Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.

Slides:



Advertisements
Similar presentations
What is PACMAN Training Network? Marie Curie Innovative Doctoral Program hosted by CERN Particle Accelerator Components’ Metrology and Alignment to the.
Advertisements

Solomon William KAMUGASA
Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Measuring the magnetic axis of quadrupoles by a stretched wire Domenico Caiazza CLIC Workshop 2015.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
CLIC-PACMAN: BPM-to-Quadrupole Alignment based on EM Field Measurements Manfred Wendt CERN BE-BI-QP.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A. Aloev, E. Solodko, P. Thonet, A. Vorozhtsov “CLIC magnets developments” “CLIC Project.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
S. Russenschuck, CLIC-Workshop, WP2-Pacman, R&D projects on rotating coil probe and stretched wire techniques for CLIC / PACMAN Stephan Russenschuck.
WP5. Training N. Catalán Lasheras. Outline Introduction Existing vs. new training General training for all ESRs Training by work package Secondments in.
H. MAINAUD DURAND PACMAN WP0 OUTLINE Project management structure Project monitoring PACMAN key milestones & deliverables Schedule Funding consideration.
Introduction to PACMAN Work Package 2 Magnetic Measurements
Midterm Review 28-29/05/2015 Iordan Doytchinov ESR3.1, WP3 1.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
H. MAINAUD DURAND PACMAN goals and partners A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
Midterm Review 28-29/05/2015 Silvia ZORZETTI ESR4.1, WP4 1.
ESR 3.1 Introduction Iordan Doytchinov
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Status of training program N. Catalán Lasheras
November : PACMAN Kick-off Meeting Introduction to Work Package 3: “Precision mechanics and stabilization” Michele Modena - CERN.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
WP5. Training N. Catalán Lasheras. Outline Introduction Existing vs. new training General training for all ESRs Training by work package Secondments in.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
PACMAN : technical objectives Hélène Mainaud Durand.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
1 1 Uncertainty analysis of a vibrating-wire system for magnetic axes localization Pasquale Arpaia, Dip. di Ingegneria Elettrica e Tecnologie dell’Informazione,
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
CLIC technology developments Scope of “CLIC technology Developments” =: TD Present situation; some flashy positive results (short) Outlook for 2018 Summary.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND PACMAN training network A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
Two-beam module layout
David Tshilumba ESR3.3, WP3.
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Industrial involvement in EU funded programs: the PACMAN project
Ddd 4-Slides Challenge Silvia Zorzetti.
WP1 Metrology & Alignment
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Presentation transcript:

Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals of the project Review of the subjects proposed Organization of the project Web site CLIC workshop /02/2014 H. Mainaud Durand, on behalf of the PACMAN team

Scientific goals of the project Introduction to the CLIC project challenges: Sub-µm beam size, down to a few nm at the IP A number of challenges to be mastered, among which: o Very tight tolerances of alignment of components, to about 10 µm over a distance of 200m o Active stabilization of the quadrupoles in the nanometre range required 2

Scientific goals of the project Introduction to the CLIC project Based on a two beam acceleration concept Each linac consists of more than modules (with a 2m length) 3

Scientific goals of the project Introduction to the CLIC project Different types of components: Quadrupoles : o MB quadrupoles: ~ 4000 o DB quadrupoles: ~ BPM: one per each quadrupole Accelerating structures: ~ PETS components: ~

Scientific goals of the project Starting point = challenge concerning the pre-alignment of the CLIC components. Requirements: Current strategy Series of steps: fiducialisation of the components and their support, alignment on a common support, alignment in the tunnel using sensors fiducials. but time and precision consuming considering the number of components to be aligned… The zero of each component will be included in a cylinder with a radius of a few microns:  14 µm (RF structures & MB quad BPM)  17 µm (MB quad)  20 µm (DB quad) Active alignment consists of two steps:  Determination of the position by alignment sensors  Re-ajustment by actuators 5

6 Fiducialisation of components Fiducialisation of their common support Alignment on a common support Whole assembly ready to be aligned

7 Special case of MB quadrupole One additional step: the stabilization / nano-positioning system

Scientific project PACMAN project: Propose and develop an alternative solution integrating all the alignment steps and technologies at the same time and location (CMM machine) Technologies concerned: Beam Instrumentation Metrology Micrometric alignment Nano positioning Magnetic measurements Ultra high precision engineering RF 8

Scientific goals of the project Long term Automation of the process Simplification (method, duration, components) Extrapolation to other components Optimization of performances and precision in all domains Preparation of industrialization Key activities: Integration, ultra-high precision engineering and manufacturing Magnetic measurements with a vibrating stretched wire (and alternative based on printed circuit boards rotating search coils) Determination of the electromagnetic centre of BPM and RF structure using a stretched wire Absolute methods of measurements: new measuring head for CMM, combination of FSI and micro-triangulation measurements as an alternative Improve seismic sensors and study ground motion Nano-positioning system to position the quadrupole and BPM Outcome = a prototype alignment bench 9

PACMAN  WP1: metrology and alignment ESRSubjectSecondmentUniv.CERN Superv. 1.1Non contact high precision sensor for Leitz Infinity Coordinate Measuring Machine Hexagon (3M+2M) Cranfield University H. Mainaud Durand (A. Cherif) 1.2Development and validation of an Absolute Frequency Scanning Interferometry (FSI) network Etalon (3M)ETHZJ-C Gayde 1.3Micro-triangulation for high accuracy short range measurements of dynamic objects Etalon (3M), ETHZ (3M) ETHZF. Fuchs

