All this measurements are NOT time dependant

Very important to model the chronometry behavior at different ranges, and to processs the calibration value accordingly.CONCLUSION  Stanford Chronometer can achieve few milimeters accuracy during satellites tracking (from 400 to km).  Range near external calibration is easy to model. The correction to achieve for this external calibration can be tuned to 30/60 picos depending on the target’s range.  Values near internal calibration range are more difficult to evaluate, except when the roundtrip time is longer than 34 nanos. The difference between external and internal calibrations is about 50 picos (7.5 mm).