Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.

Slides:



Advertisements
Similar presentations
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Advertisements

9/13/2007 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
CRR Update to CMWG Matt Mereness Manager, DAM and CRR Auction Congestion Management Working Group June 5, 2013.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
CRR Update Dave Maggio CMWG July 18, CMWG 7/18/ Transaction Limit Utilization Metrics Discussion on Special “One-Time” Auctions of CRRs Upcoming.
Texas Nodal 1 Texas Nodal Settlements Mini-Market - CRR July 31, 2007.
Review of NPRR586 CMWG 1/7/2014. Existing Credit Lock Process ERCOT calculates a “preliminary allocated CRR transaction limit” based on “eligible” CRRAHs.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Lead from the front Texas Nodal 1 Texas Nodal CRR Requirements Overview of Requirements for TPTF Shawna Jirasek and Beth Garza September.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
CMWG Update to WMS Report of CMWG Meetings of &
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
CRR Update to CMWG ERCOT CRR Team Congestion Management Working Group Aug 7, 2013.
ERCOT Clarification for PCRR Allocation Terms and Conditions Should this sentence be included under Refund option [Section 7.4.2(c)(i)] Before the applicable.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
1 WMS Report TO TAC April 2007 (which is in March)
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
1 NPRR 484/554 Phase 2 Suresh Pabbisetty, ERP, CQF, CSQA Lead Technical Analyst, Credit CWG / MCWG May 20, 2015 ERCOT Public.
Total Potential Exposure (TPE) Overview Credit Work Group May 28, 2008 Cheryl Yager.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
CMWG Update to WMS Report of CMWG Meeting of
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Re-Execution of the February ’16 Monthly CRR Auction David Maggio & Mark Ruane Technical Advisory Committee January 28 th, 2016.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
CRR Deration and NPRR821 WMS 09/06/2017.
2017 Seasonal Adjustment Factors
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Calculating CRR Auction Portfolio Exposure:
Ancillary Service Trades and Ancillary Service Settlement
Settlements Analysis due to SFT Deration Issue
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Presentation transcript:

Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014

CMWG 2/17/14 2 In reviewing the Protocol language, it was noticed that the language around the settlement of FGRs in section 7 is not in line with other Protocol sections The language was specifically developed to consider the McCamey Area flowgate This FGR was removed from Protocol by NPRR 195 and no other FGRs are currently defined ERCOT wanted to discuss potential solutions for resolving the misalignment with CMWG to determine the best step forward Introduction

CMWG 2/17/14 3 Language for settling in DAM: Payments for FGRs Settled in DAM (1)If a Flowgate Right (FGR) is competitive, i.e., all directional network elements associated with the FGR are Competitive Constraints, ERCOT shall pay the owner of the FGR an amount equal to the sum of the Shadow Price of the hour for each directional network element associated with the FGR for each contingency (including the null contingency or base case) normalized to the impact of the principal network element of the FGR (the normal rating of which is used to determine the total MW amount for the flowgate). The payment to each CRR Owner for its FGRs determined by the principal network element of each flowgate for a given hour is calculated as follows: …………………………………………. (2)If an FGR is non-competitive, i.e., one or more directional network elements associated with the FGR are Non-Competitive Constraints, the FGR payment may be reduced due to Transmission Elements that are oversold in previous CRR Auctions. The payment for any FGR, when it is non-competitive, will be specified upon introduction of the FGR. The is also language addressing if DAM does not run (section ) Existing Protocol Language

CMWG 2/17/14 4 One option would be to develop new language to address the current misalignment –This would most likely require changes to ERCOT systems –The changes may not reflect the unique nature of any FGRs that may be later defined Another option would be to remove the existing FGR settlement language and develop the appropriate settlement language once and if an FGR is defined –This would also likely require changes to ERCOT systems, but it would defer that impact until such time that an FGR is again defined in Protocol Potential Steps Moving Forward