PACMAN  WP2: magnetic measurements ESRSubjectSecondmentUniv.CERN Superv. 2.1Stretched wire systems for the magnetic measurements of small-aperture magnets Sigmaphi (3M), Metrolab (3M) SannioS. Russenschuck 2.2Printed circuit board technology for small-diameter field probes Eltos (3M), Sigmaphi (2M) SannioM. Buzio Main goals: develop instruments and methods to measure the position of the magnetic axis of quadrupole magnets within an absolute uncertainty of 10 m. develop instruments and methods to measure the field strength and quality (polarity, direction, harmonic content) of multipole magnets within an aperture as small as 4 mm Constraints integration with other equipment on the test stand scalability to very large industrial production (issues: automation, robustness, cost, speed)

PACMAN  WP3: precision mechanics and stabilization ESRSubjectSecondmentUniv.CERN Superv. 3.1Ultra-precise quadrupole magnets assembly and testing. Integration of an alignment test-bed towards an industrial production DMP (4M)Cranfield University M. Modena 3.2Seismic sensor development and vibration characterizationLAPP (7M), DMP (3M) Savoie, SYMME A. Gaddi 3.3Nano-positioning of the main LINAC quadrupole as means of laboratory pre-alignment TNO (6M) with TU delft TU DelftH. Mainaud Durand (K. Artoos) ESR 3.1 taks: To complete the MBQ quadrupoles design, focusing on the critical performance aspects like PRECISION of the assembly, LIMITATION of the assembly time, COST minimization To integrate the different contributions of the PACMAN development (metrology, alignment, magnetic measurement, mechanical assembly, microwave technology), in a final integrated assembly test stand ESR 3.2 tasks: To upgrade or develop seismic sensors which are suitable for measurement at sub- nanometre scale with a large bandwidth covering the whole frequency region of interest ( Hz). ESR 3.3 tasks: To upgrade and integrate in the PACMAN stand a nano-positioning system for the MBQ magnets. This system will be needed for the alignment of the magnet during Modules assembly and for the beam steering during the CLIC accelerator operation.

PACMAN  WP4: Beam instrumentation ESRSubjectSecondmentUniv.CERN Superv. 4.1Alignment and resolution of a Beam Position Monitor operating at microwave frequencies in the nanometre regime NI (3M)ValenciaM. Wendt 4.2Development of direct measurement techniques for the in-situ internal alignment of accelerating structures NI (3M)ValenciaN. Catalan Lasheras – ESR4.1: Alignment between a CLIC/CTF 15 GHz cavity BPM and the Main Beam quadrupole A stretched-wire method could be utilized to align the center of the magnetic field of the quad to the center of the dipole mode of the BPM TM110 resonator. A similar method has been successfully demonstrated in the μm regime on a stripline-BPM/quad combination (DESY-FLASH). –ESR4.2: Alignment between wakefield monitors and CLIC accelerating fields Minimization of the transverse wakefields (beam blow-up) over several accelerating structures.

Marie Curie action 14 PACMAN project belongs to an Initial Training Network (ITN):  Improve career perspectives of Early Stage Researchers (ESR) in both public and private sectors  Make research career more attractive PACMAN is an Innovative Doctoral programme (IDP): o Management at CERN o ESRs must be working towards a PhD o Secondment of at least 3 months in industry for each ESR o Associated partners from industry and universities PACMAN will offer training to 10 ESRs Total EU contribution: 2,671, EUR

PACMAN : associated partners DMPES ELTOSIT ETALONDE METROLABCH SIGMAPHIFR Cranfield UniversityGB ETH ZürichCH LAPPFR SYMMEFR University of SannioIT IFICES Delft University of TechnologyNL Hexagon MetrologyDE National InstrumentsHU TNONL 15

WP6 Diss & Outreach M. Modena Supervisory Board CERN, HEXAGON, ETALON, ELTOS, METROLAB, DMP, SIGMAPHI, TNO, NI DELFT, CRANFIELD, SANNIO univ., LAPP, ETHZ,IFIC, SYMME WP0 Management H. Mainaud Durand WP5 Training N. Catalan Lasheras WP4 Beam Instrumentation M. Wendt WP3 Precision mech. & stabilization M. Modena WP2 Magnetic Measurements S. Russenschuck WP1 Metrology & Alignment H. Mainaud Durand ESR1.3 ESR4.1 ESR3.1 ESR3.2 ESR3.3 ESR2.2 ESR2.1 ESR1.2ESR1.1 ESR4.2 Management team Admin. Assistant: Alexandra Hati 16 Organization of the project

Start date = 1/09/ students out of 10 recruited Recruitment of the 10 th student under progress 3 students have started on the 3 rd of February

Conclusion PACMAN project is a golden opportunity for CLIC: o To push technologies and methods to improve the alignment of the CLIC components, which is a critical challenge for the project o To have a network of industries in order to provide solutions for the future, towards a CLIC approval The technical objectives are ambitious but well defined. A very high quality training program will be proposed to the 10 PhD students: o training through research at CERN and at universities, o exchange of knowledge through secondments in the industrial partners, o Scientific, academic and technological training courses including trainings organized by PACMAN o Transferable skills training courses 3 PACMAN workshops will be organized, with training and dissemination purposes, combined with a rich program of dedicated outreach activities 18