Port of Hood River Recreation Committee Meeting April 2, 2007 By: Andrew Jansky, P.E. Flowing Solutions Images are property.

Slides:



Advertisements
Similar presentations
Continuous Season-Long Ranch Headquarters Water tanks Salt Perennial Stream Map Legend Steep rocky range site Continuous Season-Long: Livestock placed.
Advertisements

Ash Recovery At Kingston Fossil Plant Kingston, Tennessee
1 Hurunui River Dissolved Reactive Phosphorus Concentrations and Loads A tool to manage periphyton growth ? Review of Ecan & NIWA Dataset of DRP measurements.
UAF CAMPUS COMMUNITY GARDEN Summer 2012 Chas Jones PhD student, Campus Community Garden Committee Chairperson
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
CITY OF SAN MARCOS/TEXAS STATE UNIVERSITY 2015 WORK PLAN BUDGETED CONSERVATION MEASURES.
San Francisco LTMS : Accomplisments And New Challenges SFBJV, March 29, 2011.
Partnerships and Processes Landfill Redevelopment.
Port of Hood River Waterfront Recreation Committee Hood River Delta Historical Overview Existing Conditions Future Changes.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.
2012 Southwest Wildfire Hydrology and Hazards Workshop Evan Friedman and Dr. Paul Santi Colorado School of Mines 3 April 2012.
2 Climate Change Implications for the Water Industry Dr Dan Green Wessex Water Services Ltd.
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Dr. Thomas Graziano Acting Chief, Hydrologic Services Division Office of.
Community Liaison Committee May 26, 2015 Bow Lake Wind Project.
Methods for the Estimation of Mine Infiltration Bruce Leavitt PE PG, Consulting Hydrogeologist Washington, Pennsylvania.
Community Program Space for Youth. Table of Contents Background Information Youth Needs Analysis 2010 Current Programming Need for Dedicated Space Facility.
CRFS March 30, Virgin River NWS-SWS: 90 NWS-ESP: (+8-15% El Nino weighted) NRCS daily: 80 NRCS statistical: 78 Coordinated: 80 / 195% median.
Lower Snake Modeling and LGR Monitoring Year 1 Report Summary Christopher Cook BPA Project
Sediment transport in wadi systems
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Lesson 2-4 Solving Equations with Variables on Both Side August 14, 2014.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
1 Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting February 19, 2008.
Application of Intelligent Transportation Systems (ITS) for Statewide Traffic and Evacuation Monitoring and Management in Louisiana April 16, 1999.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
Virginia’s Chesapeake Bay Nutrient Credit Trading Program
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
County & Regional Context State Parks & Urban Open Space Federal and National Parks - city to wildland social issues of St. Edward park.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
NWSChat ( NWSChat Enhanced Communications for Decision Support.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
Natural Hazards Science: Reducing America’s Risk from Floods David Ford David Ford Consulting Engineers.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Item Th14a A2 City of Encinitas Opportunistic Beach Replenishment Program California Coastal Commission August 14, 2014 Meeting Presentation A2.
Managing Climate Change and Rising Sea Levels in the Estuary DP World London Gateway Port and Park Marcus Pearson Environmental Manager.
Evaluation Measures for Municipal Storm Water Management Programs Daniel Rourke Fresno Metropolitan Flood Control District October 15, 2003 Counting Raindrops.
Climate Change GLSGN Meeting Alexandria Bay, NY June 16, 2009.
Colorado River Basin: Overview of Determining Lake Powell and Lake Mead Annual Operational Tiers WSWC Seasonal Precipitation Forecast Workshop December.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Peter Gabrielsen Chief, Hydrologic Services Division Eastern Region NOAA’s.
December 14, 2015 W E L C O M E SIMONTON LAKE H.O.A.
Effects of N Loadings from Dairy Cows to the Susquehanna River Effects of N Loadings from Dairy Cows to the Susquehanna River Austin Weidner CE394K : GIS.
BC Columbia Basin Local Governments’ Perspectives on the CRT Columbia River Treaty: Past, Present and Future Osoyoos, BC October, 2015 With support from.
Colorado Basin River Forecast Center Greg Smith Senior Hydrologist National Weather Service Colorado Basin River Forecast Center January 25, 2011 Navajo.
Apalachicola River, Floodplain and Bay Largest forested floodplain in Florida (112,000 acres) Highest Species Diversity of any River System in North America.
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air, Land and Water MAINE.
CAMP GABIKA Andrew Thomson, Chelsea Community Education & Recreation Amount Requested: $8,100 Intervention also funding in:  Year 1: $0  Year 2: $13,000.
California State Lands Commission Santa Barbara Channel Hazards Removal Program California State Lands Commission Meeting April 6, 2011 Curtis Fossum Executive.
Bow Basin Watershed Management Plan Revised Terms of Reference
Methods for the Estimation of Mine Infiltration
Groundwater Learning objectives
Identification on Significant Pressures - Surface Water Bodies
Low Cay is a stunning private island surrounded by coral white sandy beaches, with shallow water on the west coast perfect for swimming.
Design of a Commercial Shopping Center
Klamath ADR Hydrology Report
Topographic Difference Models
Introduction to Development of a city-wide traffic calming program
River place improvement committee
Storm Water Storage and Treatment
May 10, 2018.
Pearce Creek DMCF Baseline Exterior Monitoring Spring 2017 Results
Presentation transcript:

Port of Hood River Recreation Committee Meeting April 2, 2007 By: Andrew Jansky, P.E. Flowing Solutions Images are property of their creator, please do not reuse without permission

Port of Hood River Recreation Committee Meeting April 2, 2007 Hood River Delta –Existing Conditions –Spring/Summer Recreation Season –Future Actions

1935

Comparison

Current Conditions

Quantities Original Sand Bar – 60 acre incl. shallow area Additional Sand Bar area - 26 acres –Additional sand volume = 750,000 cy Additional Sand on existing bar –Estimated at 8 ft average = 750,000cy Removal by dredge/land only during inwater work period (Nov-Feb)

Recreation User group coordination – in progress Safety measures –Clear hazardous wood/debris –Mark hazard areas/buoys –Upland signage with graphics –Handouts/education/Schools –Swimming –Other Management –Vehicles –Camping

Concentration of Debris

Elevations/Pool Information Pool Elevation impacts sand bar size Small change=big change at sand bar Pool elevation changes hourly Daily prediction difficult

Commerce Basin Access Enhance Event Site Beach Dredge –Access/Water Quality –Schedule – Next Work Window –Volume – 150, ,000 CY –Work by land or water Risk – Future Accretion

Monitoring Spring Freshet Changes –High flows in spring may reduce elevation –No significant changes to area anticipated –Pool manipulation possible, limited results Pool monitoring –Basic – visual staff gauge –Web camera on gauge –Automatic elevation monitoring/web

Future Actions Develop plan –Short term –Long term Prepare permits Funding

Questions/Discussion